Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20247M0861998-05-21021 May 1998 SER Accepting 1997 Rev to Catawba UFSAR Submitted on 970925. Rev Added Analysis for Postulated Accident Involving Dropping of Sf Pool Weir Gate Onto Sf Assemblies ML20216E1771998-04-13013 April 1998 Safety Evaluation Accepting Relief Request 98-01 for Catawba Nuclear Station Units 1 & 2 from Requirements of ASME Boiler & PV Code for Second 10-year Interval Program for Inservice Testing of Pumps & Valves ML20217M4211998-04-0303 April 1998 Safety Evaluation Approving Request for Relief 97-04, non-code Repair Valves.Relief Granted Retroactively to Unit 1 & Expired Dec 1997.Relief for Unit 2 Will Expire at End of Cycle 9 Outage or Next Scheduled Outage Exceeding 30 Days ML20199A5521998-01-22022 January 1998 Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, for Cns,Units 1 & 2 ML20199A6421998-01-22022 January 1998 Safety Evaluation Accepting Proposed EALs Changes for Plant, Units 1 & 2.Concludes That Changes Consistent W/Guidance in NUMARC/NESP-007,w/variations as Identified & Accepted in Review & Meets Requirements of 10CFR50.47(b)(4) ML20198P9641998-01-15015 January 1998 SE Granting Relief Request 97-03 for Second 10-yr Interval Inservice Insp Program ML20198R9951997-10-30030 October 1997 Safety Evaluation Authorizing Request for Approval of Alternative to Exam Requirement of Reactor Vessel Shell Weld,Per 10CFR50.55a(g)(6)(ii)(A)(5) ML20198J7651997-10-15015 October 1997 Safety Evaluation Accepting 10-yr Interval Insp Program Plan Alternatives for Listed Plants Units ML20211F8801997-09-22022 September 1997 Safety Evaluation Supporting Second ten-year Interval Inservice Inspection Program Plan & Associated Requests for Relief for Catawba Nuclear Station Unit 1 ML20149K8281997-07-29029 July 1997 SER Granting Request for Exemption from Requirements of 10CFR70.24 for Units 1 & 2 ML20141E1121997-06-16016 June 1997 Safety Evaluation Approving Licensee Position That UFSAR Table 6-77 Be Revised to Identify SA-1 & SA-4 Instead of SA-3 & SA-6 as Containment Isolation Valves ML20148H2501997-06-0505 June 1997 Safety Evaluation Accepting Proposed Restructuring of Util Through Acquisition Of,& Merger W/Panenergy Corp ML20141G6701997-05-20020 May 1997 Safety Evaluation Accepting Proposed Alternative Use of TS Requirement for Code Class Snubbers ML20135B3051997-02-27027 February 1997 Safety Evaluation Granting Second 10 Yr ISI Program Plan & Associated Requests for Relief ML20134P2421997-02-20020 February 1997 Safety Evaluation Accepting TR BAW-10199P for Ref in Plants Licensing Documentation & Use in Licensing Applications ML20134L4081996-11-19019 November 1996 SER Accepting Performance of Plant Standby Nuclear Svc Water Pond ML20134G5551996-11-0707 November 1996 Safety Evaluation Accepting Proposed Application of BWU-Z CHF Correlation for Plants Mark-BW 17x17 Type Fuel ML20129E4851996-10-0101 October 1996 Safety Evaluation Recommending That Relief Request 96-02 Be Granted,Per 10CFR50.55a(g)(6)(i),per Request ML20056D9611993-07-30030 July 1993 SER Accepting Licensee 930325-0429 Submittals of Technical Info to Support Continued Operation of Facility for Remainder of Fuel Cycle 7 ML20055H9151990-07-27027 July 1990 Safety Evaluation Accepting Actions Taken to Resolve NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generators Tubes ML20248C0731989-08-0303 August 1989 Sser Accepting 880601,0909 & 890602 Changes to ATWS Mitigation Sys Actuation Circuitry for Plants ML20246L4221989-05-12012 May 1989 Safety Evaluation Supporting Revs 15 & 6 to Pump & Valve Inservice Testing Program & Relief Requests ML20150C2651988-06-28028 June 1988 Safety Evaluation Supporting Licensee Assessment to Fracture Toughness Requirements for Protection Against PTS Events,Per 10CFR50.61 ML20150C2611988-06-28028 June 1988 Safety Evaluation Supporting Licensee Assessment to Fracture Toughness Requirements for Protection Against PTS Events,Per 10CFR50.61 ML20154H2171988-05-18018 May 1988 Safety Evaluation Accepting Util 880414 Submittal Re Reload Startup Physics Test Program ML20148H1001988-01-22022 January 1988 Safety Evaluation Supporting Util 871113 Proposed Tech Spec Changes Reflecting Unit 2 Cycle 2 Refueling & Addition of Boron Dilution Mitigation Sys for Unit 2 ML20236M9631987-11-0606 November 1987 Safety Evaluation Accepting Util Proposed ATWS Mitigating Sys Actuation Circuitry for Facilities,Per 10CFR50.62(c)(1) & Pending Final Resolution of Tech Spec Issue ML20236D4451987-09-30030 September 1987 SER Re Licensee 870814 & 21 Responses Re Single Failure