Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20149F9291997-07-0707 July 1997 Insp Repts 50-413/97-08 & 50-414/97-08 on 970427-0607. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148F9441997-05-23023 May 1997 Insp Repts 50-413/97-07 & 50-414/97-07 on 970323-0426. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970051997-04-21021 April 1997 Integrated Insp Repts 50-413/97-05 & 50-414/97-05 on 970216- 0322.No Violations Identified.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000413/19970061997-04-0404 April 1997 Insp Repts 50-413/97-06 & 50-414/97-06 on 970317-20.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities,Plant Support & Status of Security Facilities & Equipment ML20140B7631997-03-17017 March 1997 Insp Repts 50-413/97-03 & 50-414/97-03 on 970112-0215. Violations Noted.Major Areas Inspected:Licensee Operation, Maint,Engineering & Plant Support IR 05000413/19960191997-02-21021 February 1997 Insp Repts 50-413/96-19 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted.Major Areas inspected:in-office Review of Licensee Describing Changes to CNS UFSAR Re Lack of Circuit Breaker Coordination for 600-Vac IR 05000413/19960201997-02-10010 February 1997 Insp Repts 50-413/96-20 & 50-414/96-20 on 961201-970111.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19970041997-01-31031 January 1997 Insp Repts 50-413/97-04 & 50-414/97-04 on 970106-23.No Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000413/19970021997-01-31031 January 1997 Insp Repts 50-413/97-02 & 50-414/97-02 on 970106-10.No Violations Noted.Major Areas Inspected:Plant Support IR 05000413/19960181996-12-30030 December 1996 Insp Repts 50-413/96-18 & 50-414/96-18 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20135C2601996-11-15015 November 1996 Insp Repts 50-413/96-16 & 50-414/96-16 on 960908-1019.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19960151996-11-0707 November 1996 Insp Repts 50-413/96-15 & 50-414/96-15 on 960901-1012.No Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000413/19960171996-11-0101 November 1996 Insp Repts 50-413/96-17 & 50-414/96-17 on 960930-1004.No Violations Noted.Major Areas Inspected:Plant Support ML20128R0951996-10-0707 October 1996 Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20128J0391996-09-30030 September 1996 Insp Repts 50-413/96-12 & 50-414/96-12 on 960804-31. Violations Noted.Major Areas Inspected:Engineering, Summary of Plant Status & Observations & Findings IR 05000413/19940141994-06-0303 June 1994 Insp Repts 50-413/94-14 & 50-414/94-14 on 940509-20.No Violations Noted.Major Areas Inspected:Isi & Flow Assisted Corrosion IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000413/19930321993-12-30030 December 1993 Insp Repts 50-413/93-32 & 50-414/93-32 on 931117-19 & 1129-1203.Violations Noted.Major Areas Inspected:Observation of Eddy Current (ET) Exam of SG Tubes,Inservice Activities Including Surface & Volumetric Exams,Review of Radiographs IR 05000413/19930331993-12-23023 December 1993 Insp Repts 50-413/93-33 & 50-414/93-33 on 931129-1203.No Violations Noted.Major Areas Inspected:Isi of Pipe Supports & Snubbers & TS Surveillance of Snubbers IR 05000413/19930311993-12-22022 December 1993 Insp Repts 50-413/93-31 & 50-414/93-31 on 931107-1204.No Violations Noted.Major Areas Inspected:Plant Operations, Maintenance,Engineering,Plant Support & follow-up of Previously Identifed Items IR 05000413/19930291993-12-12012 December 1993 Insp Repts 50-413/93-29 & 50-414/93-29 on 931115-19.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Organization & Mgt Controls,Training & Qualification,Audits & Appraisals IR 05000413/19930281993-12-10010 December 1993 Insp Repts 50-413/93-28 & 50-414/93-28 on 931101-05.No Violations Noted.Deviation Noted.Major Areas Inspected: Adequacy of Licensee Programs,Procedures & Supporting Documentation for Implementation of Station Blackout Rule 1999-09-24
[Table view] Category:UTILITY
MONTHYEARIR 05000413/19900281990-10-26026 October 1990 Insp Repts 50-413/90-28 & 50-414/90-28 on 901001-04. Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors W/Emphasis on Compensatory Measures & Records & Repts IR 05000413/19900251990-10-11011 October 1990 Insp Rept 50-413/90-25 & 50-414/90-25 on 900924-28.No Violations Noted.Major Areas inspected:post-refueling Startup Tests for Both Units & Core Performance Surveillance Performed on Unit 2 IR 05000413/19900241990-09-27027 September 1990 Insp Repts 50-413/90-24 & 50-414/90-24 on 900803-0905. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation,Review of LERs & Followup of Previously Identified Items IR 05000413/19900231990-09-10010 September 1990 Insp Repts 50-413/90-23 & 50-414/90-23 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program in Areas of Internal & External Exposure & Contamination Control & ALARA IR 05000413/19900191990-08-30030 August 1990 Insp Repts 50-413/90-19 & 50-414/90-19 on 900624-0802. Violations Noted.Major Areas Inspected:Plant Operations, Refueling Activities,Surveillance/Maint Observations,Review of LERs & Followup of Previously Identified Items IR 05000413/19900201990-08-28028 August 1990 Insp Repts 50-413/90-20 & 50-414/90-20 on 900724-26. Unresolved Item Identified.Major Areas Inspected: fitness-for-duty Program IR 05000413/19900221990-07-30030 July 1990 Insp Repts 50-413/90-22 & 50-414/90-22 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Records Review of Maint Activities Following 5-yr Insp of Emergency Diesel Generator 2A & Review of Test Procedures ML20056A5101990-07-19019 July 1990 Insp Repts 