ML20058H94216 November 1990Forwards List of Unimplemented Generic Safety Issues at Facility,Per Generic Ltr 90-04
ML20058J0459 November 1990Forwards Insp Rept 50-219/90-20 on 901022-26.No Violations Noted.Review of Preparations for Drywell Occupancy During Fuel Movement Identified Areas of Concern
ML20058C72924 October 1990Discusses Insp Rept 50-219/90-80 on 900625 & 29 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Considered Severity Level III & Involved Unqualified Operators at Reactor Controls
IR 05000219/198908118 October 1990Ack Receipt of Informing NRC of Actions Taken to Correct Violations Noted in AIT Insp Rept 50-219/89-81 Re RPS Low Vacuum Setting
ML20058A82418 October 1990Forwards Safety Insp Rept 50-219/90-16 on 900823-0922 & Notice of Violation
ML20058A63818 October 1990Forwards SE Conditionally Accepting Util Insp & Repairs for Igscc,Per Generic Ltr 88-01
ML20058A66016 October 1990Forwards Request for Addl Info Re Drywell Corrosion Program, Including Sampling of Shell Surfaces for UT Measurements
ML20062B86412 October 1990Extends Invitation to Attend 910220-21 Util Symposium/ Workshop in King of Prussia,Pa Re Engineering Role in Plant Support
ML20062A68711 October 1990Documents Review of Util 900921 Integrated Schedule ABC List Update.Listed Projects Acceptable Except for Items B/A-328 ADA & B/A-402946
ML20058F3213 October 1990Forwards Safety Insp Rept 50-219/90-17 on 900918-21.No Violations Noted.Schedule for Identification & Disposal of Contents of Tanks in Old Radwaste Bldg Requested within 45 Days of Ltr Date
IR 05000219/19900091 October 1990Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/90-09
ML20059M52021 September 1990Forwards Safeguards Insp Rept 50-219/90-15 on 900820-24.No Violations Noted
ML20059J80211 September 1990Advises That Util 900621 Response to Open Item Re USI A-46 & Schedule,Acceptable.Requests That Util Confirm Seismic Adequacy of CRD Hydraulic Control Units within 30 Days of Completion of WalkdownBackfit
ML20059H3296 September 1990Advises That 900831 Commitment to Install Hardened Wetwell Vent at Plant AcceptableHardened vent
Backfit
ML20059G3915 September 1990Recognizes Efforts of G Bond & W Douglas Re Implementation of Emergency Response Data Sys (ERDS) Link at Facility. ERDS Link at Facility Operational & Should Be Implemented in Emergency Response Planning
ML20058Q43615 August 1990Forwards Safety Insp Rept 50-219/90-11 on 900610-0711. Unresolved Item NotedStroke time
ML20058P0809 August 1990Forwards Requalification Program Evaluation Rept 50-219/90-05OL on 900409-0608.Util Should Respond within 30 Days of Receipt of Ltr Confirming Corrective Actions Committed to During 900424 Interim Exit Meeting
ML20058M3588 August 1990Requests Addl Info Listed in Encl Re Util 900521 & 0720 Responses to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow. Info Requested within 10 Days of Receipt of Ltr
ML20058N0776 August 1990Discusses Licensee Engineering Initiatives.Encourages Initiation of Initiative Similar to Region V Licensees Establishment of Engineering Managers Forum to Share Experiences
ML20056A60720 July 1990Forwards Insp Rept 50-219/90-09 on 900422-0609 & Notice of Violation.Util Should Identify & Correct Any Programmatic Weaknesses Re Failure to Perform Adequate Radiation Surveys
ML20055G41411 July 1990Requests Util Provide Ref Matls Listed in Encl for Senior Reactor Operator Licensing & Requalification Exams Scheduled for 901015Job Performance Measure
ML20058K50628 June 1990Forwards Supplemental Safety Evaluation for Plant Dcrdr. NRC Concludes That Licensee Submittal Meets NUREG-0737, Suppl 1 Dcrdr Requirements & Therefore,Issue Considered Resolved
ML20055E30215 June 1990Forwards Backfit Analyses for Plant Re Installation of Hardened Wetwell Vent,Per Generic Ltr 89-16Probabilistic Risk Assessment
Systematic Assessment of Licensee Performance
Containment Hardened Vent
Hardened vent
Backfit
ML20059M83213 June 1990Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl
ML20055C31716 February 1990Forwards Safety Insp Rept 50-219/89-29 on 891203-900106 & Ack Receipt of 900115 & 19 Responses to Insp Repts 50-219/89-21 & 50-219/89-27
ML20248B55127 September 1989Informs of Correction to NRC Re Util Response to Generic Ltr 88-11
IR 05000219/198900322 September 1989Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/89-03
NUREG-1382, Forwards Draft NUREG-1382, SER Re Full-Term Operating License for Oyster Creek Nuclear Generating Station, for Review20 September 1989Forwards Draft NUREG-1382, SER Re Full-Term Operating License for Oyster Creek Nuclear Generating Station, for ReviewSafe Shutdown
