ML20065N454

From kanterella
Revision as of 17:44, 30 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Responds to NRC 820827 Ltr Re Violations Noted in IE Insp Repts 50-424/82-20 & 50-425/82-20.Corrective Actions: Contractor Procedure X-18 Revised to Address Transition Between Different Wall Thicknesses
ML20065N454
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/28/1982
From: Foster D
GEORGIA POWER CO.
To: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20065N446 List:
References
GN-192, NUDOCS 8210220208
Download: ML20065N454 (2)


Text