IR 05000321/1989005

From kanterella
Revision as of 07:22, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-321/89-05 & 50-366/89-05 on 890320-24 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Records & Repts & Testing & Maint
ML20245B744
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/13/1989
From: Mcguire D, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20245B743 List:
References
50-321-89-05, 50-321-89-5, 50-366-89-05, 50-366-89-5, NUDOCS 8904260251
Download: ML20245B744 (1)


Text

LT E ,mgD SAFEGUA8,QSMDRMATION

/ L o NUCLEAR REGULATORY COMMISSION-p ' *- ,j, REGION ll 1g j 101 MARIETTA STREET, '

  • r' ATLANTA, GEORGI A 30323 L

p

\,**..*/

e Report'Nos.: 50-321/89-05 and 50-366/89-05 Licensee: Georgia Power Company P. D. Box 1295 Birmingham, AL 35201 Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5 Facility Name: Hatch I and'2 Inspection Conducted: March 20-24, 1989-Inspector: k) . Dar>m

k-lb Date Signed S

D. Thompson,PhysiplSecurityInspector Accompanying Personnel: it. Manilli, Reactor Security Specialist

, Nuclear Reactor Regulation Approved by: .7 D. R. McGuire, Chief ON 06te 51gn6d Physical Security Section Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced inspection was conducted in the areas of Management Support, Security Program Plans, Records and Reports, Testing and Maintenance, Assessment Aids, Access Control - Personnel, Packages and Vehicles, Alarm Stations, Communications, Locks, Keys, and Combinations, Personnel Training and Qualifications - General Requirement Results: In the areas inspected, violations or deviations were not identifie The licensee has taken aggressive action to correct previously identified violations and inspector follow-up items. Additionally, the HQ Nuclear Reactor Regulation Licensing Reviewer indicated that the Training Program was one of the most progressive he had observe The latest addition to the present excellent training facilities is the shoot no shoot pistol range, which the licensee has modified to provide realistic site specific shoot no shoot scenario g

{DR ADOCK 05000321 PDC caccret irrun e+ hewn I cambr$ ten 5 doc un(2nf cd

.

_ _ _ _ - _ _ _ - _ - - %3OJOUL- j