ML20070K019

From kanterella
Revision as of 22:38, 27 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Rept:On 940630,re Inoperability of Main Steam Line Radiation Monitor 2EMF12.Work Request 94026262 Generated to Reattach 2EMF12 to Main Steamline.Work Request Completed on 940701
ML20070K019
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/18/1994
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9407260074
Download: ML20070K019 (2)


Text

, .

11 1

! , Duke 1%wer Chmpany D L Ratt Cataubu Nuclear Genera:uon Department Vice President 4800 ConcordRoad (803)Mi3:05 Othce York, SC2H45 ' (803)M134:6 Fax DUKEPOWEll July 18,1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Subject : Catawba Nuclear Station, Unit 2 Docket No. 50-414 Special Report 2 EMF 12 Inoperable Greater Than 7 Days Pursuant to Technical Specification 3.3.3.6, find attached a Special Report concerning the inoperab!11ty of the Unit 2 Main Steam Line Radiation Monitor (2 EMF 12).

Very truly yours, fs2 Lb bY w D. L. Hohn KEN /2 EMF 12.04 Attachment xc: S. D. Ebneter, Regional Administrator R. E. Martin, ONRR R. J. Freudenberger, SRI I

l l

l l

7 ou , 2 ,.

9407260074 940718 PDR ADOCK 05000414 g PDR

%.m em u., gm l

. u

l l

I SPECIAL REPORT CATAWBA NUCLEAR STATION DOCKET NO. 50-414 Main Steam Line Radiation Monitor (2 EMF 12) Inoperable The Main Steam Line Radiation Monitor (2 EMF 12) was declared inoperable on June 30, 1994, when it was found unattached to the main steamline. A problem investigation process report was initiated (PIP 2-C94-0924) to document this discrepancy and will address the cause of inoperability and any further corrective actions.

Work request 94026262 was generated to reattach 2 EMF 12 to the main steamline. This work request was completed on July 01,1994, and 2 EMF 12 was returned to operable status.

Since 2 EMF 12 was not returned operable within the following 7 days, this Special Report is required within 14 days per Catawba Technical Specifications 3.3.3.6.

l l

. . . - . ,