Category:INSPECTION REPORT
MONTHYEARIR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203K5991998-02-27027 February 1998 Errata to Insp Rept 50-285/97-20 Issued on 980128.Noncited Violation Withdrawn.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H8611998-01-28028 January 1998 Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20197H0171997-12-19019 December 1997 Insp Rept 50-285/97-19 on 971026-1206.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970141997-11-18018 November 1997 Informs That Insp Rept 50-285/97-14 Has Been Cancelled.No Insp Rept Will Be Issued for Rept Number IR 05000285/19970181997-11-10010 November 1997 Insp Rept 50-285/97-18 on 970914-1025.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970131997-10-0202 October 1997 Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19970161997-09-29029 September 1997 Insp Rept 50-285/97-16 on 970803-0913.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000285/19970171997-09-19019 September 1997 Insp Rept 50-285/97-17 on 970825-29.Violations Being Considered for Escalated Ea.Major Areas Inspected: Operations & Engineering ML20141J8891997-08-15015 August 1997 Insp Rept 50-285/97-15 on 970615-0802.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Fire Sprinkler Sys IR 05000285/19970051997-08-0101 August 1997 Insp Rept 50-285/97-05 on 970714-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000285/19970121997-07-25025 July 1997 Paritally Withheld Insp Rept 50-285/97-12 on 970623-0710 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Licensee Implementation of Land Vehicle Control Measures & Security Surveillance IR 05000285/19970041997-07-0202 July 1997 Insp Rept 50-285/97-04 on 970602-06.Unresolved Items Identified.Major Areas Inspected:Licensee Performance & Capabilities in Control Room Simulator,Technical Support Ctr,Operations Support Ctr & Emergency Operations Facility ML20141E2441997-06-27027 June 1997 Insp Rept 50-285/97-06 on 970414-18 & 0428-0502.Violations Noted.Major Areas Inspected:Current Effectiveness of Licensee Plant & Design Engineering Organizations to Respond to Routine & Reactive Site Activities IR 05000285/19970101997-06-20020 June 1997 Insp Rept 50-285/97-10 on 970504-0614.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203K5991998-02-27027 February 1998 Errata to Insp Rept 50-285/97-20 Issued on 980128.Noncited Violation Withdrawn.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H8611998-01-28028 January 1998 Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20197H0171997-12-19019 December 1997 Insp Rept 50-285/97-19 on 971026-1206.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970141997-11-18018 November 1997 Informs That Insp Rept 50-285/97-14 Has Been Cancelled.No Insp Rept Will Be Issued for Rept Number IR 05000285/19970181997-11-10010 November 1997 Insp Rept 50-285/97-18 on 970914-1025.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970131997-10-0202 October 1997 Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19970161997-09-29029 September 1997 Insp Rept 50-285/97-16 on 970803-0913.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000285/19970171997-09-19019 September 1997 Insp Rept 50-285/97-17 on 970825-29.Violations Being Considered for Escalated Ea.Major Areas Inspected: Operations & Engineering ML20141J8891997-08-15015 August 1997 Insp Rept 50-285/97-15 on 970615-0802.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Fire Sprinkler Sys IR 05000285/19970051997-08-0101 August 1997 Insp Rept 50-285/97-05 on 970714-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000285/19970121997-07-25025 July 1997 Paritally Withheld Insp Rept 50-285/97-12 on 970623-0710 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Licensee Implementation of Land Vehicle Control Measures & Security Surveillance IR 05000285/19970041997-07-0202 July 1997 Insp Rept 50-285/97-04 on 970602-06.Unresolved Items Identified.Major Areas Inspected:Licensee Performance & Capabilities in Control Room Simulator,Technical Support Ctr,Operations Support Ctr & Emergency Operations Facility ML20141E2441997-06-27027 June 1997 Insp Rept 50-285/97-06 on 970414-18 & 0428-0502.Violations Noted.Major Areas Inspected:Current Effectiveness of Licensee Plant & Design Engineering Organizations to Respond to Routine & Reactive Site Activities IR 05000285/19970101997-06-20020 June 1997 Insp Rept 50-285/97-10 on 970504-0614.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203K5991998-02-27027 February 1998 Errata to Insp Rept 50-285/97-20 Issued on 980128.Noncited Violation Withdrawn.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199H8611998-01-28028 January 1998 Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20197H0171997-12-19019 December 1997 Insp Rept 50-285/97-19 on 971026-1206.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970141997-11-18018 November 1997 Informs That Insp Rept 50-285/97-14 Has Been Cancelled.No Insp Rept Will Be Issued for Rept Number IR 05000285/19970181997-11-10010 November 1997 Insp Rept 50-285/97-18 on 970914-1025.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19970131997-10-0202 October 1997 Insp Rept 50-285/97-13 on 970630-0718.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19970161997-09-29029 September 1997 Insp Rept 50-285/97-16 on 970803-0913.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000285/19970171997-09-19019 September 1997 Insp Rept 50-285/97-17 on 970825-29.Violations Being Considered for Escalated Ea.Major Areas Inspected: Operations & Engineering ML20141J8891997-08-15015 August 1997 Insp Rept 50-285/97-15 on 970615-0802.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Fire Sprinkler Sys IR 05000285/19970051997-08-0101 August 1997 Insp Rept 50-285/97-05 on 970714-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000285/19970121997-07-25025 July 1997 Paritally Withheld Insp Rept 50-285/97-12 on 970623-0710 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Licensee Implementation of Land Vehicle Control Measures & Security Surveillance IR 05000285/19970041997-07-0202 July 1997 Insp Rept 50-285/97-04 on 970602-06.Unresolved Items Identified.Major Areas Inspected:Licensee Performance & Capabilities in Control Room Simulator,Technical Support Ctr,Operations Support Ctr & Emergency Operations Facility ML20141E2441997-06-27027 June 1997 Insp Rept 50-285/97-06 on 970414-18 & 0428-0502.Violations Noted.Major Areas Inspected:Current Effectiveness of Licensee Plant & Design Engineering Organizations to Respond to Routine & Reactive Site Activities IR 05000285/19970101997-06-20020 June 1997 Insp Rept 50-285/97-10 on 970504-0614.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] Category:UTILITY