50-413/90-15 & 50-414/90-15 on 900527-0623. Violation Noted.One Noncited Violation Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation & Maint Observation IR 05000413/19900211990-07-19019 July 1990 Insp Repts 50-413/90-21 & 50-414/90-21 on 900627-29.No Violations or Deviations Noted.Major Areas Inspected:Main Steam Safety Relief Valve Setpoint Testing & Maint & Repair of Coatings on Steel Containment Vessel IR 05000413/19900181990-07-11011 July 1990 Insp Repts 50-413/90-18 & 50-414/90-18 on 900625-29.No Violations Noted.Major Areas Inspected:Inservice Insp & Maint,Including Plan for Outage,Reviews of NDE Procedures & Independent Exam of Verifications IR 05000413/19900161990-07-0909 July 1990 Insp Repts 50-413/90-16 & 50-414/90-16 on 900611-15. Violations Noted But Not Cited.Major Areas Inspected: Conformance to Reg Guide 1.97 & Instrumentation for Light water-cooled Nuclear Power Plants During Accidents IR 05000413/19900141990-06-13013 June 1990 Partially Withheld Physical Security Insp Repts 50-413/90-14 & 50-414/90-14 on 900521-25 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected: Physical Barriers & Security Sys Power Supply IR 05000413/19890281989-10-10010 October 1989 Partially Withheld Insp Repts 50-413/89-28 & 50-414/89-28 on 890911-15 (Ref 10CFR2.790(d) & 73.21)Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Audits, Detection & Assessment Aids & Testing & Maint IR 05000413/19890251989-09-25025 September 1989 Insp Repts 50-413/89-25 & 50-414/89-25 on 890801-28 & 0912-15.Violations Being Considered for Enforcement.Major Areas Inspected:Two Events Re Overspeeding & Tripping of Auxiliary Feedwater Pump IR 05000413/19890261989-09-20020 September 1989 Insp Repts 50-413/89-26 & 50-414/89-26 on 890821-24.No Violations or Deviations Noted.One Unresolved Item Identified.Major Areas Inspected:Organization & Mgt Controls & Maintaining Radiation Exposures ALARA IR 05000413/19890241989-09-0707 September 1989 Insp Repts 50-413/89-24 & 50-414/89-24 on 890807-11.No Violations Noted.Major Areas Inspected:Physical Security Program for Program Power Reactors IR 05000413/19890221989-08-22022 August 1989 Insp Repts 50-413/89-22 & 50-414/89-22 on 890723-28.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Previously Identified Insp Items IR 05000413/19890201989-08-11011 August 1989 Insp Repts 50-413/89-20 & 50-414/89-20 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment,Generic Ltr 83-28 & NRC Bulletins 88-001 & 88-003 IR 05000413/19890181989-08-11011 August 1989 Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items IR 05000413/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-413/89-23 & 50-414/89-23 on 890728 (Ref 10CFR2.790 & 73.21)).Violations Noted.Major Area Inspected:Security Event Logs ML20247R7511989-07-24024 July 1989 Insp Repts 50-413/89-16 & 50-414/89-16 on 890528-0701.Two Violations & One Deviation Noted.Major Areas Inspected:Plant Operations,Surveillance Observation,Maint Observation, Licensee Nonroutine Event Repts & Part 21 Insps IR 05000413/19890171989-07-13013 July 1989 Partially Withheld Insp Repts 50-413/89-17 & 40-414/89-17 on 890605-09.Violations Noted Re Protected Area Access Controls & Visitor Controls.Major Areas Inspected:Mgt Support, Security Program Plans & Audits & Physical Barriers IR 05000413/19890191989-07-13013 July 1989 Insp Repts 50-413/89-19 & 50-414/89-19 on 890616-0628. Violations Noted.Major Areas inspected:890616 Event Re Channels of Reactor Vessel Level Instrumentation Sys Inoperable for Period of Time in Excess of Tech Specs ML20246P7321989-07-10010 July 1989 Insp Repts 50-413/89-09 & 50-414/89-09 on 890410-0505. Violations Noted.Major Areas Inspected:Various Plant Groups Including Operations,Maint,Qa,Engineering & Training in Support of Safe Plant Operations IR 05000413/19890151989-06-27027 June 1989 Insp Repts 50-413/89-15 & 50-414/89-15 on 890430-0527. Violation Noted Re Failure to Meet Overtime Restriction Requirements & Unlocked Valves.Major Areas Inspected:Plant Operations,Surveillance & Maint Observations & Plant Mods IR 05000413/19890131989-06-27027 June 1989 Insp Repts 50-413/89-13 & 50-414/89-13 on 890326-0429. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19890121989-06-0606 June 1989 Corrected Page to Insp Repts 50-413/89-12 & 50-414/89-12. No Violations or Deviations Noted.Major Area Inspected: Annual Radiological Emergency Response Exercise on 890427 ML20245F3421989-05-23023 May 1989 Insp Repts 50-413/89-12 & 50-414/89-12 on 890425-28.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Radiological Emergency Response Exercise IR 05000413/19890111989-05-18018 May 1989 Insp Repts 50-413/89-11 & 50-414/89-11 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities During Extended Outages & Control of Radioactive Matls & Surveys IR 05000413/19890101989-05-0202 May 1989 Insp Repts 50-413/89-10 & 50-414/89-10 on 890403-07 & 13. Violations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste,Plant Chemistry,Environ Monitoring,Confirmatory Measurements & Followup on Previously Identified Items IR 05000413/19890071989-04-20020 April 1989 Insp Repts 50-413/89-07 & 50-414/89-07 on 890226-0325. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Rept IR 05000413/19890081989-04-19019 April 1989 Insp Repts 50-413/89-08 & 50-414/89-08 on 890313-14,16-17 & 27-31.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Program Implementing Procedures, Reviews of NDE Procedures & Personnel Qualifications ML20244A8991989-03-29029 March 1989 Insp Repts 50-413/89-05 & 50-414/89-05 on 890204-25. