ML20133N880

From kanterella
Revision as of 13:54, 3 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-400/OL-85-01 Administered on 850611-12.Table Summarizing Exam Results & Copies of Written Exam Questions & Answer Key Encl.Summary of Exam Results Withheld (Ref 10CFR2.790(a))
ML20133N880
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/02/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20133N882 List:
References
NUDOCS 8508140039
Download: ML20133N880 (2)


Text

1 QCll6Y) l

?

August 2, 1985 )

i i

l Carolina Power and Light Company i ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

SHEAR 0N HARRIS EXAMINATION REPORT 400/0L-85-01 The NRC administered examinations on June 11-12, 1985, to employees of your company who had applied for instructor certifications at the Shearon Harris Nuclear Plant. At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided as Enclosure 2.

Copies of the written examination questions and answer key are included in this report as Enclosure 3.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 and 3 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original sioned by DMVerrelli)

David M. Verre11i, Chief Reactor Projects Branch 1 Division of Reactor Projects i

Enclosures:

3

1. Examination Report 50-400/0L-85-01
2. Table of Examination Results (Official Use Only-Privacy Act Information)
3. R0/SR0 Exam Questions and Answer Key cc w/encls. 1 & 2: (See page 2) 8508140039 PDR 850805 G ADOCK 05000400 PDR l l

1k g

e 1E W ,

l 1 .

t Carolina Power and Light Company 2 August 2, 1985 cc w/encls. 1 & 2:

A. C. Tollison, Corporate Training Director J. L. Willis, Plant Manager cc w/encls. 1, 2, & 3:

Howard Smith, Site Training Di*ector bec w/encls. 1, 2, & 3:

Senior Resident Inspector bec w/ encl. 1:

Project Manager, NRR State of North Carolina EG&G Idaho bcc w/encls. 1 & 3:

Operator Licensing Branch, DHFS,NRR Document Control Desk h

7 RII RII RII RI T gers:ht ilson CAJulian PF edrickson 07/n /85 07/f/85 07/3//85 0 /l/85

.