MONTHYEARIR 05000285/19900421990-11-0707 November 1990 Insp Rept 50-285/90-42 on 901015-19.No Violation or Deviations Noted.Major Areas Inspected:Events Re Engineering Ongoing Design Basis Reconstitution Effort IR 05000285/19900351990-09-25025 September 1990 Insp Rept 50-285/90-35 on 900729-0910.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Monthly Maint,Surveillance,Security & Radiological Protection Observations IR 05000285/19900341990-08-16016 August 1990 Insp Rept 50-285/90-34 on 900730-0803.Fire Protection/ Prevention Program Satisfatory.Unresolved Item Re Proper Fire Rating Noted.Major Areas Inspected:Fire Protection/ Prevention Program & Emergency Diesel Generator Problems IR 05000285/19900331990-08-15015 August 1990 Advises That Insp Rept 50-285/90-33 Canceled.No Rept Will Be Issued for Rept Number IR 05000285/19900301990-07-24024 July 1990 Insp Rept 50-285/90-30 on 900513-0616.No Violations Noted. Major Areas Inspected:Monthly Maint,Surveillance,Security, Complex Surveillance Observation,Review of Licensee Outage Plans & Verification of Containment Integrity IR 05000285/19900311990-07-13013 July 1990 Informs That Insp 50-285/90-31 Canceled.No Insp Rept Will Be Issued IR 05000285/19900261990-06-15015 June 1990 Insp Rept 50-285/90-26 on 900416-0512.Noncited Violations Noted.Major Areas Inspected:Operational Safety Verification, Monthly Maint,Surveillance,Security & Onsite Followup of Events & in-ofc Review of Repts IR 05000285/19900251990-06-12012 June 1990 Partially Withheld Insp Rept 50-285/90-25 on 900402-06 & 16- 19 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Physical Security Program,Including Previous Insp Findings, Security Plan,Testing & Maint,Locks,Keys & Combinations IR 05000285/19890321989-09-27027 September 1989 Insp Rept 50-285/89-32 on 890801-31.Violations Noted.Major Areas Inspected:Ler Followup,Operational Safety Verification,Plant Tours,Monthly Maint Observations,Monthly Surveillance Observations & Security Observations ML20246F0811989-08-23023 August 1989 Insp Rept 50-285/89-30 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Implementation of Corrective Actions in Response to NRC Bulletin 87-002 Concerning Fastener Testing IR 05000285/19890281989-08-23023 August 1989 Insp Rept 50-285/89-28 on 890701-31.No Violations or Deviations Noted.Major Areas Inspected:Review of Previously Identified Items,Ler Followup,Operational Safety Verification,Plant Tours & Monthly Maint Observations IR 05000285/19890261989-07-24024 July 1989 Insp Rept 50-285/89-26 on 890601-30.Violations & Deviations Noted.Major Areas Inspected:Review of Previously Identified Items,Ler Followup,Operational Safety Verification,Plant Tours,Security Observations & Monthly Maint Observations IR 05000285/19890271989-07-10010 July 1989 Insp Rept 50-285/89-27 on 890622-23.Violations Noted.Major Areas Inspected:Testing of Turbine Driven Auxiliary Feedwater Pump ML20246N0751989-07-0606 July 1989 Insp Rept 50-285/89-01 on 890313-31 & 0417-21.Violations Noted.Major Areas Inspected:Exams of Work Control Procedures & Representative Records,Interviews & Observations of Work in Progress by NRC Inspectors IR 05000285/19890251989-06-26026 June 1989 Insp Rept 50-285/89-25 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected:Licensee Chemistry/Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000285/19890231989-06-16016 June 1989 Partially Withheld Insp Rept 50-285/89-23 on 890508-10 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support, Security Program Audits & Vital Area Barriers ML20245C9331989-06-15015 June 1989 Insp Rept 50-285/89-22 on 890501-31.Violations Noted.Major Areas Inspected:Ler Followup,Operational Safety Verification,Plant Tours,Monthly Maint Observations,Monthly Surveillance Observations & Security Observations IR 05000285/19890201989-06-14014 June 1989 Assessment Rept 50-285/89-20 on 890417-21 & 0502.Concerns Noted Re Util Steps to Institutionalize Aspects of Safety Enhancement Program.Overall Improvement Demonstrated ML20244C0901989-06-0202 June 1989 Insp Rept 50-285/89-24 on 890508-12.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Changes to Emergency Plan & Implementing Procedures & Supplies IR 05000285/19890171989-06-0101 June 1989 Insp Rept 50-285/89-17 on 890401-30.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Plant Tours,Monthly Maint & Surveillance Observations,Security Observations & Radiological Protection Observations IR 05000285/19890211989-05-23023 May 1989 Insp Rept 50-285/89-21 on 890417-21.No Violations Noted. Major Areas Inspected:Facility Mods & Training & Licensed Operator & Nonlicensed Staff Training ML20247K4771989-05-17017 May 1989 Insp Rept 50-285/89-13 on 890301-31.Violations Noted.Major Areas Inspected:Review of Previously Identified Items,Ler Followup,Operational Safety Verification,Plant Tours, safety-related Sys Walkdown & Monthly Maint Observations IR 05000285/19890181989-05-15015 May 1989 Cancels Insp Rept 50-285/89-18 IR 05000285/19890161989-05-0404 May 1989 Partially Withheld Insp Rept 50-285/89-16 on 890327-31 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support, Safety Enhancement Plan,Audits & Vital Area Barriers IR 05000285/19890151989-04-14014 April 1989 Insp Rept 50-285/89-15 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing After Refueling & Followup to Previous Insp Findings IR 05000285/19890091989-03-24024 March 1989 Insp Rept 50-285/89-09 on 890201-28.Violations & Deviations Noted.Major Areas Inspected:Ler Followup,Operational Safety Verification,Plant Tours,Monthly Maint & Surveillance Observations & Security Observations IR 05000285/19890111989-03-23023 March 1989 Insp Rept 50-285/89-11 on 890227-0303.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radwaste Mgt Programs IR 05000285/19890101989-03-21021 March 1989 Partially Withheld Insp Rept 50-285/89-10 on 890227-0303 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Physical Security Program,Including Mgt Support & Security Program Audits & Security Training & Qualifications ML20236A1751989-03-0707 March 1989 Insp Rept 50-285/89-12 on 890221-24.No Violations or Deviations Noted.Major Areas inspected:post-mod Testing & Followup on Main Steam Safety Valve Issue ML20235Y7561989-03-0303 March 1989 Insp Rept 50-285/89-05 on 890130-0203.Violation Noted.Major Areas Inspected:Previously Identified Insp Findings, Implementation of ATWS Requirements & LERs ML20235U4431989-02-27027 February 1989 Insp Rept 50-285/89-03 on 890101-31.Violation Noted.Major Areas Inspected:Previously Identified Items,Ler Followup, Operational Safety Verification,Plant Tours,Monthly Maint Observations & Monthly Surveillance Observations ML20235M5171989-02-17017 February 1989 Insp Rept 50-285/89-08 on 890206-10.Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings IR 05000285/19890021989-02-15015 February 1989 Insp Rept 50-285/89-02 on 890130-0203.Violations Noted. Major Areas Inspected:Low Power Physics Testing,Complex Surveillance & Reactor Thermal Shield Sway Test Results ML20235K1421989-02-14014 February 1989 Insp Rept 50-285/89-04 on 890117-20.Four Apparent Violations Noted.Major Areas Inspected:Allegation Re High Radiation Area Incident on 890126 IR 05000285/19880431988-12-0101 December 1988 Insp Rept 50-285/88-43 on 881114-18.One Violation & Unresolved Item Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Structural Welding Activities IR 05000285/19880341988-11-14014 November 1988 Insp Rept 50-285/88-34 on 881016-21.