ML20195D148

From kanterella
Revision as of 20:05, 16 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-219/88-13 on 880424-0521 & Notice of Violation
ML20195D148
Person / Time
Site: Oyster Creek
Issue date: 06/14/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20195D155 List:
References
NUDOCS 8806230052
Download: ML20195D148 (2)


See also: IR 05000219/1988013

Text

. - ._ .

,

j J.

.F.

4 .

.

&

, JUN 14 tggg

Docket / License: 50-219/DPR-16

GPU Nuclear Corporation

ATTN: Mr. Eugene E. Fitzpatrick

Vice President and Director

Oyster Cre:L Nuclear Generating Station

'

, P. O. Box 388

Forked River, New Jersey 08731

Gentlemen:

Subject: Inspection Report No. 50-219/88-13

This refers to the routine safety inspection conducted by Messrs. J. Wechselberger,

E. Collins, W. Baunack, and M. Markley April 24 through May 21, 1988, at the Oyster

Creek Nuclear Generating Station. The inspections consisted of document reviews,

interviews and observations of activities as documented in the enclosed inspection

report. The findings were discussed with you and other members of your staff at

the conclusion of the inspection.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A. The violation has been

categorized.by severity level in accordance with the "General Statement of Policy

and Procedure for NRC Enforcement Actions," 10 CFR Part 2 Appendix C (Enforc.ement  !

Policy). You are required to respond to this letter and in preparing your response

j you should follow the instructions in Appendix A.

Your cooperation with us in these matters is appreciated. .

l

Sincerely,

kleisal Signed M

aosa,artteneuman

I

Lee H. Bettenhausen, Chief l

Projects Branch No. 1 <

Division of Reactor Projects I

l

Enclosure: NRC Region I Report No. 50-219/88-13 l

'

cc w/ enc 1:

M Laggart, BWR Licensing Manager

Licensing Manager, Oyster Creek

Public Document Room (PDR)

a Local Public Document Room (LPOR)  !

Nuclear Safety Information Center (NSIC)

,

NRC Resident Inspector

i State of New Jersey

0FFICIAL RECORD COPY DL50-219/88-13 - 0001.0.0 g(

8806230052 880614

"

gDR ADOCK 0500 9 g/

l

- - - - - - -'

._ -

,., ,

, -

,

GPU Nuclear Corporation 2 JUN : 41988

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

Robert J. Bores, DRSS

DRS Director

DRSS Director

>

.

RI:DRP RI:DRP R :DRP

9 Wechselberger/me 2Cowgill enhausen

fy 6/8/88 '[//p/gg

1 /f, 0FFICIAL RECORD COPY DL50-219/88-13 - 0002.0.0

06/08/88

,_ _ . _ _ _ - _ _ _ _ _ - _ _ - _ _