Potential in Nuclear Svc Water Sys.Nuclear Svc Water Sys Meets Requirements of GDC 5 & 44 Re Sharing & Provisions for Suitable Redundancy in Cooling Water Sys ML20236F5881987-07-29029 July 1987 Safety Evaluation Supporting Util 831104,841102,1231 & 851203 Responses to Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 of Generic Ltr 83-28 ML20215D2701987-06-11011 June 1987 SER Accepting Rev 13 to Unit 1 & Rev 4 to Unit 2 Pump & Valve Inservice Testing,Per Generic Ltr 83-28,Item 2.1 (Part 2) ML20214T4061987-06-0202 June 1987 Safety Evaluation Supporting Util 860424 Submittal Re Turbine Sys Maint Program for Early Detection of Cracking in Low Pressure Turbine Wheels ML20214M3361987-05-22022 May 1987 Safety Evaluation Supporting Util Rept Entitled, Rod Swap Methodology Rept for Startup Physics Testing ML20209B1511987-01-28028 January 1987 SER Supporting Util Responses to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys on-line Testing ML20207Q5851987-01-15015 January 1987 SER Re Generic Ltr 83-28,Item 2.1 (Part 2) Concerning Vendor Interface Programs for Reactor Trip Sys Components.Util Response Acceptable.Item Closed ML20207N3011987-01-0808 January 1987 Safety Evaluation on Util 830309 & 851025 Requests for Relief from 10CFR50.55a Requirements Re Pump & Valve Inservice Testing Program.Relief Granted W/Listed Exceptions ML20207P6341986-08-31031 August 1986 Safety Evaluation Accepting Util 851120 & 860324 Proposals to Eliminate Arbitrary Intermediate Pipe Breaks in Select List of High Energy Piping Sys ML20199L3941986-07-0202 July 1986 SER Providing Final Conclusions & Recommendations from Evaluation of Tdi Owners Group Program to Validate & Update Quality of Tdi Diesel Generators ML20211E4251986-06-10010 June 1986 Draft SER Re Util 850624 Response to Generic Ltr 83-28,Items 4.1,4.2.1 & 4.2.2 Re Preventive Maint Program for Reactor Trip Breakers/Maint & Trending.Position on Item 4.1 Acceptable.Position on Items 4.2.1 & 4.2.2 Unacceptable ML20207T4241985-12-30030 December 1985 SER Re SPDS Based on Documentation & 850513-15 Audit.Spds Does Not Fully Meet Requirements of Suppl 1 to NUREG-0737. Five Listed Variables Should Be Added to Spds.Interim Implementation Acceptable ML20138M9011985-12-17017 December 1985 Draft SER on Util 850329 Response to 841003 Request for Addl Info Re Hydrogen Control Measures for Plant.Addl Info & Analyses Required Re Effect of Upper Compartment Burns on Air Return Fan ML20128F9921985-06-21021 June 1985 SER Based on Util 831104 Response to Generic Ltr 83-28,Item 1.1 Re post-trip Review Program Description & Procedures. Program & Procedures Acceptable 1999-08-20
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
~ _ _ ._ _. . -
~
p pa atg\ UNITED STATES g j NUCLEAR REGULATORY COMMISSION o $ WASHINGTON, D.c. *amma anni
- 1 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 1 OF THE SECOND 10-YEAR INTERVAL INSERV!CE INSPECTION PLAN BEOUEST FOR RELIEF NO. 98-03 !
DUKE ENERGY CORPORATION CATAWBA NUCLEAR STATION. UNITS 1 AND 2 l 1
DOCKET NOS. 50-413 AND 50-414
1.0 INTRODUCTION
Title 10 of the Code of Federal Reculations (10 CFR), Section 50.55a, requires that inservice I testing (IST) of certain American Society of Mechanical Engineers (ASME) Code Class 1,2,
, and 3 pumps and valves be performed in accordance with the ASME Boiler and Pressure Vessel Code (ASME Code)Section XI, and applicable addenda, except where relief has been requested and granted, or proposed alternatives have been authorized by the Commission, pursuant to 10 CFR 50.55a(f)(6)(i), Section (a)(3)(i), or Section (a)(3)(ii). In order to obtain authorization or relief, Duke Energy Corporation (the licensee) must demonstrate that: (1) conformance is impractical for its facility; (2) 'he proposed alternative provides an acceptable level of quality and safety; or (3) compliance would result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety. NRC guidance contained in Generic Letter (GL) 89-04," Guidance on Developing Acceptable Inservice Testing Programs,"
provides alternatives to the Code in Positions 1,2,6,7,9, and 10, provided the licensee follows l the guidance delineated in the applicable position. When an alternative is proposed, which is in l accordance with GL 89-04 guidance and is documented in the IST program, no further l evaluation is required; however, implementation of the ahrmative is subject to NRC inspection. l By letter dated September 14,1998, the licensee subrn . J Relief Request 98-03 for Catawba Nuclear Station, Units 1 and 2, second 10-year interval program for IST of pumps and valves.