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Current Refueling Outage & Allegations Re Conduct of Radiation Protection Program IR 05000285/19880371988-11-0303 November 1988 Insp Rept 50-285/88-37 on 881017-21.Violation Noted.Major Areas Inspected:Design Changes & Mods,Receipt,Storage & Handling of Equipment & Matls & Measuring & Test Equipment IR 05000285/19880321988-11-0303 November 1988 Insp Rept 50-285/88-32 on 880901-30.Violation Noted.Major Areas Inspected:Followup on Previously Identified Items, Operational Safety Verification,Plant Tours,Monthly Maint Observations & Security Observations ML20206B9641988-11-0303 November 1988 Insp Rept 50-285/88-37 on 881017-21.Violation Noted.Major Areas Inspected:Design Changes & Mods,Receipt,Storage & Handling of Equipment & Matls & Measuring & Test Equipment IR 05000285/19880401988-11-0202 November 1988 Insp Rept 50-285/88-40 on 881024-28.Violation Noted.Major Areas Inspected:Welding & NDE Activities IR 05000285/19880381988-10-26026 October 1988 Partially Withheld Insp Rept 50-285/88-38 on 881004-14 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Security Observations IR 05000285/19880311988-10-18018 October 1988 Insp Rept 50-285/88-31 on 880912-16.Violations & Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings,Welding,Design Changes & Mods,Procurement & Receipt,Storage & Handling of Equipment & Matls IR 05000285/19880301988-09-21021 September 1988 Insp Rept 50-285/88-30 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Program for External & Internal Radiation Exposure Control Programs & Surveys IR 05000285/19880271988-09-21021 September 1988 Insp Rept 50-285/88-27 on 880801-31.No Violations or Deviations Noted.Major Areas Inspected:Ler Followup, Operational Safety Verification,Plant tours,safety-related Sys Walkdown & Monthly Maint Observations ML20154L2961988-09-19019 September 1988 Insp Rept 50-285/88-25 on 880808-19.Violation Noted.Major Areas Inspected:Followup to Previous Insp Findings,Followup to Lers,Temporary Instructions & 10CFR Part 21 Repts IR 05000285/19880281988-09-16016 September 1988 Insp Rept 50-285/88-28 Om 880822-26.Violations Noted.Major Areas Inspected:Fire Protection/Prevention Program, Triennial post-fire Safe Shutdown Capability Reverification & Followup on Previously Identified Items IR 05000285/19880261988-09-14014 September 1988 Insp Rept 50-285/88-26 on 880725-29.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Implementation of Inservice Testing Program for Valves & Pumps,Procedures,Results,Training,Witnessing & Maint IR 05000285/19880241988-09-0707 September 1988 Partially Withheld Insp Rept 50-285/88-24 on 880725-28 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Followup on Previously Identified Items,Lers,Review of Security Plan & Implementation Procedures & Compensatory Measures ML20207H7311988-08-19019 August 1988 Insp Rept 50-285/88-23 on 880701-31.Violations Noted.Major Areas Inspected:Previously Identified Items,Operational Safety Verification,Plant tours,safety-related Sys Walkdown & Monthly Maint,Surveillance & Security Observations ML20154K1311988-08-19019 August 1988 Insp Rept 50-285/88-200 on 880218,0321-25 & 0404-08. Violations Noted.Major Areas Inspected:Adequacy of Corrective Actions Initiated by Licensee in Response to 47 Design Findings Identified in Insp Rept 50-285/85-22 1990-09-25
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-IV-99-048, on 991026,Fort Calhoun Station Operators Reported Alert Because 4160 Volt Vital Buses 1A4 Were Deenergized for Approx 2 Minutes.Electrical Maint Personnel Have Inspected Electrical Equipment Inside & Outside Plant1999-10-26026 October 1999 PNO-IV-99-048:on 991026,Fort Calhoun Station Operators Reported Alert Because 4160 Volt Vital Buses 1A4 Were Deenergized for Approx 2 Minutes.Electrical Maint Personnel Have Inspected Electrical Equipment Inside & Outside Plant IR 05000285/19990101999-10-15015 October 1999 Insp Rept 50-285/99-10 on 990913-17.One NCV Noted.Major Areas Inspected:Mitigating Sys,Reactor Safety IR 05000285/19990091999-10-14014 October 1999 Insp Rept 50-285/99-09 on 990913-17.No Violations Noted. Major Areas Inspected:Effective Implementation of Protective Strategy When Required to Respond to Contingency Events ML20211P3441999-09-0707 September 1999 Insp Rept 50-298/99-08 on 990711-0821.No Violations Noted. Major Areas Inspected:Initiating Events,Mitigating Systems & Barrier Integrity IR 05000285/19990061999-09-0303 September 1999 Insp Rept 50-285/99-06 on 990809-12.No Violations Noted. Major Areas Inspected:Cornerstone Area of Reactor Safety, Emergency Preparedness.Insp Included Review of Licensee Program for Problem Identification & Resolution IR 05000285/19990071999-08-13013 August 1999 Insp Rept 50-285/99-07 on 990719-23.No Violations Noted. Major Areas Inspected:Accuracy & Operability of Radiation Monitoring Instrumentation Used for Protection of Occupational Workers IR 05000285/19990051999-07-19019 July 1999 Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted. Major Areas Inspected:Broad Categories of Reactor Safety, Emergency Preparedness & Other Activities ML20195J2591999-06-11011 June 1999 Insp Rept 50-285/99-04 on 990425-0531.Noncited Violations Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000285/19990031999-05-18018 May 1999 Insp Rept 50-285/99-03 on 990314-0424.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support PNO-IV-99-025, on 990513,possible Stop Work in Response to Contract Dispute Occurred.Union Maint Personnel May Participate,But Operators & Security Personnel Will Not Participate.No Press Release Is Planned1999-05-14014 May 1999 PNO-IV-99-025:on 990513,possible Stop Work in Response to Contract Dispute Occurred.Union Maint Personnel May Participate,But Operators & Security Personnel Will Not Participate.No Press Release Is Planned IR 05000285/19990021999-04-0202 April 1999 Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19990011999-03-11011 March 1999 Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified.Major Areas Inspected:Evaluation of Cumulative Effect of Operator Workarounds at Plant Reactor Facility IR 05000285/19980191999-01-0808 January 1999 Insp Rept 50-285/98-19 on 981005-23 & 1211.Violations Noted. Major Areas Inspected:Corrective Action Program in Identifying Evaluation,Correcting & Preventing Problems That Affect Safe Operation of Facility ML20206R1601999-01-0808 January 1999 Notice of Violation from Insp on 981005-23 & 1211.Violations noted:licensee-established Measures Failed to Assure Prompt Identification & Effective Corrective Action to Address Potential for Core Reactivity Change IR 05000285/19980231999-01-0707 January 1999 Insp Rept 50-285/98-23 on 981108-1219.