Forwards Insp Rept 50-285/86-03 During Feb 1986 & Notice of Violation
ML20205N753
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/18/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20205N757 List:
References
NUDOCS 8605020283
Download: ML20205N753 (2)


See also: IR 05000285/1986003

Text

_

.

_

, .

__

-

APR 181986

In Reply Refer To:

Docket: 50-285/86-03

-,

_

Omaha Public Power District

R. L. Andrews, Division Manager-

--

ATTN:

! Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlerr.en: -

This refers to the inspection conducted by P. H. Harrell of this office

i during the period February 1-28, 1986, of activities authorized by NRC ]1

n Operating License DPR-40 for Fort Calhoun Station, and to the discussion of

) our findings with Mr. W. G. Gates at the conclusion of the inspection.

Areas examined during the inspection included operational safety _

E verification, maintenance, surveillance, piant tours, safety-related system

walkdowns, followup on previously identified items, followup on licensee

event reports, followup on an IE Bulletin, followup on an NRC headquarter's

request on the maintenance outage team inspection, and followup on an NRR

-

order for modification of license. Within these areas, the inspection

'

_

consisted of selective examination of procedures and representative records,

'

interviews with personnel, and observations by the inspector. The findings

are documented in the enclosed inspection report.

.

During this inspection, it was found that certain of your activities were in -

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

l Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics -

i contained in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

.

-

? GhN

RIV:SR RPB/Bd RPB

k

JEGag ardo

-

PHHarrell DMHunnicutt

3 /fD/86 .$ /20/86 4Ai

$

8605020283 860418 5

DR ADOCK 0500

_

1

______ .

. .

Omaha Public Power District -2-

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

Ongiral Signed By

J. E. Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-285/86-03

cc w/ enclosures:

W. G. Gates, Manager

Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc to DMB (IE01)

bcc distrib. by RIV:

  • RPB * Resident Inspector R. D. Martin, RA
  • R&SPB *Section Chief (RPB/B) *RSB
  • RIV File DRS&P *D. Weiss, LFMB (AR-2015)
  • MIS SYSTEM *RSTS Operator
  • w/766

[