ML20135H736

From kanterella
Revision as of 18:05, 19 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-285/85-16 on 850722-26.No Violations or Deviations Noted
ML20135H736
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/19/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20135H737 List:
References
NUDOCS 8509240179
Download: ML20135H736 (2)


See also: IR 05000285/1985016

Text

- . - .. . . . . --. .- _ - _-

'

' '

SEP 191985

In Reply Refer To:

Docket: 50-285/85-16

'

Omaha Public Power District

'.

ATTN: R. L. Andrews, Division Maaager-

Nuclear Production

'

1623 Harney Street

Omaha, Nebraska - 68102- ,

.

, Gentlemen:

l This refers to the inspection conducted by Mr. N. M. Terc of this office and

other accompanying personnel during the period July 22-26, 1985, of activities

authorized by NRC Operating License DPR-40 for Fort Calhoun Station, and to the

discussion of our findings with Mr. E. Pape, and other members of your staff at

the conclusion of the inspection.

} Areas examined during the inspection included the implementation of the emer-

, gency plan and procedures during the annual exercise. Within these areas, the

i inspection consisted of selective examination of procedures and representative

records, interviews with peasonnel, and observations by the inspectors. These

4

findings are documented in the enclosed inspection report.

3 The enclosed report identified deficiencies in your emergency preparedness

program observed during the emergency. exercise. It is requested that you

provide this office with a schedule for correcting these deficiencies within

30 days after receipt of this letter.

Within the scope of the inspection, no violations or deviations were

'

identified.

The response directed by this letter is not subject to the clearance

procedures of the Office'of Management and Budget as required by the Paperwork

Reduction Act of 1980 PL 96-511.

4

/ AC: EP& C: R&SPB C:RPS$ C:RPB

ITerc;ap -JB8aird REHall- LEMartin EHJohnson

9 h* /85 - *1/P/85 0 f//2185 f/()/85

/z\ /85

8509240179 850919 g,616

PDR ADOCK 05000205 y )

G PM , g

,.

w.s y n .,v-m .,, ,wa ,, - , - , - - ,~-#no , - ,w,,.

, ']

-4 ,

. . .

Omaha Public Power District -2-

Should.you have any questions concerning this inspectic ), we will be pleased

to discuss them with you.

'

Sincerely,

Original S!cned By

IL H. Johnson

E. H. Johnson, Chief

Reactor Projects Branch'

Enclosura:

. Appendix - NRC Inspection Report

50-285/85-16

cc w/ enclosure:

- W. G. Gates, Manager

- Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE35)

'

bec distrib. by RIV:

~

_ .

'

, *RPB- * Resident Inspector -

R. D. Martin, RA

  • R&SPB *Section Chief-(RP8/B) * MIS System

- *RIV, File R. Denise, DRSP *RSTS Operator

  • J.:Baird R. Bangart,-DRSS- *N. Terc

. *w/766

'

.

_

<

)

>

'

l s

u < -

A ' #

D

"

.

"

'

i ,

+

kw- + ,- .- --yp- , ,-- w--g- y-- .y -

--%e-p , --

p y