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000285/19980251998-12-30030 December 1998 Insp Rept 50-285/98-25 on 981130-1204.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program IR 05000285/19980261998-12-17017 December 1998 Insp Rept 50-285/98-26 on 981131-1204.Deviations Noted. Major Areas Inspected:Plant Support Activities ML20198J2051998-12-17017 December 1998 Notice of Deviation from Insp on 981131-1204.Deviation Noted:Licensee Quality Assurance Dept Conducted Biennial Audits of All Transfer,Packaging & Transport Activities Involving Radioactive Matl IR 05000285/19980131998-12-16016 December 1998 Insp Rept 50-285/98-13 on 981130-1204.No Violations Noted. Major Areas Inspected:Review Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000285/19980241998-11-20020 November 1998 Insp Rept 50-285/98-24 on 981102-06.Violations Noted.Major Areas Inspected:Plant Support ML20195H8021998-11-20020 November 1998 Notice of Violation from Insp on 981102-06.Violation Noted: from 4:45 to 11:45 Am on 980423,room 13 on Elevation 989 Ft of Auxiliary Building Not Posted as Airborne Radioactivity Area When Sample Results Showed Excess Radioactivity IR 05000285/19980211998-11-13013 November 1998 Insp Rept 50-285/98-21 on 980927-1107.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980171998-10-28028 October 1998 Insp Rept 50-285/98-17 on 980928-1002.No Violations Noted. Major Areas Inspected:Licensee Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements IR 05000285/19980181998-10-0808 October 1998 Insp Rept 50-285/98-18 on 980831-0902.No Violations Noted. Major Areas Inspected:Changes to Fort Calhoun Station Radiological Emergency Action Levels IR 05000285/19980201998-10-0505 October 1998 Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980221998-09-29029 September 1998 Insp Rept 50-285/98-22 on 980914-18.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Reviewed Implementation of Radiological Environ & Meteorological Monitoring Programs IR 05000285/19980141998-08-28028 August 1998 Insp Rept 50-285/98-14 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000285/19980121998-08-17017 August 1998 Insp Rept 50-285/98-12 on 980601-05 (on Site) & 980811 (in Ofc).One Noncited Violation Noted.Major Areas Inspected: Operations,Maint & Engineering.Root Cause Assessment, Performed as Result of 980527 Pump FW-10 Occurrence IR 05000285/19980151998-08-0606 August 1998 Insp Rept 50-285/98-15 on 980727-31.No Violations Noted. Major Areas Inspected:Testing & Maint,Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids, Security Event Logs & Security Training & Qualifications IR 05000285/19980161998-07-29029 July 1998 Insp Rept 50-285/98-16 on 980706-10.Violations Noted.Major Areas Inpected:Solid Radwaste Mgt & Radioactive Matls Transportations,Associated Training Activities & QA Oversight ML20236W2931998-07-29029 July 1998 Notice of Violation from Insp on 980606-10.Violation Noted: Licensee Did Not Take Dry Active Samples Annually.Dry Active Waste Stream Samples Were Collected in June 1995 & Aug 1997 IR 05000285/19980101998-07-21021 July 1998 Insp Rept 50-285/98-10 on 970524-0704.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236M7531998-07-0808 July 1998 Notice of Violation from Insp on 980521-0605.Violation Noted:On 980520,licensee Personnel Did Not Write Maint Work Document to Document Deficiency W/Valve FP-230 Following Manipulation of Valve ML20236M7581998-07-0808 July 1998 Insp Rept 50-285/98-11 on 980521-0605.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000285/19980091998-06-25025 June 1998 Errata to Insp Rept 50-285/98-09.Correction Due to Errrors on Pages 5 & 13 ML20249A6181998-06-15015 June 1998 Insp Rept 50-285/98-09 on 980412-0523.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20249A6171998-06-15015 June 1998 Notice of Violation from Insp on 980412-0523.Violation Noted:On 980402,licensee Did Not Have Adequate Procedure for Performing Activity That Affected Quality PNO-IV-98-021A, on 980526,update to Loss of Offsite Power Made.Components Have Been Replaced & Sys Functioning Properly.Correction Should Be Made to Info in Original Pn. Nonvital Buses 1A1 & 1A2 Continuously Energized1998-05-26026 May 1998 PNO-IV-98-021A:on 980526,update to Loss of Offsite Power Made.Components Have Been Replaced & Sys Functioning Properly.Correction Should Be Made to Info in Original Pn. Nonvital Buses 1A1 & 1A2 Continuously Energized ML20249C1431998-05-24024 May 1998 Notice of Violation from Insp on 980415-24.Violation Noted: Inspectors Identified That Licensee Had Not Submitted in 1984 & 1994 Relief Requests for Code Class Welds That Did Not Receive Full Exam Coverage During 10-yr ISI Intervals IR 05000285/19980071998-05-24024 May 1998 Insp Rept 50-285/98-07 on 980415-24.Violations Noted.Major Areas Inspected:Operations & Maint PNO-IV-98-021, on 980520,loss of Offsite Power Occurred as Result of Fault on Transformer T1A-3,161 Kv to 4 Kv Transformer Which Supplies Power to One of Two Vital Electrical Buses.Special Followup Initiated on 9805211998-05-21021 May 1998 PNO-IV-98-021:on 980520,loss of Offsite Power Occurred as Result of Fault on Transformer T1A-3,161 Kv to 4 Kv Transformer Which Supplies Power to One of Two Vital Electrical Buses.Special Followup Initiated on 980521 ML20217N0991998-04-30030 April 1998 Insp Rept 50-285/98-06 on 980406-10.Violations Noted.Major Areas Inspected:Plant Support ML20217N0931998-04-30030 April 1998 Notice of Violation from Insp on 980406-10.Violation Noted: on 980407,individual Working in Accordance W/Radiation Work Permit 98-0011 Entered Restricted High Radiation Area in Steam Generator Bay B W/O Radiation Protection Coverage IR 05000285/19980051998-04-22022 April 1998 Insp Rept 50-285/98-05 on 980301-0411.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20217E0061998-04-22022 April 1998 Notice of Violation from Insp on 980301-0411.Violation Noted:Inspectors Identified That Licensee Did Not Have Procedure for Performing an Activity That Affected Quality ML20217Q9251998-04-0606 April 1998 Insp Rept 50-285/98-01 on 980120-23 & 26-0306.No Violations Noted.Major Areas Inspected:Plant Support,Including Fire Protection Program IR 05000285/19980031998-03-27027 March 1998 Insp Rept 50-285/98-03 on 980223-27 & 0311-18.No Violations Identified.Major Areas Inspected:Licensee Physical Security Program,Access Authorization,Alarm Stations,Communications, Access Control of Event Logs & Mgt Support ML20217D4471998-03-25025 March 1998 Notice of Violation from Insp on 980209-13 W/In Ofc Insp Until 980302.Violation Noted:Since Aug 1994 QA Lead Auditor Had Not Satisfied or Completed QA Qualification Manual Requirements Prior to Conducting Lead Auditor Functions IR 05000285/19980021998-03-25025 March 1998 Insp Rept 50-285/98-02 on 980209-13 W/In Ofc Insp Until 980302.Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000285/19980041998-03-12012 March 1998 Insp Rept 50-285/98-04 on 980118-0228.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-07
[Table view] |
Text
.