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Nonroutine Event Repts IR 05000413/19890041989-03-13013 March 1989 Insp Repts 50-413/89-04 & 50-414/89-04 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness Re Emergencies ML20246L6721989-03-0303 March 1989 Insp Repts 50-413/89-02 & 50-414/89-02 on 890130-0203. Violations Noted.Major Areas Inspected:Preoutage Planning, Preparations & Mgt Support for Implementing Licensee Radiation Protection Program ML20236A2241989-02-25025 February 1989 Resident Insp Repts 50-413/88-38 & 50-414/88-38 on 881127-890204.One Strength,One Weakness & One Apparent Violation Identified.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observation & Procedures Review IR 05000413/19890031989-02-23023 February 1989 Insp Repts 50-413/89-03 & 50-414/89-03 on 890130-0203.One Weakness Identified Re Photomultiplier Tube.Major Areas Inspected:Design Changes,Plant Mods & Licensee Action on Previously Identified Insp Findings ML20206J5961988-11-15015 November 1988 Insp Repts 50-413/88-34 & 50-414/88-34 on 880926-1025. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880331988-10-14014 October 1988 Insp Repts 50-413/88-33 & 50-414/88-33 on 880826-0925. Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation & Review of Licensee Nonroutine Event Repts IR 05000413/19880301988-09-20020 September 1988 Insp Repts 50-413/88-30 & 50-414/88-30 on 880726-0826.No Violations Noted.Major Areas Inspected:Review of Plant Operations,Surveillance Observation,Maint Observation,Review of Licensee Nonroutine Event Repts & Part 21 Repts IR 05000413/19880271988-09-0909 September 1988 Insp Repts 50-413/88-27 & 50-414/88-27 on 880719-22. Violations Noted.Major Areas Inspected:Radiation Protection, Including Organization & Mgt Controls,Solid Waste Program, Transportation & Licensee Action on Previous Insp Findings IR 05000414/19880311988-09-0808 September 1988 Partially Withheld Insp Repts 50-413/888-31& 50-414/88-31 on 880815-19 (Ref 10CFR2.790 & 73.21).No inspector-identified Violations or Deviations Noted.Major Areas Inspected:Testing & Maint & Physical Barriers - Protected Area ML20154E9461988-09-0606 September 1988 Page 11 to Insp Repts 50-413/88-25 & 50-414/88-25 IR 05000413/19880261988-09-0202 September 1988 Insp Repts 50-413/88-26 & 50-414/88-26 on 880801-05.No Violations Noted.Major Areas Inspected:Qa & Confirmatory Measurements for in-plant Radiochemcial Analysis ML20154A6241988-08-31031 August 1988 Insp Repts 50-413/88-29 & 50-414/88-29 on 880801-05. Violation Noted.Major Areas Inspected:Areas of Catawba Safety Review Group Activities & 10CFR21 Reportability Determinations IR 05000413/19880281988-08-23023 August 1988 Insp Repts 50-413/88-28 & 50-414/88-28 on 880725-29.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Waste Mgt,Effluent Sampling,Monitoring & Analysis & Radiological Environ Monitoring ML20153C5451988-08-19019 August 1988 Insp Repts 50-413/88-25 & 50-414/88-25 on 880626-0725. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of LERs & Followup of Previously Identified Items & NRC Bulletins ML20151E5681988-07-0808 July 1988 Insp Repts 50-413/88-22 & 50-414/88-22 on 880526-0625. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Maint Observations,Review of Licensee Nonroutine Event Repts & Previously Identified Items IR 05000413/19880231988-06-22022 June 1988 Partially Withheld Insp Repts 50-413/88-23 & 50-414/88-23 on 880607-10.Violation Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Program & Organization,Records & Repts & Alarm Stations IR 05000413/19880191988-06-21021 June 1988 Insp Repts 50-413/88-19 & 50-414/88-19 on 880517-20 & 0603. No Violations or Deviations Noted.Major Areas Inspected: Emergency Plan & Implementing Procedures,Emergency Facilities & Organization & Mgt Control 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000413/19993021999-10-12012 October 1999 NRC Operator Licensing Retake Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23.Two Out of Three RO Candidates & One SRO Passed Retake Exam IR 05000413/19993011999-09-30030 September 1999 NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16.Eight of Fourteen Applicants Passed Exam IR 05000413/19990051999-09-24024 September 1999 Insp Repts 50-413/99-05 & 50-414/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19990041999-08-13013 August 1999 Insp Repts 50-413/99-04 & 50-414/99-04 on 990606-0717. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20210H2211999-07-22022 July 1999 Notice of Violation from Insp on 990314-0424.Violation Noted:Sss Was Not Inoperable for Thirteen Days Because Electrical Breakers Associated with SSS Motor Control Ctr Were Mispositioned ML20209E2831999-07-0101 July 1999 Insp Repts 50-413/99-03 & 50-414/99-03 on 990425-0605. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000413/19990111999-06-0202 June 1999 Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503. No Violations Noted.Major Areas Inspected:Licensee Identified Frost & Ice Buildup Which Affected Unit 1 Ice Condenser Lower Inlet Doors IR 05000413/19990021999-05-20020 May 1999 Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-II-99-017, on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground1999-05-18018 May 1999 PNO-II-99-017:on 990515,indication of Main Generator Ground Fault Was Received While Performing Turbine Startup in Preparation for Placing Unit on Line.Licensee Is Conducting Investigation to Determine Actual Cause of Ground ML20206U4161999-05-10010 May 1999 Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424. Violation Being Considered for Escalated Enforcement Action Noted.Major Areas Inspected:Operations PNO-II-99-015, on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws1999-05-0505 May 1999 PNO-II-99-015:on 990503,shutdown in Excess of 72 H Occurred. Licensee Is Still Conducting Investigation Into Cause of Main Generator Protection Lockout & Making Preparations to Inspect & Remove Any Excessive Fouling from Inside Afws IR 05000413/19990011999-04-0606 April 1999 Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20207A5881999-02-17017 February 1999 Notice of Violation from Insp on 981213-990123.Violation Noted:Licensee Made Change to Procedures as Described in Updated Final Safety Analysis Rept & Failed to Perform Written Safety Evaluation IR 05000413/19980121999-02-17017 February 1999 Insp Repts 50-413/98-12 & 50-414/98-12 on 981213-990123. