ML20135G613
| ML20135G613 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 12/01/1976 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Switzer D CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20135G608 | List:
|
| References | |
| NUDOCS 8509190562 | |
| Download: ML20135G613 (3) | |
Text
_
O&L 2rca A.5,
... am
~.
J NUCLEAR RE LAT HY COtiMisSION j.. (..[ lj wasmcros. o. c. iosss
\\ Wh/
.E, "A L7T'q December 1, 1976 37O3
/
W36K6Si) 3 g
Docket No. 50-213 DEC 9 1976 oi ECElVocv s ws Connecticut Yankee Atomic Power Company N. YANKEE ATOMIC POWER ATTH: Mr. Donald C. Switzer CgNN. YANKEE ATOMIC POWER CO.
President Post Office Dox 270 Hartford, Connecticut 06101 tih R0.U Gentlemen:
RE: HADDAM NECK PLANT By letter dated September 30, 1976, we requested that you submit proposed Technical. Specifications on fire protection for Haddam Neck Plant.
The enclosed sample Technical Specifications are intended to provide guidance in the scope and types of such specifications.
The enclosure g
uses the Standard Technical Specification format and may require seine adaptation to conform with the femat of your Technical Specifications.
Blanks or' parentheses appear wcere the infomation is plant specific.
These sample Technical Specifications are not intended to alter the j
WRC positions given in Appendix A to Branch Technical Position 9.5-1 which has been previously sent to you. The essential part of this guidance is to indicate the scope of material to be included in the Technical Specifications for your facility in the areas of equipment and administra-tive requirements, and the actions that we would find appropriate if a limiting condition for operation could not be met.
We are also enclosing an Errata Sheet for Aopendix A to Branch Technical j
Position APCSB 9.5-1, " Guidance for Fire Protection for Nuclear Power Plants."
D w
Sincerely, t/ V Nw c-8509190562 850906
,g A. Schwencer, Chief
~
ADOCK O 3
Operating Reactors Branch #1
%DR Division of Operating Reactors
Enclosure:
1 1.
Sample Technical Specifications NOTED 2.
Errata Sheet i
DEC 71976 cc w/ enclosures:
See next page J. M. KUFE!.
12-6-76 Copies of accached to Hessrs. W. F. Fee, W. A. Crecen,
~
R. A. Evans, V. E. Pocppelmeie
Connecticut Yankee Atomic Power Company 2-Occember 1.1976 cc: Day, Berry & Howard Counselors at Law One Constitution Plaza Hartford, Connecticut 06103 i
Russell Library 119 Broad Street Middletown, Connecticut 16457 I
~
~
l I
e E
g 5
i
[
l E
4 5
P b
l 5
e4 F
9
'e I
i
,m NhED TECH't! cat SPEC!f1CATIO!. ADDITIONS TO ADMIN!S1RATIVE CONTROLS SECTION FOR FIRE PROTECTION The following additions should be made to the Administrative Controls Section of facility technical specifications to complement the Fire Protection Program.
1.
Add a requirement to the Facility Staff specification as follows:
A Fire Brigade of members shall be maintained on site at all times. This excludes members of the minimum shift crew necessary for safe shutcown and any personnel required for other essential functions during a fire emergency.
2.
Add provisions to include the organizational arrangement for performance and monitoring of the Fire Protection Program to.the appropriate organization charts and specifications.
I'
~
3.
Add a new section tddhe training requirements as follows:
A training program for the Fire Brigade shall be maintained under the direction of the (Fire Protection Program Manager) and shall meet or exceed the requirements of Section 27 of the NFPA Code-1976.
Add to those items ' listed for audit by the Company Nuclear Review and Audit Group (Corporate or Off-Site Comm.) the following:
The Facility Fire Protection Program and implementing procedures at least once per 24 months.
i 5.
Add to those items listed as requiring wr.itten procedures the following:
Fire Protection Program implementation.
6.
Add a section as follows:
~
Fire Protection Insoection 1.
An independent fire protection and loss prevention inspection and audit shall be perforr.ed annually utilizing either qualified off-site licensee personnel or an outside fire protection firm.
1 2.
An inspection and audit by an outside qualified fire consultant shall be perfomed at intervals no greater than 3 years.
s, e
- +%
p
~ :y ::i k {: p u.
c>
- 2. v t <.: '-
- ;.= _-
.