Monthly Operating Rept for Feb 1984.W/840314 Ltr
ML20087M645
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/29/1984
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8403300134
Download: ML20087M645 (7)


Text

.. . - -- - .- .

I I

I OPERATING DATA REPORT DOCKET NO. 50-364 j DATE 3-6-84 COMPLETED BY W.G. Hairston III TELEPHONE (205) 899'-515E OPERATING STATUS

l. Unit Name: .Tonenh M. Farlov - Unit 2 Notes
2. Reporting Period: Februarv. 1994 2652 1) Cumulative data since 4
3. Licensed Thermal Power (MWt): 7-30-81, date of
4. Nameplate Rating (Gross MWe): 860 commercial operation.
5. Design Electrical Ratmg (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 852.5
7. Maximum Dependable Capacity (Net MWe): 809.1
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe): N/A

! 10. Reasons For Restrictions.If Any: N/A This Month Yr..to-Date Curnulative

11. Hours in Reporting Period 696 1,440 22,681
12. Number Of Hours Reactor Was Critical 696.0 1,4 D . 6 19,958.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 696.0 1,3/6./ 19,677.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 -
16. Gross Thermal Energy Generated (MWH) 1,845,593 3,557,486 48,895,330
17. Gross Electrical Energy Generated (MWH) 607.908 1,164,766 16,151,642  ;
18. Net Electrical Energy Generated (MWH) 579.714 1,107,326 15,307,352
19. Unit Service Factor 100.0 95.7 8t2.8 l 20. Unit Availability Factor 100.0- 95.7 56.5
21. Unit Capacity Factor (Using MDC Net) 102.9 95.0 83.4 l
22. Unit Capacity Factor (Using DER Net) 100.5 92.8 81.4
23. Unit Forced Outage Rate 0.0 4.3 5.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t: . ;

N/A '

25. If Shut Down At End Of Report Period. Estimated Date of Startup: '

~ 26' Units In Test Status (Prior to Commercial Operation):

1 Forecast - Achiesed ' .

-i i

INITIAL CRITICALITY 5-6-81 _ ~5-8-81 :l I

INITIAL ELECTRICITY . 5-24-81 5-25-81 ;I COMMERCIAL OPERdTION 8-1-81~

I 7-30-81 ,

l

! 8403300134 8 t

PDR ADOCK 0 d R. - ., . PDR . n.,.

F/771 L

~ ~

~~; DOCKET No. 50-364 UNIT 3-6-84 DAll COMPLETED BY W.G. Hadyston II]

TELEPHONE (205) 899-5156 310NTil February. 1984 DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE Net) (MWe Net) 835 833

!. 37 2 835 832 13 832 829 3 9 4 833 g 831 3 836 21 832 839 830 6 g 837 830 7 g 8 24 829 834 833 9 -

10 832 833

26 11 832 830 27 829 837 12 3 13 829 838 9

14 834 30 is m 3g ,

16 834 ELSTRUCDONS ,

1 On this femr.:r. list the sverste d:aly unit power levelin MWe-Net for esch d:y in the reporting munth. Compute to

, the ne:re:t whule me;: wast.

! )

-(9p7) i 4

i l

UNIT SilU1 DOWNS ANII POWER RF'"'C110NS DOCKETNO. 50-364 UNIT NAhlE .T . M . Farley-Unit 2 DAIE 3-6-84 REPORT hlONill February, 1984 COhlPLETED Hy u c_ Hnirnenn, III TEl.EPilONE (205) 899-5156 "E -

c ,, re '5 ui : S NJIU }x .$ ,C 5 9yy bILCH5CP h 4., g4 Causc & Cusreclive

"- g$ $ fgg E,vcent M? (L] Atlion lo

$b N f d5 y NCP"88 8 ,

0 PICvent Recutscnce b

THERE WERE NO UNI L' SilUT )0WNS OR S IGNIFICANT Pt NER REDUCTIONS IN Tile MONTII 0F FEBRUARY.