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19980111999-01-11011 January 1999 Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980151999-01-0404 January 1999 Insp Repts 50-413/98-15 & 50-414/98-15 on 981102-06 & 16-20. No Violations Noted.Major Areas Inspected:Licensee Corrective Action Program by Sampling Activities Defined in Nuclear Sys Directive 210,rev 1 IR 05000413/19980161998-12-0404 December 1998 Insp Repts 50-413/98-16 & 50-414/98-16 on 980915-1101.No Violations Rept Encl.Major Areas Inspected:Licensee Maint, Surveillance & Engineering Programs Involving Unit 2 Ice Condenser IR 05000413/19980101998-11-23023 November 1998 Insp Repts 50-413/98-10 & 50-414/98-10 on 980927-1031.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering & Plant Support ML20155B3821998-10-19019 October 1998 Insp Repts 50-413/98-13 & 50-414/98-13 on 980807-0915. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review Ice Condenser Related Problems,Which Led to Forced Shutdown ML20154C4301998-09-14014 September 1998 Notice of Violation from Insp on 980705-0815.Violation Noted:Licensee Failed to Establish Adequate Surveillance Procedures IR 05000413/19980081998-09-14014 September 1998 Insp Repts 50-413/98-08 & 50-414/98-08 on 980705-0815. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-037A, on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed1998-08-28028 August 1998 PNO-II-98-037A:on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed IR 05000413/19980091998-08-26026 August 1998 Insp Repts 50-413/98-09 & 50-414/98-09 on 980816-0826. Examples of Two Apparent Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-II-98-037, on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified1998-08-10010 August 1998 PNO-II-98-037:on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified ML20236V7351998-07-27027 July 1998 Notice of Violation from Insp on 980524-0704.Violation Noted:Licensee Failed to Identify & Take Prompt C/A Following Unit 1 Upper Surge Tank over-temp Events on 960120,980111 & 0507 IR 05000413/19980071998-07-27027 July 1998 Insp Repts 50-413/98-07 & 50-414/98-07 on 980524-0704. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support,Including Physical Security IR 05000413/19980051998-06-22022 June 1998 Insp Repts 50-413/98-05 & 50-414/98-05 on 980412-0523.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236J7471998-06-11011 June 1998 Notice of Violation from Insp on 980222-0411.Violation Noted:Adminstrative & Surveillance Procedures Not Implemented as Evidenced by Listed Examples IR 05000413/19980061998-06-0505 June 1998 Insp Repts 50-413/98-06 & 50-414/98-06 on 980511-15. Violations Noted.Major Areas Inspected:Facts Surrounding Event Associated W/Degradation of CNS Unit Auxiliary Feedwater Sys During Rapid down-power on 980507 PNO-II-98-025, on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed1998-05-11011 May 1998 PNO-II-98-025:on 980507,AFW Sys Declared Inoperable.Licensee Isolated Valves 1CM-127 & 2CM-127 in Units 1 & 2, Respectively,To Prevent Recurrence Until Permanent Corrective Actions Can Be Developed IR 05000413/19980031998-04-30030 April 1998 Insp Repts 50-413/98-03 & 50-414/98-03 on 980222-0411. Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000413/19980041998-04-20020 April 1998 Insp Repts 50-413/98-04 & 50-414/98-04 on 980302-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20217G5661998-03-23023 March 1998 Insp Repts 50-413/98-01 & 50-414/98-01 on 980111-0221. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support ML20217G5551998-03-23023 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Perform Written Safety Evaluation for Closing Valves 1CA-6 & 2CA-6 IR 05000413/19980021998-02-17017 February 1998 Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant ML20203L6301998-02-0909 February 1998 Insp Repts 50-413/97-15 & 50-414/97-15 on 971123-980110. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20203L6251998-02-0909 February 1998 Notice of Violation from Insp on 971123-980110.Violation Noted:Changes to Radiological Conditions in 1B Residual Heat Removal Pump Room Not Logged to Reflect Changes in Dress Requirements ML20199L6301998-02-0202 February 1998 Notice of Violation from Insp & Exam on 971117-21 & 971201-19.Violation Noted:As of 971219,selected Officers from Site Security Force Had Not Been Retrained to Perform non-licensed Operator Emergency Tasks for Starting Ssf PNO-II-97-066, on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc1997-12-31031 December 1997 PNO-II-97-066:on 971230,RCS Leakage Requiring Forced Unit Cooldown Occurred.No Radioactive Release Outside of Reactor Containment Facilities Due to Leakage.Licensee Informed States on Nc & Sc PNO-II-97-064, on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation1997-12-29029 December 1997 PNO-II-97-064:on 971229,inadvertent Safety Injection Occurred Due to Operators Failing to Perform Step Which Resulted in Cold Leg Injection Valve Being Left Open. Licensee Engineers Performing Evaluation ML20197F2481997-12-19019 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Follow Radiation Protection Procedures in That,Current Radiation Dose Rates Were Not on Vacuum Cleaner Label as Required IR 05000414/19970081997-12-19019 December 1997 Notice of Deviation from Insp on 971012-1122.Deviation Noted:On 971020,licensee Had Not Performed Alarm Set Point Adjustment Evaluation Discussed in Violation 50-414/97-08-01 ML20197F2861997-12-19019 December 1997 Insp Repts 50-413/97-14 & 50-414/97-14 on 971012-1122. