Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2
ML20212B471
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20212B468 List:
References
NUDOCS 9909200120
Download: ML20212B471 (6)


Text

Operating Data Report l

Docket No.

50-413

(

Date September 14.1999 l

Completed By Rocer Williams l

Telephone 704-382-5346 l

l ODerating Status

1. Unit Name:

Catawba 1

2. R: porting Period:

August 1,1999-August 31, 1999

3. Licensed Thermal Power (MWt):

3411 Notes

  • Nameplate
4. Nnneplate Rating (Gross MWe):

1305

  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe):

1145 calculated as 1450.000 l

6. Maximum Dependable Capacity (Gross MWe):

1192 MVA *.90 power

7. Maximum Dependable Capacity (Net MWe):

1129 factor per Page til, R M 20.

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

l l

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions,If any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 5831.0 124248.0
12. Number of Hours Reactor was Critical 744.0 5077.1 99287.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 5059.3 97848.1
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2532288 93746291 398004495
17. Gross Electrical Energy Generated (MWH) 897540 6046376 113781513
18. Net Electrical Energy Generated (MWH) 851706 5724402 107166769
19. Unit Service Factor 100.0 86.8 78.8
20. Unit Availability Factor 100.0 86.8 78.8
21. Unit Capacity Factor (Using MDC Net) 101.4 87.0 76.2
22. Unit Capacity Factor (Using DER Net) 100.0 85.7 75.3
23. Unit Forced Outage Rate 0.0 0.0 7.0
24. Shutdown 3cheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Startup 4
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved l

Initial Criticality Initial Electricity Commercial Operation 1

9909200120 990914 PDR ADOCK 05000413 3A - 9/14/99 R

PDR i

i

9,9

,4 9,

g 3

e u

c n

u.

e u

rr S

u

/

c p n o

e ir R

T i ta t

u l

n a n e

u v

n i tn e

a r

o P

MC o

t n

2 4 o

i tc m

A a

r e

c v

S i

/

p )n t

m i ri a Tl u

p c

x C

iaE t

d l

d o a m (r n

h u a

t n oe e a ut t

h e

MMAO s

u a

)

C 2(

1 35 9

t 9

ro 9

d p

1 es e.

S nR o t

N s

e N

t u

c n W

i g

L e u

v O

A E

D T

H h

U T

f X t

N o/

n n

H O

d R o

io o n M

S t

M h w a

n t

i T

e o e

h Md h

m I

N t

a

)

u t

x U

O 2 h r

E P

( S o

E f

e s

)

R n

in e

n s

ic a

o e

L lp

/

x s

g g

E ae a

R t

in

(

)

r n n

O i e u

v oi a

r a

)

r i r l

1 t

T aEp

(

r x

r t

r oi oE s

t (

t n a r n

a o

e i s r ir t

u o

e meh r

a pd pt r o N

9 u H OA OO 9

D 9

EFGH 1

s 4.

m 6 d

1 ia 4 d le r

l 3

e u l

1 e

i 5

e cd r

W p o e

a b 2

3 b

m 8

yF h

)n w

e e 3 T

c ia r

1

- S 4

a t

p e

4 F -

0 a

e o 0 lp t

S x

n 5CSR 7

E t

o

(

s i

OEEYE e

e tc T

i NMTBN lu r t

r r

A O

e i o s

TA DD H a

f e r

t a

e EN E P D

c K T T E e a gr t

y n n CI E L o

n int n mel a ON L E y

o D U L T a

a ip el t

r u

n u s

iaf g P

u M

o.

m e q e e n

RE MRR O

N n

)

u 1

ABCD C

S

(

I MONTHLY REFUELING INFORMATION REOUEST i

1.

Facility name:

Catawba Unit 1 2.

Scheduled next refueling shutdown: October 20(X) 3.

Scheduled restart following refueling: November 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l i

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performarice analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuelpool: 234 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ::.:

ll I

9.

