ML20147D550

From kanterella
Revision as of 06:39, 25 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-285/88-06 on 880111-15.No Violations or Deviations Noted
ML20147D550
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/01/1988
From: Callan L
Office of Nuclear Reactor Regulation
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20147D555 List:
References
NUDOCS 8803040048
Download: ML20147D550 (2)


See also: IR 05000285/1988006

Text

_

.

..

o

'

c ;,

M IlE

. _

,-

In' Reply Refer To:

Docket: 50-285/88-06

~

.

Omaha Public Power District

ATTN: R. L. Andrews, Division Manager-

.

. Nuclear Production

1623 Harney Street- '

'

Omaha, Nebraska -68102

Gentlemen:

This refers to the inspection conducted by Messrs. I. Barnes, L. E. Ellershaw,-

and R. G. Taylor of this office during the period January 11-15, 1988, of

activities authorized by NRC Operating License ORP-40 for the Fort Calhoun

Station, and to.the discussion of our findings with Messrs. W. G. Gates and

L. Kusek and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included review of your quality assurance

program including implementation with respect to control of records and

documents, procurement controls, and receiving inspection of materials and

components. A review was .also performed of inservice inspection data and

records. . Within these areas, the inspection consisted of selective ex. amination

of procedures and representative records, interviews with personnel, and

observations by the NRC inspectors. The inspection findings are documented in

the enclosed inspection report.

Within the scope of the inspection, no violations'or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Ddginal Signed By'

p A. B. Ecach ,

L. J.~CaTTin,' Director

Division of Reactor Projects

Enclosure: (see next page)

/

'

RIV:R.. RI?- : C:MQP DRP/B 0:0 P

(EEllh Waw:de RG ay or 18arnes # m J>Lii oan TWesterman LJCallan

& /c%/88 f/ft/88 fiU /8 /LJ1 /88  ?/24/88 zll8/88

Reconcukr

IBarne

3-/20/88

f

8803040048 880301 g

(

"DR ADOCK 0500028S .

G PDR

- , , .

,

,

+ m,-

'0maha Public Power District -2-

.,r

' Enclosure: >-. ,

' Appendix - NRC Inspection Report '

, -50-285/88-06

, 7

~

s

ccw/ enclosure:' , ,

Fort Calhoun Station ~ s

ATTN: W. G. Gates, Manager

..

~ P.O. Box 399 -

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae '

1333 New' Hampshire Avenue, NW- .

Washington, D. C. '20036 i

Kansas Radiation Control Program Director ,

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

R.D. Martin, RA. *RPSB-DRSS

  • Section Chief (DRP/B) * MIS System
  • RIV File *DRP
  • RSTS Operator * Project Engineer, DRP/B

Lisa Shea, RM/ALF *T. Bournia, NRR Project Manager

  • R. Hall' *DRS
  • TSS *RRI

D. Powers *R. E. E11ershaw

  • R. G. Taylor *I. Barnes
  • T. Westerman
  • w/766

l