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199G0351997-11-10010 November 1997 Notice of Violation from Insp on 970831-1011.Violations Noted:Licensee Failed to Follow Procedures for Security Badge Access Control as Evidenced.On 970909,security Failed to Destroy & Unassign Access Badge of Terminated Individual IR 05000413/19970121997-11-10010 November 1997 Insp Repts 50-413/97-12 & 50-414/97-12 on 970831-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support as Well as Results of Announced Inspection by Regional Security Inspector ML20211L3051997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970727,technician Failed to Correctly Review Drawing Number CNEE-2792-01.02,connection Diagram,Main Steam Sys Terminal Cabinet 2SMTC1,rev 12 IR 05000413/19970111997-09-26026 September 1997 Insp Repts 50-413/97-11 & 50-414/97-11 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000413/19970101997-09-11011 September 1997 Insp Repts 50-413/97-10 & 50-414/97-10 on 970623-0731.No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis & Other Engineering Documents ML20210N7341997-08-18018 August 1997 Insp Repts 50-413/97-09 & 50-414/97-09 on 970608-0719. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20210N7111997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:On 970424,operations Test Group Technician Failed to Open Valve 2NV-873 as Required by Step 2.2.3 of PT/2/A/4200/01C,resulting in Closed Test Vent Flowpath 1999-09-30
[Table view] |
Inspection Report - Catawba - 1985045 |
---|
|
|
Text
km Efou UNITED STATES
/ * g[o NUCLEAR REGULATORY COMMISSION j p REGION 11 g,
j 101 MARIETTA STREET. 's ATLANTA, GEORGI A 30323
\...../
Report Nos.: 50-413/85-45 and 50-414/85-45 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-413 and 50-414 License Nos.: NPF-35 and CPPR-117 Facility Name: Catawba 1 and 2 Inspection Conducted: September 30 - October 4, 1985 Inspector: %,N
'
Le /0-30-63
~ q Date Si ned Approved by: - I// ) #f .8 E,'Section Chief Date Signed E ine ing Branch D vision of Reactor Safety SUtttARY Scope: This routine, unannounced inspection entailed 31 inspector-hours on site in the areas of welding verification, review of preservice inspection procedures, review of work act(vities performed during preservice inspection, licensee identified items, and followup on inspector identified problems and unresolved items.
Results: No violations or deviations were identifie PDR ADOCK 05000413 G PDR
_ -_ .
REPORT DETAILS Persons Contacted Licensee Employees
- R. McCollum, Acting Plant Manager
- F. P. Schiffley, Licensing Engineer
- K. W. Schmidt, Quality Assurance (QA) Engineer .
- H. Bell, Supervisor QA l *E. Williams, QA Technician
- J. E. Cherry, QA Specialist, Inservice Inspection (ISI)
Other licensee employees contacted included construction craftsmen, engineers, technicians, mechanics, and office personne Other Organizations Babcock and Wilcox (B&W) - R. Patterson NRC Resident Inspector
- Attended exit interview Exit Interview The inspection scope and findings were summarized on October 4,1985, with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the inspection finding No dissenting comments were received from the licensee. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio . Licensee Action on Previous Enforcement Matters (Unit 2)
'
(0 pen) Unresolved Item 414/85-31-02: " Failed Containment Spray Pipe Support".
During pre-operational testing of the Unit 2 containment spray system on
'
April 1985, a water hammer was experienced during a pump start-up. This water hamer occurred in the "B" train piping. Visual damage resulting from the water hammer consisted of partial anchor pull out on one support /
restraint and some irregularity on an adjacent support. The licensee issued Nonconforming Item Report No. 19890 to evaluate and fix the damaged support The licensee initially had identified that the water hammer
- resulted from stopping the containment spray 28 pump before the drain header
isolation valve was closed. The error was attributed to poor comunica-tion The licensee's corrective action dealt with identifying and
. _ . _ . . -. - _ _ _ . _ _ _ _ _ _ _ - - - . _ _ - - . - _ . - -- .- - - - ,
- . . _ .. . _ - _ . - . . _ - _
correcting the defect. The inspector discussed the cause (poor connunica-tion) of the water hammer with the licensee and suggested that the licensee ,
i flag this problem in the operating procedure to prevent future occurrence '
The licensee stated that they would investigate the corrective action relative, to cause, and take appropriate corrective actio Subsequent corrective action.will be reviewed during a future inspectio Closed) Unresolved Item 414/85-34-03: " Apparent Failure of Babcock and
. ilcw to Perform Audits of their Inspection Services Division".