APPENDIX B U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-285/85-15 License: DPR-40 Docket: 50-285 Licensee: Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 Facility Name: Fort Calhoun Station Inspection At: Fort Calhoun Station, Blair, Nebraska Inspection Conducted: July 1-August 31, 1985 Inspector:
L. A. Yai1 dell, Senior Resident Reactor Inspector Yt9/Rf Date'
Approved: /b/' ///$
L.'EV Martin, Chi ,7roject Section 8, 04tt Reactor Projec s Branch Inspection Summary:
Inspection Conducted July 1-August 31, 1985 (50-285/85-15)
Areas Inspected: Routine, unannounced inspection of licensee action on previous inspection findings, operational safety verification, preparation for refueling, surveillance testing, maintenance activities, Technical Specification implementation, and followup of IE Bulletin 3. The inspection involved 205 inspector-hours onsite by one NRC inspector, of which 40 were offshift hour Results: Within the seven areas inspected, three violations were identified (failure to establish document control procedures paragraph 2; failure to meet licensing requirements paragraph 3; and failure to implement Technical Specification surveillance requirements. paragraph 7).
8510240343 851018 PDR ADOCK 05000295 O PDR
, _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _-___ _
-
,
-
^
-2-DETAILS Persons Contacted R. L. Andrews, Division Manager, Nuclear Production
- G. Gates, Manager, Fort Calhoun Station R. L. Jaworski, Section Manager, Technical Services J. K. Gasper, Manager, Administrative Services T. J. McIvor, Manager, Supervisor Technical J. J. Fisicaro, Supervisor, Nuclear Regulatory and Industry Affairs J. E. Lechner, Test Engineer K. C. Hyde, Test Engineer R. J. Mueller, Supervisor, I&C and Electrical Field Maintenance R. C. Kellogg, Supervisor, Mechanical Technical Services B. R. Livingston, Manager, Engineering Services R. A. McKee, Records Coordinator M. E. Eidem, Manager, Mechanical Engineering P. M. Surber, Section Manager, Generation Station Engineering L. T. Kusek, Supervisor, Operations j G. L. Roach, Supervisor, Chemical & Radiation Protection F. K. Smith, Plant Chemist
.
B. A. Schmidt, Chemical & Radiation Protection Technician
'
J. J. Fluehr, Supervisor, Station Training M. R. Christensen, Training Instructor
'
.
R. A. Johansen, Test Engineer '
R. R. Johnston, Senior Programmer D. J. Hunderloh, Licensing Engineer A. L. Richard, Corporate Quality Assurance
- Denotes attendance at the exit interview The NRC inspector also talked with and interviewed other licensee employees during the inspection. These employees included licensed and
- unlicensed operators, craftsmen, engineers, and office personne . Licensee Action on Previous Inspection Findings (0 pen) Unresolved Item 285/8115-04, " Drawing Update." The regional NRC inspector noted that the licensee "had a long history of problems
. . . with the timeliness of drawing revision." The licensee had stated that an organizational change was proposed so that "a more efficient use of drafting personnel could be realized." This i matter was examined again in December 1983 (NRC Inspection Report 285/83-29), and a large backlog of drawing revisions still existed because of the extensive drawing update effcrt in progress, (see discussions in NRC Inspection Report 285/01-15, paragraph 3 and 285/85-05, paragraph 2.d). By Letter LIC-82-368 dated November 19, 1982, the licensee informed the NRC that "the drawing update would be complete two months following the 1984 refueling outage." As discussed in NRC Inspection Report 285/85-05 and i
.- -
.
'
.
.
,
-3-
,
L
,
Licensee Memo GSE-FC-84-675, the drawing update effort is completed
! and the licensee has revised plant modification control procedures
! to ensure timely update of drawing Standing Order G-21, " Station Modification Control," Section 5.8.5,
'
requires that " interim updated P&ID's and EM's detailing all applicable changes have been provided to the control room (two sets)
!
and the office area (one set)." This review by the System Acceptance Comittee ensures that these drawings are updated and available for
,
use in a timely manner. The NRC inspector has spot checked the control room documents on various occasions and verified that these '
,
revised drawings were available prior to the plant accepting the system modification. In addition, Section 6.1 of Standing Order G-21 has been revised to indicate that " design documents affected by a
'
modification will normally be updated by Generation Station Engineering (GSE) within 12 weeks following receipt of a Modification Completion Report." The NRC inspector reviewed the GSE drawing
control system and noted that all design changes / drawing updates are tracked and prioritized. The NRC inspector determined that about
- 50 percent of the drawing updates were not being completed within i 12 weeks, but recognized that the licensee considers this a " normal" t t
,
turnaround period that may be modified by work load and priorit Since the important control room documents (P& ids and EM drawings)
- were being updated in a timely fashion as part of the SAC review, the NRC inspector considered this position acceptable provided that the l remainingmarkedup(interim)mechanicalandelectricalprintswere "
- available for use in the plant files. The NRC inspector reviewed the plant files and determined that the licensee talled to provide a j drawing control system that identifies changes in progress to a i
'
3 specific drawing and to make the interim drawings available to the l craftsman. At the time of the inspection completed design change [
l packages (with the associated interim drawings) were kept in cabinets f l in the office area and were not part of the plant print files as
! required by the SAC review in Standing Order G-21 Step 5.8.5, Item 6.
j These interim drawings are the only prints available containing j current information for use by plant personnel during the update of the design document by GSE. This failure to establish procedures for
- control of interim drawings is an apparent violation against 10 CFR 50, -
j Appendix B Section IV, " Document Control," which requires that
" measures . . . be established to control the issuance of documents,
, such as . . . drawings, including changes thereto, which prescribe all t activities affecting qualit These measures shall assure that documents, including changes, . . . are distributed to and used at the
location where the prescribed activity is performed." (285/8515-01)
This violation was previously transmitted with with Notice of Violation by NRC letter of August 12, 1985.
=
b. (Closed)Openitem 285/8304-01. " Fire Brigade Leader." The regional NRC
inspector identified that the shift supervisor was assigned as the j, fire brigade leader in the plant response organization. The licensee
!
r I
_ - _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ - _ - _ _ _ _ _ _ _ _
.
-4-i initiated action to increase the number of qualified personnel on each shift and to " assign the responsibilities of fire brigade leader to someone other than the shift supervisor when they are available." :
The number of qualified personnel on each shift was increased and the i licensee recently completed fire brigade training that provided other
'i personnel to assume the responsibilities as fire brigade leade Administrative Procedure G-28 " Station Fire Protection Plan," has been revised to designate the Licensed Equipment Operator - Nuclear as the fire brigade leade This item is considered close . Operational Safety Verification j The NRC inspector performed activities as described below to ascertain
'
that the facility is being maintained in conformance with regulatory
- requirements and that the licensee's management control system is effectively discharging its responsibilities during power operation,
,
t i i
3 The NRC inspector made several control room observations to verify proper shif t manning, operator adherence to approved procedures, '
- adherence to selected Technical Specifications, and operability of the reactor protective system and engineered safeguards equipment.
