ML20198E611

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/85-45 & 50-414/85-45 on 850930-1004.No Violation or Deviation Noted
ML20198E611
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/04/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20198E614 List:
References
NUDOCS 8511140115
Download: ML20198E611 (1)


See also: IR 05000413/1985045

Text

t}

.

'

W 04 1965

Duke Power Cctrpany

gN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-413/85-45 AND 50-414/85-45

On Septenter 30 - October 4,1985, NRC inspected activities authorized by NRC

Operating License No. NPF-35 and Construction Permit No. CPPR-l'.7 for your

Catawba facility. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed inspection

report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspecticn consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Shculd you have any questiens ccncerning this letter, please centact us.

Sincercly,

,

6 6

Virgil L. Brownice, Chief

Reactor Pro.iects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Peport Nos. 50-413/85-45

and 50-414/85-45

cc w/ enc 1:

f.L. Dick,VicePresident-Construction

3 W. Hampton, Station Manager

bcc w/ enc 1:

4. Johnson, ELD

J . N. Jabbour, NRR

0511140115 851104

Document Contrr>l Desk pon Apocn 05000413

State of south Carolina o PDR

A RC Resident Inspector

RII )n

0 [

ljJ f) f

(-

h4C. -- f I

y )

1

8

JColey:bhg ilake .

(Fierdt/ I /85 1\

10/3$85 ')/85

~.LEol