I 2 3 4

, F: l'orted Reason; hiethod: , Exhibit G . insiructions S: Stheduled A figuipment Failure (Emplain) 1 - Alanual for Prepasation of Data lt blaintenance of Test 2 hfanual Sceaan. Entey Sheces for I.icensee C. Refueling 3. Automatic Scram. Esent Repost (I.ERI I ile INUREG-

1) Regulaimy Restilttiim 4 Other (Emplain) 0161) li Operator Tsaining A licensc Examination F Adeninistiative 5 G Opciational Lisor (linplain) Esinbii I - Same Source (9/77) ll Ot hes (E mplain)

, l Revision to the Report Submitted 2-10-84

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 3-6-84 COMPLETED BY LTm. Hairston, III TELEPHONE (?n5T Soo-5156 OPERATING STATUS J seph M. Farley - Unit 2 Notes
1. Unit Name:
2. Reporting Period: January, 1984
1) Cumulative data since
3. Licensed Thermal Power (MWt): 2652 7-30-81, date of
4. Nameplate Rating (Gross MWe): 860 commercial operation.
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 852.5
7. Maximum Dependable Capacity (Net MWe): 809.2
8. If Changes Occur in Capacity Ratings (Items Nmber 3 Through 7) Since Last Report. Give Reasons: L Items 6 and 7 changed due to annual update.
9. Power Level To Which Restricted. lf Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: M/A This Month Yr to.Date ' Cumulative i1. Hours In Reporting Period 744 744 21.985
12. Number Of Hours Reactor Was Critical 719,8 719.8 19,262.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On.Line 682.7 682.7 18,981.5
15. Unit Reserve Shutdown Hours n.O n.O n.n-
16. Gross Thermal Energy Generated (MWH) 1.~ 711.893 1.711.893 47.049.737
17. Gross Electrical Energy Generated (MWH) 556.858 556,858 15,543.734
18. Net Electrical Energy Generated (MWH) 527.612 527,612 14,727,638.
19. Unit Service Factor. 91.8 91.8 86.3
20. Unit Availability Factor 91.8 91.8 -86.3
21. Unit Capacity Factor (Using MDC Net) - 87.6' 87.6 82.8
22. Unit Capacity FactoriUsing DER Net) 85.5- 85.5 80.8
23. Unit Forced Outage Rate 8.2 8.2 5.4

-24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

N/A *~

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast .  : Achiesed INITIA L CRITICALITY 5-6-81 15 81 INITIAL ELECTRICITY 24-81 5-25-81 COMMERCIAL OPER ATION 8-1-81. 7-30  !

, (il!77 ) ;

k

~5 McAling Addroos Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

%"%"n%%*"' AlabamaPower

(!2 Sou!htin clec17:C SM*em March 14, 1984 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the February 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report. Also attached is a revised page for the January 1984 Monthly Operating Report which reflects the proper MDC (Gross) and MDC (Net) that was previously reported incorrectly.

If you have any questions, please advise.

Yours very truly, i

G L

. L. Cl y n J r. h FLCJr/KWM: sam Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies) gg Director, RII (1 copy)

t r

bc: Mr. J. M. Farley Mr. W. O. Whitt Mr. R. P. Mcdonald Mr. H. O. Thrash Mr. W. G. Hairston, III Mr. L. S. Williams Mr. T. H. Nesbit Mr. O. D. Kingsley, J r.

Mr. A. E. Hamett Mr. M. L. Stoltz Ms. S. N. Knight Mr. J. M. Elliott Mr. J. R. Crane Mr. B. E. Hunt Mr. L. B. Long

  • Mr. N. M. Horsley Ms. Sylvia Schoel Mr. J. C. Miller INP0 Records Center File: Binder Copy A-2.1
. .~? .

l 1

i JOSEPH M. FARLEY NUCIIAR PLANT I

UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS FEBRUARY, 1984 During the month of February, there were no unit shutdowns or significant j power reductions.

The following safety-related maintenance was performed in the month of.

February :

1. Performed miscellaneous maintenance on diesel generators.