- Selected logs, records, recorder traces, annunciators, panel indications, and switch positions were reviewed to verify compliance I with regulatory requirements. The Ifconsee's equipment control was j reviewed for proper implementation by reviewing maintenance order i
status and the tag-out log, and by verifying selected safety-related i tag-out The NRC inspector observed several shift turnovers, The NRC inspector toured the plant at various times to assess plant and equipment condition The following items were observed during these tours:
'
,
, . General plant conditions
!
.
Vital area barriers not degraded or appropriately manned by '
security personnel
!
. Adherence to requirements of radiation work permits (RWPs) l
. Proper use of protective clothing and respirator $
l
'
. Plant housekeeping and cleanlinesa practices, including fire hazards and the control of combustible material
. Work activities being performed in accordance with approved activities
! . Physical security j . HP instrumentation is operable and calibrated
,
During one of the plant tours the NRC inspector noted that bottle storage inside the auxiliary building was not in conformance with the
.
_ _ _ _ _ _ _ _ _ _ - _ . _ _ - _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ - _ - - . - _ . _ - . _ . _ - _ _ _ _ _ - _ _ - . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ - _ - _ _ _ _ . - _ _ _ - . - - - - _ _ - . _ - - . . - - _ _ _ . _ - _ . _ . . - _ _ . _ - _ _ - -
- - . _ . . - . . .
!
'
.
i
'
'
-5-
.
requirements of Standing Order G-6, " Housekeeping," and these discrepancies were discussed with the plant manager. The licensec
'
initiated action to correct these deficiencies, and to remove unnecessary and improperly stored bottles from the auxiliary building.
l The NRC inspector verified operability of the following safety-related systems by performing a walkdown and switch
- verification of the accessible portions of the system:
!
!
. Raw Water System (partial) per Checklist RW-1-CL-A
!
. 120V AC Electrical Distribution per Checklist EE-4-CL-A I
. High Pressure Safety Injection System per Checklist SI-1-CL-A.
. Low Pressure Safety Injection System per Checklist SI-1-CL-B
,
. Safety Injection Tanks and Leakage System per Checklist SI-1-CL-C I
i
. Containment Spray System.per Checklist CS-1-CL-A
. Auxiliary Feedwater per Checklist FW-1-CL-A i
. Engineered Safeguards Controls per Checklist ES-1-CL-A
!
I The NRC inspector observed portions of Containment Purges 85029, j 85030, 85031, and 85035, reviewed the discharge permits, and noted the following: i
- . The X/Q log was maintained, the readings were within limits, and l the shift supervisor review was performed
'
.
'
. When the Ilmiting X/Q was exceeded, the release was terminated '
and the applicable data recorded i i . VIAS was tested using RM 061 or RM 062 ;
{ . The stack dewpoint and annubar readings were taken
. The tritium sampler was in place and the sample was taken j . The recommended release rate was established, and the actual flow was lower than that authorized
. Radinactivity analyses were performed
. The required effluent monitors and recorders were operational and the alert setpoints had been reset based on activity levels
. The required auxiliary building exhaust fans were operating
'
.
-6-
. 01-VA-1,Section IV.G was attached to the permit
. The initial reading of the stack flow integrator was noted on the recorders
. The operations checklist to CMP 4.5 was complete and signed off by the shift supervisor
. The required approvals were obtained when the release was extended for one day
. The permit was reviewed and signed off properly, and the termination time was established e. The NRC inspector observed portions of Discharge Permit 85105 for "B" Monitor Tank. The NRC inspector verified that a tank sample had been taken and analyzed, that all radiological and chemical discharge limits were satisfied in the discharge tunnel, that the tank had been recirced for 30 minutes prior to sampling, that the functional tests for HCV-691 and HCV-692 were performed using RM-055, and that the maximum release rate was established. It was noted by the NRC inspector that the required start /stop times and initial / final totalizer readings were recorded and that Section IV.B of OI-WDL-3 was attached to the completed discharge permi f. The licensee received word from Region IV on July 8, 1985, that all six license candidates (four R0 and two SRO) passed. On August 22, Mr. R. D. Martin, Region IV Regional Administrator, visited Omaha to participate in a dinner honoring the successful candidates and to present them with their NRC license certificates. Mr. Martin also met with OPPD management earlier that afternoon and toured Fort Calhoun Station the following day, Items discussed with the licensee during this visit included OPPD's efforts to improve SALP category 3 areas in security and training, emergency preparedness, OPPD's plans regarding a plant specific simulator, and NUREG-1154 (Davis Besse incident).
g. On July 24, 1985, the annual emergency preparedness drill was conducted at the Fort Calhoun Station. A team of NRC inspectors and contract personnel were onsite and at the EOF for the exercis The NRC inspector acted as an observer in the control room, attended the licensee's critique, and participated in the NRC critique / exit interview. The detailed discussion and evaluation of the exercise will be contained in NRC Inspection Report 285/85-1 h. Mr. E. J. Tourigny, the NRR Project Manager for the Fort Calhoun Station, visited the site for meetings with the resident inspector and a tour of the facility. While inspecting the UF6 storage area with Mr. Tourigny, the NRC inspector observed that two cans of paint with " flammable" markings, two open paint buckets, and assorted paint trays, rollers, and brushes were within the area boundarie This is an apparent violation against US NRC License SMC-1420 and
.
-7-paragraph A-2 of the supplement dated February 26, 1982 (LIC-82-051),
which states that the " proposed storage locations will be maintained free of combustible materials." (285/8515-02)
A review of the key log by the NRC inspector indicated that general maintenance personnel had been in the UF6 storage area on July 11-12, 1985. The NRC inspector also noted that guards had made routine security checks during the previous few days and had failed to bring this situation to the attention of the plant managemen The shift supervisor initiated action that af ternoon to have this flammable material removed from the storage area and the NRC inspector verified the following morning that this was accomplished, An initial planning meeting for the outage inspection program to be conducted during the 1985 refueling outage was held at the Jones Street office on July 29-30, 1985. Representatives from I&E headquarters in Washington, DC received various licensee materials related to administrative and technical procedures, QA programs, and the outage work schedule. The full NRC outage inspection team had their first meeting with the licensee on August 19, 1985, to perform the pre-outage review. The tentative schedule for the remaining portion of the inspection program is as follows:
. September 16-27, 1985, Outage Design Inspection
. November 4-15, 1985, Installation Inspection
. December 7-13, 1985, Pre-Operational Readiness Inspection No other violations or deviations were identifie . Preparation for Refueling In preparation for the refueling outage that starts in September of this year, the licensee received 44 new fuel bundles onsite during July. The NRC inspector inspected the shipping containers while they were still on the trailers and noted that the seismic detectors mounted on the containers were not tripped and that the tiedowns were secure. The NRC inspector observed the of floading and unpacking of some of the containers, and witnessed the receipt inspection performed on Bundles LA-14, LA-15, LA-16, LA-17, and LA-23. During the inspection the following was noted:
. A qualified fuel receipt inspector was present
. HP requirements were satisfied and required surveys (swipes and dose readings) were taken
. The fuel vendor representative was present
. Form FC-224. " Radiological Survey Diagram," was being kept on each fuel bundle
. A qualified operator was operating the crane
_-
'
.