- As a result of an inspector's findings on Unit 1, Duke Power and B&W decided, during preservice inspection (PSI), to have two certified
.
technicians perform each ultrasonic examination. Both technicians are l equally responsible for the integrity of each weld examined. In addition to i the two independent examinations the B&W QA Audit Group performed an audit 1 in Lynchburg on such things as personnel, and equipment certification !
B&W's Level III Ultrasonic examiner was on site on numerous occasions to j evaluate indications, audit paper work, and observe examinations in proces , The licensee stated that a statement would be put' in the completed PSI i package to indicate that the combined audit methods described above were
sufficient to fulfill B&W's PSI program audit commitments. The licensee stated that during the first refueling outage for Unit 2, B&W would audit
- activities on site, in lieu of two examiner verification, which would result i in excessive personnel radiation exposur i (Closed) Unresolved Item 414/85-34-02
- " Clarification NDE-11 and NDE-12 i Needed".
!
l This item dealt with the failure of the above procedures to specify the maximum source size. The licensee's corrective action consisted of deleting NDE-11 from the active procedure files and adding the maximum source sizes
. as a note to paragraph 10.1.2 of NDE-1 The inspector considers the licensee's corrective action to be adequate.
Within the areas examined, no violations or deviations were identified.
! Unresolved Items t
!
Unresolved items were not identified during the inspectio . Welding Verification - (55150)(Unit 2)
In conjunction with the inspection of the licensees QA Program as reported in NT,C Report No. 50-414/85-43, the inspector reviewed a licensee
,
surveillance report finding, and a subsequent program interpretation of an i American Welding Society (AWS) Code involving weld size of structural fillet
'
welds. The inspector, discussed the finding with the licensee's QA, craft and site eng'neering personnel. In addition, the inspector performed a visual inspection of the fillet weld used to attach the support discussed in j the surveillance report to an embed plate. The inspector concluded that the specific weld specified in the surveillance report was satisfactory. The
-_ _ _ --_ - _- - _ _ _ _ _ _ _ _ _ _ __ _ _ _ ___ - _ _ - __ - _ -
.
'
inspector noted that the licensee's program interpretation that a visual weld examiner is not required to verify at final visual inspection that the weld fillet size has been increased by the amount of fitup gap when this gap exceeds 1/16 inch and is not over 3/16 inch was an apparent deviation from the AWS Cod (An exception to this discrepancy would be if design had considered this and built adequate conservatism into the drawings fillet sizes.) Due to time limitations, design was not contacted. An unresolved item addressing this item in detail is reported in NRC inspection report 50-414/85-4 Within the area examined, no violations or deviations were identified. Preservice Inspection - Review of Procedures (730528) (Unit 2)
The inspector reviewed CONAM's eddy current procedure to ascertain whether the procedure pertaining to the preservice inspection of the steam generator tubes was consistent with the applicable codes, regulatory requirements and licensee commitments. The applicable codes and specifications for the eddy current examinations were the ASME Code,Section XI, 74S75 and 77S78, Nuclear Regulatory Guide 1.83, revision 1, and additional examinations required by the owne CONAM used the following procedure and equipment to perform the examina-tions:
Procedure No: -
42-EC-085, Rev. O, "Multifrequency Eddy Current Procedure Westinghouse Series D4 and D5 steam generator tubing M1Z-18 Digital Eddy Current System" Equipment: -
Zetec M1Z-18 digital multifrequency instrument
-
Eddy current instrument controller and operating display: HP9836 Computer with GPIO interface and Zetec M1Z-18 software
-
Digital recorder: Zetec HCD-752
-
Interface: HPIB to MIZ-18
-
Printer: HP2671G
- Analysis System: Zetec DDA-4 Software with HP 9836 Computer
-
Probes: Zetec .610 SFM, .600 SFM, .580 for Row 1 and others as required The procedural configuration set-up for the D4 and D5 model steam generators are 4 differential and 4 absolute channels: differential channels required by procedure were 550 KHZ, 400 KHZ, 200 KHZ and 130 KHZ, absolute channels required by procedure were 550 KHZ, 400 KHZ, 200 KHZ and 130 KH .-. -_ . - _ . ,
... -_ - = - - - - . . . . _ - . -
'
.
'
i l
The inspector reviewed the procedure to ascertain if the procedure included
, the following information: tube material diameter, and wall thickness size and type of test probe including manufacturer's name and part
, number test frequency 3 type and model of eddy current equipment to be used ,
i scanning direction and speed during examination (insertion, retraction, !
or both - from inlet or outlet end)
4 description of inspection technique, for example, hand probe,
mechanized probe drive, remote control fixture description of calibration procedure and calibration standards j description of data recording equipment and procedures 1 procedure for interpretation of test results and the applicable i criteria for reportable indication Within the area examined, no violations or deviations were identified.
