ML20138E473

From kanterella
Revision as of 08:38, 30 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Amend 93 to License DPR-40 & Safety Evaluation. Amend Changes Titles of Senior Mgt Officials & Deletes Environ Qualification of Electrical Equipment Administrative Requirements.Errors in Amends 86 & 88 Corrected
ML20138E473
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/06/1985
From: Tourigny E
Office of Nuclear Reactor Regulation
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20138E477 List:
References
NUDOCS 8512130456
Download: ML20138E473 (3)


Text

i-o December 6, 1985 Docket No. 50-285 DISTRIBUTION:

Docket File NRC & L PDRs LFMB OPA PD 8 Rdg Mr. R. L. Andrews ACRS-10 Regan Division Manager - Nuclear Production FMiraglia EJordan Omaha Public Power District PMKreutzer-3 WJones 1623 Harney Street ETourigny TBarnhart-4 Omaha, Nebraska 68102 OELD BGrimes SECY LHarmon

Dear Mr. Andrews:

EJordan Gray File +4 The Commission has issued the enclosed Amendment No. 93 to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No.1. This amendment consists of changes to the Technical Specifications in partial response to your application dated July 11, 1985.

The amendment changes the titles of senior management officials and deletes environmental qualification of electrical equipment administrative require-ments (deadline and records). This amendment also changes two Table of Contents pages (11 and 111) to reflect current Technical Specification sections.

Lastly, our review of Amendment No. 86 issued on April 3,1985 indicates that we made an error in retyping the footnote to Table 3-3 as contained on page 3-13.

We omitted effluent radiation monitor RM-057. In addition, our review of Amendment No. 88 issued on May 9, 1985 indicates that we made an error in retyping Table 2-4 as contained on page 2-69. We omitted the table title.

He corrected these errors.

A copy of the Safety Evaluation is also enclosed. The notice of issaance will be included in the Comission's next regular monthly Federal Register notice.

Sincerely,

/S/

E. G. Tourigny, Project Manager PWR Project Directorate #8 Division of PWR Licensing-B

Enclosures:

1. Amendment No. 93 to DPR-40
2. Safety Evaluation 8512130456 851206 cc w/ enclosures: PDR ADOCK0500g5 P

See next page

  • See previous white for concurrences PWR#8 * #

PWR#8

  • PWR#8 OELD PKreutzer ETo igny;ef 11/ g/85 AThadani %W,, Mo. JM 11/18/85 $/)/85 / /85 g g %gu ,

wa mfr

+*pr ok

r i

Docket No. 50-285 DISTRIBUTION:

l Docket File LTremper NRC PDR RDiggs L PDR OPA, CMiles Mr. R. L. Andrews ORB #3 Rdg ACRS-10 Division Manager - Nuclear Production HThompson MVirgilio Omaha Public Power District PMKreutzer-3 WJones 1623 Harney Street ETourigny TBarnhart-4 Omaha, Nebraska 68102 OELD BGrimes SECY LHannon l- -

Dear Mr. Andrews:

EJordan Gray File +4

! The Commission has issued the enclosed Amendment No. to Facility Operating

' License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. This amendment consists of changes to the Technical Specifications in partial response to your application dated July 11, 1985.

The amendment changes the titles of senior management officials and delete environmental qualification of electrical equipment administrative require-l' ments deadline and records). This amendment also changes two Table of Contents pages 11 and iii) to reflect current Technical Specification sections.

Lastly, our review of Amendment No. 86 issued on April 3,1985 indicates that we

[ made an error in retyping the footnote to Table /3-3 as contained on page 3-13.

We omitted effluent radiation monitor RM-057. In addition, our review of 4

Amendment No. 88 issued on May 9, 1985 indicates that we made an error in retyping Table 2-4 as contained on page 2-69. We omitted the table title.

j A copy of the Safety Evaluation is also enclosed. The notice of issuance will "

l be included in the Commission's next regular monthly Federal Register notice.

Sincerely, i-E. G. Tourigny, Project Manager

-Operating Reactors Branch #3

Division of Licensing l

Enclosures:

1. Amendment No. to DPR-40
2. Safety Evaluation

!- cc w/ enclosures:

See next page ORBf3:DL- ' ORB #3:D ORI L OELD AD:0R:DL

^

ETouri E# cher GClainas PM@tzer .

[Il/fy85 J/g/85 u h s /85 ' / -/85 / /85 b

e

//f / 2C a

.y.

Mr. R. L. Andrews Fort Calhoun Station Omaha Public Power District Unit No I cc:

Harry H. Voigt, Esq. -

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C. 20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68023 Metropolitan Planning Agency ATTN: Dagnia Prieditis 7000 West Center Road Dr.aha, Nebraska 68107 Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operatins C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

-