Projected date oflast refueling which can be accommodated by present license capacity:

November 2009 DUKE POWER COMPANY DATE: Sentember 14.1999 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 4

l l

I f

L

r i

Operating Data Report Docket No.

50-414 Date September 14.1999 Completed By Rocer Williams Telephone 704-382-5345 Operatine Status 1 Unit Name:

Catawba 2

2. Reporting Period:

August 1,1999 - August 31, 1999 l

3. Licensed Dermal Power (MWt):

3411 Notes:

  • Nameplate
4. Nameplate Rating (Gross MWe):

1305

  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe):

1145 calculated as 1450.000

6. Maximum Dependable Capacity (Gross MWe):

1192 MVA *.90 power

7. Maximum Dependable Capacity (Net MWe):

1129 factor per Page ill, 20.

8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions,if any:

This Month YTD Cumulative 11,liours in Reporting Period 744.0 5831.0 114264.0

12. Number of flours Reactor was Critical 744.0 4896.1 92623.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 4828.4 91281.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross nermal Energy Generated (MWH) 2534172 110097376 391647311
17. Gross Electrical Energy Generated (MWH) 903279 5868269 105923975
18. Net Electrical Energy Generated (MWH) 858051 5538113 99939733
19. Unit Service Factor 100.0 82.8 79.9
20. Unit Availability Factor 100.0 82.8 79.9
21. Unit Capacity Factor (Using MDC Net) 102.2 84.1 77.4
22. Unit Capacity Factor (Using DER Net) 100.7 82.9 76.4
23. Unit Forced Outage Rate 0.0 17.2 8.2
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
35. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Unita in Test Status (Prior to Commercial Operation) i Forcast Achieved Initial Criticality Initial Electricity Commercial Operation 3A - 9/14/99

ec m

n a

e r

r c

ru S

/

c p n e

o R

ir i T a t

t u

n l

e a n v

ui t

e n n r

a o

P MC o

t n

2 4 io tc m

A ar e

c v

S it

/)pn c

i e

ri r

a r

Tl o

p c

C i x d

aE t

d o a l

m (r n

h u a

t n oe e

e a ut t h MMAO sua

)

C 2(

1 35 9

t 9

ro 9

d p

1 es e.

S nR o N

t N

s e

t u

c n W

i g

L e u

v O

A E

D T

H h

U T

f X

t N

o/

n n

H O

d R o

o o n M

i S

t M

h a

w t

n T

e o e

i T

Md h

m IN R

t

)

u t

a U

O 2 h r

Ex P

( S o

E f

es

)

R n

in ec a

n s

l i

o e

L p

s

/

x a

g g

E e

a n

(

)

R t

i e oi r n O

in u

v

)

r a a

1 i rl r

t T aE p

(

r x

r r

t oE s

oi t (

n t

n a r a

o s r ir e i u o

e meh r

ta pd pt r o N

9 uH OA OO 9

D 9

EFGH 1

4.

s m 6 d

a 4 d e 1

il r

l 3

e lu 2

e i

5 e cd W

r p o a b e

2 4

b m

8 yF h

)

r T

c in w

e e 3 1

- S a

4 a

t p

g 4

F -

0 a

e o 0 lp t

5CS R7 S

x n

E t

o

(

s OEEYE e

i t

e T c

NMTBN u r t

r ir TA A O

e l

o s

EN DD H a

f e

r i

t a

e E P D

c

~

K T T E n n y

te a gr CI E L o

n n ON L E y

o p t n melia t

D U L T a

a iuiaf g el r

s n u u P

m e q e e M

o O

N m

RE MRR

)

u 1

ABCD C

S

(

r MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

Catawba Umt 2 2.

Scheduled next refueling shutdown: March 2000 3.

Scheduled restart following refueling: April 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

f 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 684 8.

Present licensed fuel pool capacity: J411 Size of requested or planned increase: :.:

9.

Projected date of last refueling which can be accommodated by present license capacity:

May 2012 DUKE POWER COMPANY DATE: September 14.1999 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346