I Preservice Inspection - Observation of Work and Work Activities (730538)
2 (Unit 2)
I l The inspector reviewed completed records to ascertain whether the onsite inspection of class 1, 2 and 3 pressure retaining components were performed
-
in accordance with regulatory requirements and licensee's commit.nents. The
,
applicable code for PSI was the ASME Code,Section XI, 74S7 :
- Records for 4 different methods of examination of components were reviewed I to detemine whether: procedures were being followed; examination personnel ,
j were certified; equipment and test materials were calibrated or certified; '
I
'
and calibrations, examinations, evaluations, acceptance of nondestructive examination (NDE) results and any corrective actions / repairs or replacements l were recorded as specified in the PSI program and NDE procedures. Record i review was selected as the window of opportunity for direct observation of 1 work had passe Volumetric Examination Using Eddy Current Technique i
'
The inspector reviewed the completed work package frcm CONAM inspection j for the eddy current examinations of the steam generators on Unit Surface Examination Using Liquid Penetrant Technique
'
Records associated with the liquid penetrant examination of the following weld identification / component number were reviewed by the
,
inspector:
!
,
- - . . , - , .--,;,.._w.-. s w r-,,,y -.--,,.--7--1.-s,-,..,
-
,y, , y r, - v--r,-~--, .-.% - ,,c---..w .,p,-- ,..----p,.,,-,._-re.-. - -
. ; .
Weld / Component Examiner Number Item Number Examination Date Verified Valve 2SV2 E3.01.001 5-3-84 R. Valve 2SV6 E3.01.005 5-3-84 W. Valve 2SV8 E3.01.006 4-30-84 Valve 2SV3 E3.01.019 5-18-84 T. ND33 E3.01.032 11-26-84 R. NI332A E3.01.041 1-27-84 J. NI342 E3.01.047 1-11-85 A. ND28A E3.01.031 11-26-84 R. RHR-HX-2A C1.03.150 1-16-84 P. NC9-WN8 B4.07.001 1-27-85 W. NC9-WN5 84.07.002 10-5-84 NC9-WN6 B4.07.003 2-1-85 NC9-WN6A B4.07.004 2-15-84 NC11-WN6 B4.07.009 2-23-84 P. NC11-WN5 B4.07.010 2-23-84 H. NC13-WN5 84.07.017 2-23-84 R. NC13-WN8A B4.07-019 2-29-84 J. NI77-02 B4.07.052 3-20-84 NC9-WN9 B4.06.0018 11'-29-84 NC11-WN7 84.06-0038 12-1-84 G. The above liquid penetrant examinations were performed by Duke Power Personnel using approved Duke Power preservice inspection procedures.
- Surface Examination Using Magentic Particle Technique
'
'
Records associated with the magnetic particles examination of the following weld identification / component numbers were reviewed by the inspector:
Weld / Component Examiner Number Item Number Examination Date Verified 2CF60 E3.01.021 11-26-84 J.A.P & C. A Accumulator C1-03.101 10-25-84 R. Tank 2B Accumulator C1.03.102 10-24-84 T. Tank 2C Accumulator C1.03.103 10-25-84 Tank 2NAC-LH-Skirt C1.03.106 1-29-85 W. The above magnetic particle examinations were performed by Duke Power personnel using approved Duke Power PSI procedures.
i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _
.. ._- =- _ _ , - _ - - . - _ . - - _ _ - _ -- . _ . -.
i
!
'
!
I
- Visual Examination Records associated with visual inspection of the following weld
- identification / component numbers were reviewed by the inspector
- r Weld / Component Numbers Item Number lI
'
2SGA-Clad-INLT B3. i 2SGA-Clad-0TLT B3. SGA-MW-X-Y B3.1 NC-112-M3-1 B4. '
', 2NC65-MJ-1 B4,1 '
2NC12 B6. RCP-2 B5. .
I 2RCP-2A-11 B5.9.1 i
i The above visual inspections were performed using B&W PSI personnel and l procedure ! In addition to the review of complete records for the 4 methods of examina-
- tions described above the inspector reviewed the weld repair records and
,
subsequent PSI examinations for the following welds: !
! Weld Identification N Item N Size
l 2NC53-05 B4.5.231 3" diameter x .438"
<
2NC65-01 B4.5.239 3" diameter x .438"
! 2NI174-12 B4.5.647 6" diameter x .719"
l The above welds were rejected by B&W during ultrasonic examination performed
,
for PSI and repair welding was performed by the license ,!
.
Within the areas examined, no violations or deviations were identified.
) Licensee Identified Items (92700) (Unit 1)
'
Closed) Item 414/85-05: " Correct Starting Air Check Valve Deficiencies" i
10 CFR 50.55(e)).
i The final report was submitted on October 2,1985. The report has been reviewed and determined to be acceptable. The inspector held discussions with responsible licensee representatives and reviewed supporting documenta-
- tion.
4 ,
i Based on the investigation, performed by Dominion Engineering, into the .
'
causes of the check valve failures at Grand Gulf and Shoreham, it was determined that the failures resulted from high cycle fatigue at approxi-1 mately 1600-2000 hours of engine operation. Additionally, disc misalignment j (Grand Gulf) and improper disc seating (Shoreham) may have contributed to j the check valve failures.
< .
!
i
-
_ . , _ . , .
.
