ML20086L134

From kanterella
Revision as of 05:10, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Telecopy AO 73-26:on 731205,level Switch 231D Failed to Trip Until 37 Minutes Following Trip of Other Switches.Cause Unknown.Investigation Continuing
ML20086L134
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/05/1973
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086L132 List:
References
AO-73-26, NUDOCS 8402070409
Download: ML20086L134 (2)


Text

I

^'

  • Peach Itttom Atocic Power $tation R

+

s Delta, Penncylvania 173141 O.

g, / ,3 ? 6-

g. , g. 4. b.;f Dece=ter 3, 1973 e,1f r- 3 3 7- //50 Mr. Jacec P. O'Reilly, Director United Statec Atocic Energy Cor iccion ,

Directorate of Regulatory Operationc 631 Park Avenue King of Prussia, Pennsylvania 19406 D.b$ect: Abnoren1 Occurrence 2!-Rour Hotification 4

Confircing telephone conversation with Mr. Tom Shedlowcky on12/5/73 Tieference: License Number DPR-%, Amend =ent Number 1, Technical Specification Table 31.1.

,' On Dececber 5, 1973, as the result of a ceram accidentally initiated by curveilitnce tecting required by the Technical Specificationo, it vac noted that level ceitch 231D failed to trip until about 37 cinutco following the trip of the other three cerac discharge volume icvel evitches. This is a repeated failure because the name cvitch han failed to operate on two

occasionc. Tnece failures were reported on 9/8/73 and 10/29/73 Failure of thic cinale cwitch would not have prevented ceram becauce the other three

! cvitches operated correctly. Until the investigation concidering thic r.ritch

failure is cocplete, the plant will not be returned to power. Tne investi6a-tion into the failure code will include testo here at the cite and converca-tions with the' vendor's representative in an attc=pt to determine the cauce f of the slow recponse. The clow response is at present aucpected to be caused i by binding within the witch nechanism.

/ <'

.. W. T. Ullrich Saprintendent Pench Bottom Atomic Power Station t

I k

B402070409 731211 ,. -

PDR ADOCK 05000277 c' i S PDR s ,- O i

% l r l q _z'

')

O O 0

MEMO ROUTE SLIP _

5 m*

  • 6*a"ha- F o' coacu"*aca- Fa' act'oa-i.,, 4tc.n ine 3 ., n.i., m Ai< u on o N ee, a d ,,,,,n. r e, ire a,,,,e. i.,ineo,- ,ie,.

10 (Name and Unit) INITIALS REMARES R0 Chief, FS&EB PHIIADELPilIA ELECTRIC COMPANY 0 (}

  • ^', PEACl! BOTTOM 2 50-277 0 c Central Mail & Files A0 73-26 Renulatory Standards (3)

TO (tf ame and unit; INATIALS REMARKS Direc.torate of The above abnormal occurrence is fotvarded for Licensing (13)

OGC OAT: information. Distribution will be made by this Regional Directors (RO, II, III, IV) office to the PDR, Local PDR, NSIC, DTIE, and TO (Name and unit) INiilALS kEMARKS State representatives.

DATE FROM (Name ar.d unita REM AR AS JT /~-

V E. J. Brunner Region I PHONI K1 DATE 8-337-1240 12/6/73 U54 OTHER $4DE FOR aDplTIOhAL RLMARKS cro : ists o . 445.e4s

. , , , . ,,4- e -

p * ~ = ~ r .~-