f-8-
. Special Procedure SP-NFR-1, Rev. 9, " Fuel Receipt Procedures," was reviewed and found to be the current revision, the prerequisites were signed off, and Form A-2, " Fuel Receiving Record Container Report,"
was being maintained current
. The qualification records of two new fuel receipt inspectors were completed and signed off properly
. Communications between FH-12 and the fuel receipt area were established
. Survey equipmeat used was in calibration Following unloading of the new fuel, the NRC inspector observed the loading of the empty containers and verified that swipe surveys were taken and counted prior to releasing the trailer from the sit No violat ons or deviations were identifie i 5. Surveillance Testing The NRC inspector witnessed portions of the following surveillance tests:
. ST-ESF-1, F.2 (Monthly) Pressurizer Pressure Channel Check
.
ST-RPS-3, F.2 (Morthly) Reactor Coolant Low Flow Trip Check
.
ST-ISI-CVCS-1, F.1 (Quarterly) CVCS Category B Valve Exercising Test
. ST-ESF-6, F.2 (Monthly) Diesel Generator Check - Appendix A
. ST-PPS-12, F.2 (Monthly) Axial Power Distribution Channel Test
. ST-ESF-11, F.1 (Monthly) Steam Generator Pressure Channel Check
.
ST-ISI-CC-3, F.1 (Quarterly) and F.2 (Annual) Component Cooling Water Pump Inservice Testing No violations or deviations were identifie . Maintenance Activities Maintenance Order (MO) 852133, " HIC Shipping Cask." Maintenance support was required for loading and securing the HICs into the shipping cas The NRC inspector reviewed the M0 for proper approvals, and verified that the prerequisites were signed of RWP-166 was assigned to this job, and the NRC inspector verified that the engineer assigned to the job was present, that QC signoffs were r observed, and that HP coverage was provided, Preventive Maintenance on SI-2A, The NRC inspector observed that the annual changeout of bearing oil was performed using
'
.
-9-Procedure MP-EE-8, " General Electric 8000 Series Horizontal Induction Motors." The NRC inspector verified that the proper revision was used, that the initial conditions were signed off, and that qualified personnel were assigned to the jo At the same time, breaker maintenance was performed using Procedure PM-EE-3.2, " Types AK-2-25 and AK-2-50 Circuit Breaker." The NRC inspector reviewed the procedure and verified that the prerequisites were signed of Tag-Out 85-480 was verified to be correctly hung and it was noted that the pink copy of the tag-out sheet was signed off by the craftsma c. MO 851416, " Component Cooling Water Pump AC-3C." This M0 was written to changeout the bearings and the NRC inspector observed the taking of measurements on the installed set of bearing It was noted that the MO was filled out and approved by the shift supervisor, that QC was to witness work done and operability of the pump, that Tag-Outs85-492 and 85-493 were issued to cover this work, and that Technical Specifications 2.2 and 2.3 were identified as applicabl The NRC inspector observed assembly of the pump and performance of Surveillance Test ST-ISI-CC-3, F.1, " Component Cooling Water Pump Inservice Test," to verify operabilit d. MO 855187, "HCV 269-1, Makeup Water Header Isolation Valve." It was determined that a failed diaphragm on the air operator prevented the
- valve from being operated for a CVCS surveillance test. The NRC inspector was'present when the problem was discovered and observed the processing of the M0 and the maintenance procedure that was prepared for PRC approval. QA/QC signoffs were present and the required spare parts were made available from the storeroom. The NRC inspector reviewed the safety evaluation (FC-154) and observed the final. testing and signoff of the surveillance test after the valve repair was complete .
e. MO 852375, " Component Cooling Water Pump AC-3C." Increased vibration readings called for the motor to be removed for balancing. The MO was reviewed for completeness and the NRC inspector noted that Surveillance Test ST-ISI-CC-3, F.1 was to be performed (vibration portion only), that QC was required to verify operability, and that the IRD readings were to be forwarded to QA for review. The rotor was removed and sent to a company in Omaha for balancing. The rotor was reinstalled and aligned and ST-ISI-CC-3, F.1 was performed. Pump vibration was' acceptable but the motor readings did not improve. The vibration data was forwarded to plant engineering for evaluation and AC-3C was " yellow-tagged" for use only in an emergency. As a followup the NRC inspector learned that the licensee determined to rebalance the rotor and the coupling together as a unit. This was accomplished and the NRC inspector noted that the surveillance test was performed successfully and the restrictive tag on pump operation was removed.
.
.
-10- SROC0 85-23, " Waste Gas Header Moisture Drain." The NRC inspector observed work on this modification in Room 16 of the auxiliary building and noted the following items in the work package:
. Form H. " Pre-Installation Modification Control." QA and PRC i signoffs were present and purchasing data was listed
. The green QA Material Conformance tags
. Form FC-154, " Safety Evaluation"
. Form FC-379, "ALARA Review Checklist," filled out and approved
. PRC approved procedure with QA/QC prerequisites signed off and the approved drawing list attached
. Flame Cutting & Welding Permit MO 851993, " Reactor Protective System." On June 21, 1985, a low steam generator level trip occurred on "A" Channel. Level Instrument A/LI-904 read normal and the voltage on. Trip Unit No. 5 read norma i The trip cleared after a few minutes without the cause being determined, and the licensee elected to keep the M0 open. The NRC inspector reviewed the M0 for completeness and noted that QA/QC signoffs were present, that Technical Specification 2.15 applied, and that the outage was established by the shift supervisor. On July 11, .1985, a PRC approved maintenance procedure was used to check Trip Unit No. S's power supply and function. Trip Unit Nos. 4 and 5 were swapped to isolate the problem but no conclusions were drawn and the M0 remained open. On August 25, 1985, the alarm was received again and remained energized. The source of trouble was traced to the power supply and a new one was installed immediately. The NRC inspector observed the troubleshooting in progress and noted that curre.nt drawings were present at the jobsite. The repairs were completed and the channel verified operable by performance of Surveillance Test ST-RPS-6, F.2, " Steam Generator Level Channels Test." MO 852902, " Valve HCV-7468." Valve HCV-7468 was giving both open and shut indication when the valve was in the open position. The NRC inspector reviewed the approved M0 and went with the craftsmen to investigate the problem. It was noted that appropriate safety and HP precautions were taken, and it was determined that the limit switch needed adjustment. The NRC inspector observed this being done and witnessed the performance of Surveillance Test ST-ISI-VA-1, F.1,
" Ventilating Air, Category A, Valve Exercising Test," to verify operability of the valve indicatio . M0 853009,." Charging Pump CH-1A." The'operatois determined that CH-1A was experiencing excessive packing leakage while operat.ing.