High winds
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Squib
Scram Discharge Volume
Process Control Program
Stress corrosion cracking
Systematic Assessment of Licensee Performance
Safeguards Contingency Plan
Earthquake
Control of Heavy Loads
Turbine Missile
Fuel cladding
Generic Issues Program
Fire Protection Program
Backfit
Unidentified leakage
Overspeed trip
Water rod
Thermal fatigue
Loss of condenser vacuum
Water hammer
ML20247K44914 September 1989Forwards Insp Rept 50-219/89-18 on 890724-28.No Violations Noted
IR 05000219/198900514 September 1989Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/89-05
ML20247K97712 September 1989Forwards Safety Insp Rept 50-219/89-20 on 890829-30.No Violations Noted
ML20247H7208 September 1989Forwards Corrected SALP Rept 50-219/87-99 for Oct 1987 - Jan 1989Systematic Assessment of Licensee Performance
ML20246M72630 August 1989Forwards Safety Evaluation Accepting Licensee 890624 Response to Integrated Plant Safety Assessment Section 4.11, Seismic Design Consideration, Items 4.11(1), Piping Sys & 4.11(3), Electrical Equipment
ML20246J59624 August 1989Forwards Safety Insp Rept 50-219/89-16 on 890702-29 & Notice of Violation.Attention Required to Ensure Engineering Evaluations of Potential Safety Problems PerformedUnanalyzed Condition
ML20246G16421 August 1989Forwards SALP Final Rept 50-219/87-99 on Oct 1987 - Jan 1989Fitness for Duty
High Radiation Area
Stroke time
Contraband
Systematic Assessment of Licensee Performance
ML20246H57518 August 1989Clarifies NRC Position Re Definition of Extremity for Purposes of Setting Occupational Exposure Limits & Requests to Ensure That Licensee Procedures Incorporate Applicable Dose Limits of 10CFR20
ML20246C36715 August 1989Forwards Safety Insp Rept 50-219/89-19 on 890802-04.No Violations or Deviations Noted
ML20247K09815 August 1989Requests That Licensee Take Listed Actions Re Upgrade of Pipe Supports & Anchorages to Meet IE Bulletin 79-02 & 79-14 Requirements Using New Response Floor Spectra for Plant. Response Re Compliance Requested within 30 Days
ML20246B05614 August 1989Forwards Safety Insp Rept 50-219/89-15 on 890627-30.No Violations Noted.Items of Concern Noted in Area of Appointments to Technical & Supervisory Positions & Training Programs to Maintain & Upgrade Personnel Qualifications
ML20245G10910 August 1989Advises That Licensee 890726 Response to Generic Ltr 88-11, NRC Position on Embrittlement of Reactor Vessel Matls & Impact on Plant Operations, Acceptable
ML20245G49310 August 1989Advises That Util 890719 Response to Generic Ltr 89-08 Re Implementation of long-term Erosion/Corrosion Monitoring Program Meets Intent of NUMARC Program.Records & Results from Implementation Should Be Maintained
ML20245L1978 August 1989Forwards Safety Insp Rept 50-219/89-14 on 890604-0701.No Violations Noted.Insp Focused on Open Items Over 3 Yrs Old, Including Response to SALP Rept 50-219/85-99
ML20247P96431 July 1989Advises That Category ABC List of Projects in Semiannual Update for 6 Months Since 881202 Considered in Compliance W/ Approved long-range Planning Program & Acceptable
ML20247M42526 July 1989Confirms Telcon on 890718 W/M Laggart & Eh Gray Re SSFI to Be Conducted at Facility During Wk of 890814-28.Insp to Focus on Design,Operation & Maint of Emergency Svc Water Sys.Background Info Requested by 890807
ML20245F62126 July 1989Requests Util Provide Ref Matls Listed in Encl for Reactor Operator & Senior Operator Exams Scheduled for Wks of 891009 & 16,by 890905.Delay in Receiving Ref Matl May Result in Exam Being RescheduledShutdown Margin
Job Performance Measure
ML20247N10925 July 1989Forwards Safety Insp Rept 50-219/89-11 on 890606-08.Due to Similarities Between 890524 Dress Rehearsal & 0607 Exercise, Exercise Does Not Qualify as Required Annual Test of Emergency Plan Since Same Staff Used & Scenario Known
ML20247L73225 July 1989Forwards Safety Insp Rept 50-219/89-12 on 890430-0603 & Notice of Violation
IR 05000219/198803824 July 1989Discusses Safety Insp Rept 50-219/88-38 on 881204-890114 & Forwards Notice of Violation.Violation Classified as Severity Level IV Since Unauthorized Entry Occurred as Result of Isolated Lapse in Vigilance by Security Officer
ML20247A67317 July 1989Forwards Safety Evaluation Accepting Licensee Response to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys Reliability on-line Testing
ML20246L62911 July 1989Ack Receipt of Forwarding Payment of Civil Penalty in Amount of $50,000 Proposed in NRC