The second 10-year interval began on December 29,1995, and will end on December 28, 2005. The IST program is based on the requirements of the 1989 Edition,Section XI of the ASME Code, which by reference incorporates Operations and Maintenance (OM) Standard Part 1 (OM-1)" Requirements for Inservice Performance Testing of Nuclear Power Plant Pressure Relief Devices."
l l
9812110041 981200 Enclosure ,
ADOCK 050004 3 DR
} l 1
2.0 DISCUSSION AND EVALUATION The licensee requests relief from the testing requirements of OM-1 Paragraphs 7.3.2.2 and 8.1.3.8 for four relief valves in the diesel generator (DG) fuel oil system. Specifically, relief is requested from the requirement to conduct set pressure testing and the requirement for a minimum of two consecutive openings within the Code tolerance. The licensee proposes to verify proper functioning of the.se component subassemblies by the successful completion of monthly DG performance testing.
The licensee states:
Catawba's current method for set pressure determination for relief valves is to remove the valves and perform bench testing. Removal for testing is not a Code requirement, however this is the method Catawba relies on for setpoint determination. An alternate method is the application of " skid mounted" criteria as discussed in Section 3.4 of NUREG 1482. By this method, successful demonstration of valve function is performed each month during the diesel generator operability test.
Verification of the subject valve functions (pressure regulating and overpressure protection) as part of the diesel generator performance test will provide complete assurance of the valves' abi'ity to perform as designed. The valves will be tested under the actual conditions for which they are expected to operate; hence, their system functions can be directly verified. No adverse impact upon public health and safety will be generated from a radiological or other standpoint.
The licensee proposes (as stated):
Diesel generator fuel oil pressure will be verified monthly during the diesel generator performance test. The monthly test, conducted according to procedures PT/1&2/A/4350/02A&B, D/G Operability Test, for Units 1 and 2 and diesel generators A and B, respectively, verifies both the pressure regulating and overpressure protection functions of the subject valves. These procedures perform the monthly diesel generator run during which fuel oil recirculation header pressure is monitored.
Procedure MP/0/AR700/21, Diesel Engine Fuel Oil Back Pressure Relief Valve Corrective Maintenance, is performed after outage diesel generator maintenance to adjust the subject valves to the required 40 psig (per square inch gauge) backpressure.
The valves for which the licensee requests relief are labeled 1FD34,2FD34,1FD74, and 2FD74. They are the DG engines' return header relief valves. They perform a dual function of regulating fuel pressure to the DG engine and providing overpressure protection of the fuel oil return line from the main circulation header. Each valve is physically located above its corresponding DG fuel oil day tank. The valves are set to regulate fuel oil pressure at a maximum value of 40 psig. With the DG running, the valve relief pressure setpoint maintains a
backpressure of 40 psig on the main circulation header. The valve will lift to relieve pressure in excess of 40 psig, thereby, fulfilling both its regulation and overpressure protection functions. '
5 The Code requires that tests of these valves contain a visual examination, seat tightness determination, set pressure determination, determination of compliance with seat tightness criteria, and verification of the integrity of the balancing device on balanced valves (OM-1, ,
Paragraph 7.3.2.2). Due to the design of the valves, the only applicable requirement is set pressure determination. Paragraph 8.1.3.8 of OM-1 requires that the number of valve openings at set pressure be sufficient to demonstrate satisfactory repeatability with a minimum of two consecutive openings within Code tolerance. Instead of performing the Code-required testing, the licensee proposes to demonstrate proper functioning of these valves by the successful performance of the DG during monthly testing.
Often, valves prrured as part of larger component subassemblies are not designed to meet !
the test requirements intended for individual ASME Code Class 1,2, and 3 components. This is the case with these relief valves. Because of this, conformance with the Code-required testing method is impractical. Imposition of Code requirements would compel the licensee to redesign the diesel generator fuel oil system. This would result in an undue burden upon the 1.cansee.
i Section 3.4 of NUREG-1482 addresses the issue of skid-mounted components. The staff has determined that testing of the major component is an acceptable means for verifying the operational readiness of the skid-mounted and component subassemblies if the licensee documents this approach in the IST Program. The licensee's proposed attemative is consistent with the staff's guidance in NUREG-1482 and provides a reasonable assurance of operational I readiness. !
3.0 CONCLUSION
The requirements of OM-1 Paragraphs 7.3.2.2 and 8.1.3.8 on the subject valves are impractical as previously stated. The staff, therefore, grants the requested relief and imposes the alternative requirement pursuant to 10 CFR 50.55a(f)(6)(i). The staff determines that the relief ,
and alternative testing are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest giving due consideration to the burden on the licensee if the requirements were imposed on the facility.
Principal Contributor: M. Kotzalas Date: December 8,1998 l l
l I