Forwards Amend 24 to License DPR-61.Amend Revises Tech Specs Re Fire Protection Requirements.Safety Evaluation Supporting Tech Specs Issued w/771125 Ltr
ML20135G630
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/06/1978
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Switzer D
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20135G608 List:
References
NUDOCS 8509190606
Download: ML20135G630 (3)


Text

-

_ / c, UNIT E D STATES

}  !

i

.I NUCLEAR FEGULATORY COMMtsslON o III  ! WA5mNGTON D. C. 20555 N, ...../ February 6,1978 Docket No. 50-213 Connecticut Yankee Atomic Power Company NOTED FD 12 2N D. C.S.

ATTH: Mr. Donald C. Switzer President Post' Office Box 270 Hartford, Connecticut 06101 Gentlemen :

The Commission has issued the enclosed Amendmently 24 to Facility License No. DPR-61 for the Haddam Neck ETant. This amendment implements the proposed Technical Specifications for fire protection forwarded by our letter dated November 25, 1977, and incorporates comments supplied in your letter of December 15, 1977.

  • The amendment incorporates changes to the Technical Specifications in Appendix A to DPR-61 to provide requirements for fire protection.

These changes ~to the Haddam Neck Technical Specifications are

'./

supported by the Safety Evaluation issued with our letter of November 25, 1977, except for those changes which were-proposed by your letter of December 15, 1977, and other minor changes. All changes to our proposed technical specifications of November 25, 1977, are discussed he re in .

. 1. In order to achieve expeditious implementation of the fire C

protection Technical Specifications, Specification 6.2.2.f is being issued at this time witn the minimum number of on-site fire brigade members spe*Jified as three (3) as you proposed. Inis numoer is less than the minitur nu mer of five (5) given in the generic staff position, Minitur Fire 5ricade Shift Size, wnich was an attachment to tne Safety Evaluation Report issuet witn our le::er to you dated Novem:er 25, 1977.

However, we are presently eval'uatinc your justification for tnis smaller brigade size anc when our evaluation is comolete the minimum number will be increased if we do not agree with your position.

2.

5;scifica:icn 3.22. A.3.b has been mcdified to allow six (6) hours to achieve hc: Standby rather than one (1) nour.

Tne total time to Cold Shutdown remains thirty (30) hours. This modification arovides additional time to reduce power to achieve Hot Standby in an orderly manner, yet the time to achieve Cold Shutdown remains unchanged.

l n'

8509190606 850906 PDR ADOCK 05000213 P PDR

/

l l

L _

r O

) Connecticut Yankee Atomic Power Company February 6,1978 Because this change results in an orderly shutdown in accordance with plant operating procedures without extending the time to reach Cold Shutdown, we find this change acceptable.

3. Your December 15,1977 letter proposed to incorporate provision for a temporary fire barrier in Specification 3.22.E.2. as an

- alternative to establishing a continuous fire watch. However, we have modified our position to require a fire watch patrol at one (1) hour intervals if the area is also protected by operable fire detectors. We continue to require a continuous fire watch

^

for areas with inoperable penetration fire barriers and no operable fire detectors. Following concurrence of your staff we have incorporated our modified position into Specification 3.22.E.2.

4. Specification 4.15.E is being issued as proposed in your December 15, 1977 letter to clarify our position that surveillance

be performed each 18 months or following maintenance. Maintenance on a single fire barrier requires only that barrier to be inspected - not all barriers. Your proposal is considered to be a clarification and not a change in requirements and is therefore acceptable on that basis.

= 5. S~pecification 6.4.2 concerning fire brigade training requires that the training program meet or exceed the intent of f1FPA Code-1976.

Section 27. This imposes a requirement that training be conducted monthly. However, our letter of August 19, 1977, forwarded a copy of "fiuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance", which indicated

'c that fire brigace training (drills) shall be conducted at least each three (3) months. We have therefore modified this specification to recuire training (drills) at quarterly intervals. .

A c:oy of the Federal Register fi:tice of this license ament. en: is alsc enclosec.

Sincerely

) i d Qk w M 4: -.

A. Schwencer, Chief Operating Reactors Eranch 71 Division of 0;erating Rea: tors -

Enclosures :

1. Amendment tio. 24 to OPR-61
2. fictice

, cc w/ encl:

} See next page

. Connecticut Yankee Atomic Power Company February 6,1978

.-)

cc: Day, Berry A Howard Counselors at-Law One Constitution Plaza Hartford, Connecticut 06103 Russell Library 119 Broad Street Middletown, Connecticut 16457 >

-Board of Selectmen Town Hall Haddam, Connecticut 06103 Mr. Robert W. Bishop, Assistant Director Research and Policy Development Department of Planning and Energy Policy Connecticut Energy Agency 20 Grand Street Hartford , Connecticut 06106

-g Superintendent

"/ Haddam Neck Plant RFD #1 Post Office Box 127E East Hampton, Connecticut 06424 Chief, Energy Systems Analyses Branch (AW-459)

-~ s- Office of Radiation Programs U.S. Environmental Protection Agency Rec = 645, East Tower 431 M Street, SW Washington, D.C. 23 50 U.S. Environmental Prc;ection Agency ,

Region I Office ATTN: EIS COORDINATOR JFK Federal Building ,

Boston, Massachusetts 02203 i

r b

J' l

- - -