Telecopy AO 75-58:on 750821,setpoint of One Torus to Reactor Bldg Vacuum Breaker Exceeded Prescribed Limit.Cause Under Investigation.Operation of Differential Pressure Indicating Switch Being Checked & Will Be Corrected
ML20086G002
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/22/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086G000 List:
References
AO-75-58, NUDOCS 8401090781
Download: ML20086G002 (1)


Text

r '

r

~~

s v ,

PHILADEo'PHIA ELECTRIC COMPANY!

Pe6ch Botto: Ato:ic Power Gtation Delta, Pennuylvania 1731k s August 22, 1975 Mr. Jones P. O 'B r illy , Director Office of Inspection ar.d Enforcecent Region 1

- - -([ -

t_

United States Nuclear Regulatory Coccission gfpe a -'*

gAk 631 Park Avenue ~'

King Of Pruscia, Penacylvania 19h06

Subject:

Abnor=al Occurrenec 2h-Hour Notification Confircing V. T. Ullrich's phone convernation with Mr. Valt Bnunnek, nvcio a__i J.ir.1; e e .. ;. u ; e c,

- p e - t_r. c Lh L g]5'."r.i J. . .;; 5ki.~5h_WE'.WW

--- Re f e renc e : -Li cense-Eumber- DPR !.L - --

Technical Gpecification

Reference:

4.T.A.3.a Report No.: 50-277-75-58

. Report Date: August 22, 1975 Occurrence Date:- August 21, 1975 Facility:

Peach Bottoc Ato=le Power Station R.D. 1, Delta. Pennsylvania

. 17314 Identification of Occurrence:

Torus to Reactor Building Vacunn Breaker - setpoint shift.

Conditions Prior to Occurrence Unit 2 operating at 905 power.

Description of Occurrence: .

' During the performance of a routine surveillance test, it was noted.

that the setpoint of one of the torus to reactor building vacuus breakers exceeded its prescribed limit of 0.5 paid by 0.02 paid.

Designation of Apparent Cause of Occurrence: .

Under investigation.

Analysis of Occurrence:

The safety inplications of this occurrence are minimal since the observed for arnegative setpoint shift was pressure of 2.00.02 paid. paid and the torus is designed In addition, the other vacuun breaker tested satisfactorily. .

Corrective Action:

Operation of the DPIS is being checked and vill be corrected.

Failure Data:

None previous.

Very truly yours, , , ,

/ , . /c ,% 4 W. T. Ullrich, Superintendent -

Peach Bottoc Atomic Fover Gtation

, ces '

. 9401090781 750829 PDR ADOCK 05000277 .

S PDR e

S e