The original disc assembly material used in the check valves were case 304 stainless stee The corrective action to be taken by Duke Power Company is the installation of new modified disc assemblies manufactured from 17-4 PH stainless steel, which is not subject to the high cycle fatigue failures that were experienced with the cast 304 stainless steel assemblies. In addition, dimensional controls will allow the disc to be properly seated in the valve body so that potential cracking of the valve body will be minimize Since the the Unit 2 diesels have operated for only approximatley 200 hour0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> Duke Power expects to replace each Unit 2 check valve disc assembly with the modified disc assembly by the end of the first refueling outag The inspector closed this item based on the inspections performed on Unit 2, diesel generator; air start system check valves, investigations performed by Dominion Engineering and the licensee's in-place program for replacement by the end of the first refueling outag (Closed) Item 414/85-03: " Portions of Piping Systems Not Protected From Effects of Postulated LOCA" (10 CFR 50.55(e)).
The final report was submitted on April 12, 198 The report has been reviewed and determined to be acceptable. The inspector held discussions with responsible licensee representatives, reviewed supporting documenta-tion, and observed representatives samples of work to verify that the corrective actions identified in the report have been completed. Inspector Followup Items (92701B) (Units 1 and 2)
(Closed) Item 414/86-34-04: " Technical Review of Preservice Records".
This item dealt with an inspector finding that information recorded on a ultrasonic test report was an obvious mistake. Since preservice inspection work was complete on Unit 2, the inspector was of the opinion that B&W should perform a technical review of the data obtained to insure the correctness and completeness of the dat This review should be completed at the earliest date possible in order to assure major events would not be impacted by " catch up work" resulting from audit findings. B&W performed the technical review and did not discover any additional discrepancies. The licensee will also conduct an independent technical review prior to opera-tions. The corrective action taken by the licensee appears to be adequat (Closed) Item 414/85-31-01: " Resolve Snubber Installation Discrepancies".
This item dealt with an inspector's findings of a loose locknut and pipe insulation caulking on a snubber body, in contact with the snubber piston sleeve. The licensee issued deficiency report no.19891 to correct these isolated discrepancies and corrective action was completed on August 21, 198 In addition the licensee instituted an " area walk" (Reference:
Constructon Procedure - 864) to detect obvious defects that may have been
.
created during construction and/or testing the corrective action taken by the licensee appears to be adequat (Closed) Item 413/85-11-01 and 414/85-09-01: "QA Program Responsibilities".
In order to clarify program responsibilities the licensee added a statement to the " Catawba Unit 1 Inservice Inspection Plan" and the " Catawba Unit 2 Preservice Inspection Plan". The statement added reads as follows; "Each inspection will be performed under the QA program of the organization performing the inspection". This statement is found in paragraph 3.0 of each plan. The corrective action taken by the licensee appears to be adequat (Closed) Item 413/85-11-02 and 414/85-09-02: " PSI /ISI Audits".
This item reported that an inspector could not find any objective evidence that the licensee QA program for audits covered PSI and ISI. This inspector met with cognizant personnel from corporate QA, representing the vendor surveillance division, construction, and operation These individuals provided this inspector with yearly audit schedules, complete audits and surveillance reports which covered PSI /ISI in detail. The inspector reviewed the past audits and discovered that the licensee has a very effective program for auditing PSI /ISI. The corrective action taken by the licensee appears to be adequat (Closed) Item 413/85-11-03 and 414/85-09-03: " Unavailable Procedures".
This item dealt with an inspector's concern that procedures listed in a revised B&W index of inservice procedures were not in the ISI manuals. The following procedures, 151-425, 151-462, 151-463, 151-467 were not available because none of the actual B&W procedures that will be used for inservice inspection of Unit 1 are on site. B&W is revising all inservice procedure to the 1980 Winter 1981 edition of the ASME Code. All procedures will be available for review prior to first outage of Unit Procedure DPC-APP-1 was found mis-filed in the NDE-Manua Corrective action taken by the licensee appears to be adequat (Closed) Item 413/85-11-04 and 414/85-09-04: " Level III Approval".
Certifications for a B&W Level III examiner who had reviewed a ISI procedure were received by the licensee on July 29, 1985. The Level III certification records were not at the site since the examiner had never been to the Catawba site. The inspector reviewed the examiner's certifications and considers corrective actions taken by the licensee to be adequat (Closed) Item 413/85-11-05 and 414/85-09-05: " PSI /ISI Code of Record".
The licensee reply to the inspector's concern was as follows;'
"At the time DPC-NDE-26 was used on site at Catawba, Revision 0 was in effec This revision of NDE-26 was written in accordance with the 1974 Edition of the ASME Boiler and Pressure Vessel Code Section XI,
. _ _ - -. . - . - _ _ _ . - . _-
_ - . - - - _ - _. _ - .-
.
'
\
with addenda through Summer 197 OPC-QA-M4, M10, M12 are ASME Section III procedures, QA condition 1 and meet all requirements needed to be used for our baseline dat All Duke and B&W procedures referenced in the ISI Plan for Unit I will be updated to the 80W81 edition of the ASME Code at a later date."
The inspector considers the explanation given by the licensee to be adequate
,
and documented in the list of applicable licensee procedures to be used for PS l f
,
(Closed) Item 413/85-11-06 and 414/85-09-06: " Regulatory Guide 1.150
- Revision". .
An inspector had questioned the licensee as to what revision of Regulatory Guide 1.150 would be applicable for ISI of Unit 1. The licensee stated t that, Revision 1 of the Catawba Unit 1 ISI plan made the change to show Regulatory Guide 1.150 Revision 1, would be applicabl !
i Within the areas examined, no violations or deviations were identifie I i