- The NRC inspector reviewed the M0 and verified that the applicable
! Technical Specification was identified', that Tag-Out 85-590 was assigned'to this work, and that Surveillance-Test ST-ISI-CVCS-3, F.1,
!
,
r
..
- _ _ - _ . 7 ,- , , , , , , - -,m
.
-11-
"CVCS Pump Test," was required to verify operabilit It was noted that Maintenance Procedure MP-CH-1, " Inspection and Repair of Charging Pumps," was used to perform this work, that RWP-209 was assigned to this job, and that QC signoffs were presen No violations or deviations were identifie . Technical Specification Implementation Amendment No. 87 to the Fort Calhoun Technical Specifications was issued on April 29, 1985, and incorporated "new Technical Specifications addressing the operability and surveillance requirements for the new Toxic Gas Monitoring System." Item No. 29 of Table 3-3 established the frequencies for various surveillance functions to be performe The NRC inspector reviewed Surveillance Test ST-TGM-1, " Toxic Gas Monitors," which was initially issued on June 18, 1985, to establish procedures to perform these required surveillance It was noted that each specific surveillance identified in Item 29 of Table 3-3 was incorporated into ST-TGM-1. The NRC inspector determined on July 15, 1985, that the licensee failed on each shift to " read, compare, and compare readings on the ppm gauge on each Toxic Gas Monitor . . . and enter readings on Form FC-71." This failure to implement Technical Specification surveillance requirements is an apparent violation against Table 3-3, Item 29.a of the Technical Specifications which requires that " comparison of readings from redundant channels" be done on a shift basi (285/8515-03) The NRC inspector verified later that week that Form FC-71, Sheet 42 was revised on July 16, 1985, to incorporate Item 29.a of Table 3-3 of the Technical Specifications per Surveillance Test ST-TGM-1, Amendment No. 89 was issued on May 24, 1985, and incorporated new Technical Specifications that required the licensee to "!mplement and maintain a program to ensure the capability to obtain and analyze a reactor coolant sample and containment atmosphere sample under accident conditions." The specific requirements were contained in Section 5.15,
" Post-Accident Radiological Sampling and Monitoring." The NRC inspector reviewed the following documents to ensure that programs have been established to provide the post-accident sampling capability described in Section 5.15, Items 1 through 4:
. CPP 3.10, " Determination of Radioactive Particulate and Radioactive Iodine in Air Samples
. OI-PAP-11, " Airborne Radioiodine Monitoring System Procedure for ,
Post-Accident Monitoring of Radiciodine in the Control Room"
. CMP 2.6, " Gaseous Effluent Monitoring"
. OI-PAP-7, " Procedure for Monitoring the Gaseous Effluent Releases Via the Auxiliary Building Ventilation Duct Pathway"
. OI-SL-2, " Post-Accident Sampling System (PASS)"
'
- - , - ,- -- -- , , - -- - .. . .- - - . . , - - -
. .- . - .
O
!
-12-
. CP-LAB-19, " Canberra Jupiter Ge-Li System" The NRC inspector interviewed the Supervisor, Station Training and reviewed the training records pertaining to operation of the PASS to verify that each shift chemist was qualified to draw a sample under post-accident condition In conjunction with a request from the Region IV office, the NRC inspector observed the licensee operate the PASS. Prior to this demonstration, the
licensee indicated that the post-accident samples specified in NUREG 0737,Section II.B.3 are not to be drawn concurrently and that the normal mode
,
rather than accident mode would be used to draw the samples so that the recirculation would return'to the Volume Control Tank rather than the Reactor Coolant Drain Tan . The liquid isotopic analysis was performed in accordance with ,
01-SL-2, Step V.D.2. It took'approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 10 minutes to draw the sample and analyze it. Another 10 minutes would be needed during an accident condition to dilute the sample, which was not done during this demonstration. When questioned by the.NRC inspector regarding the failure of sample values, the licensee indicated that I&C personnel would be called in and about I hour would be allowed for this corrective maintenanc . The containment grab sample was obtained in accordance with OI-SL-2, Step V.F (grab sample) because the Ge-Li detector was inoperable at ;
the time. The NRC inspector observed the PASS automatic sequence, went with the technician to the AI-100 area to observe him pull the flask, and observed the counting of the sample. It took approximately 40 minutes to obtain the sample and 10 minutes for counting. An additional 10 to 15 minutes were needed to print the l results but this did not interfere with operation of the PASS.
'
. The dissolved gas sample was obtained in accordance with OI-SL-2, Step V.B and Table I (Form FC-398). The sample was obtained in about i 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and the calculation on FC-398 was performed in about 15 -
, ' minutes.
!
1 . The same sample obtained for dissolved gas was used to determine boron concentration. The sample was injected into the ionchromatograph and repairs had to be performed on the pump before results could be obtained. Total sample and analyses time was .
epproximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 40 minutes. The NRC inspector reviewed the graphical results which showed reactor coolant boron at 174 ppm when the actual plant sample that day was 204 pp No other violations or deviations were identified.
- Followup of IE Bulletins t
l IE Bulletin 84-03, " Refueling Cavity Water Seal." The licensee responded t l to the NRC in Letter LIC-84-408 dated November 27, 1984, and provided an
!
I l
_ . ,- , _ _ _ . . . _ _ . _
_ __. . _ , . . . _ _ _ _ , _ _ _ _ _ _ , - .
- -
.
-13-evaluation of the potential for, and the consequences of, a refueling cavity water seal failure. The reactor cavity water seal at the Fort Calhoun Station is significantly different from the one that faile It utilizes silicon rubber gasket rings in four concentric grooves, compressed by a stainless steel ring bolted into place to form the seal rather than an inflatable pneumatic sea The NRC inspector reviewed the OPPD response and the analysis done in response to IE Information Notice 84-93, " Potential for Loss of Water From the Refueling Cavity," and INPO Significant Operating Experience-Report (SOER) 85-1, " Reactor Cavity Seal Failure." The Fort Calhoun Station's refueling cavity seal is not susceptible to the catastrophic failure experienced at Haddam Neck because of the bolted down stainless steel ring and the two compressed gasket rings at each pressure boundary. These gasket rings are replaced after every use, and the failure of a gasket ring would restrict leakage below the capacity of the sump pumps. Alarms are provided to indicate a reduction of the water level of the refueling cavity and spent fuel poo These alarms, coupled with visual surveillance of the spent fuel pool and refueling cavity levels, and the monitoring of sump levels and sump punp operation provide prompt indication of a problem with the refueling cavity sea Based on this review, it appears that the licensee's response to this bulletin is adequat S. Exit Interview The NRC inspector met with the Plant Manager on July 30 and September 4,1985, to summarize the scope and findings of the inspection.
I L_