ML20086J030

From kanterella
Revision as of 09:02, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Telecopy AO 75-22:on 750321,source Range Monitor Channel C Failed.Caused by Blown Fuse in Power Supply to Drawer.Fuse Replaced & Channel Returned to Svc
ML20086J030
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/24/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086J021 List:
References
AO-75-21, NUDOCS 8401230050
Download: ML20086J030 (1)


Text

_ - _ _ _ _ _ _

PHILADELPIIIA ELECTRIC COMPA!."' 'f ,

adh 14tece Atonic Fouer Stn a j Dolta, Pennsylvania 17314 March 24, 1975 J

Hr. Janco P. O'Reilly, Director Offica of Inspection and Enforcement ,# (.4 4 , #

bg

  • N n States !!ucicar Regulatory Co-Msofon 631 Park Avenua 19405 q( ' h j;

King of Prunnia, Pennsylvania

- Subfect: Abnorn s1 Occurrenen 24-Hour tiotifiestion

Confinning J. F. Franz' phone canveenstion with Dr. CharJew Calina, $

Ret; ion 1 United Staten 1:ucluex Regulatory corariasion on twch 21, 1975.

Refercucc: Licotuto !Tumber DPR-44 C unt i 11- Sprt ." . m iou Resuscace.

Idulu .h-2.6 Report !!o.s !A. - 17'-75-22 Report Date: March 24, 1975 Occurrenen Dato: Ifarch 21, 1975 Peach Dotton Atomic Power Section .. .

Facility:

R.D. 1, Delta, Pennsylvania 17314 Idantification of Occurrenco:

Failure of SMI Channel C.

Conditions Prior to Occurrence:

Unit 2 at full pownr. .

Deceription of Occurrence:

The "C" SD1 was discovered to be failing downscale during a nor=s1 ocan of control roon instru=ents.

~

Designation of Apparent Cauan of Occurrence:

Blown fuco in povar cupply to drcver.

Annlynto of Occurrence:

Because tha rod block function frca the $31's is bypnosed in the RIM mode, there are no safety icylications ssuociated with this fciluro.

Correctiva Action:

Pre 11ninary innstication rc*ealed no obvious reason for the fuse to blev. The fus vna replaced to return the channel to carvice. Investigation concicua:s.

Failure Data:

!!one provices. 8401230050 750331 PDR ADOCK 05000277 S PDR Very truly yours.

[MjbS[

U. T. Ullrich, Cupctintcclant Peach Ecttosa Atomic Pow.er Station 1

l l .