MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
- - - _ . - - _ . . . -- --.
i l
. . OPIRATINGDATAIIPORT l 1 l
l- DOCIIT NO 50 413 l DATI December 15. 1998 j
OFItATING STAfDS COMPLITID BT t.A. Villinas j
. TILIPHONE 704 382 5346 l' Unit Nase: Catsuba 1 2.'ReportingPeriod:Novenber1,1998Novesber 30,1998 t
3.LicensedThersalPower(NWt): 3(11 l.Naseplatelating(GrossMVe): 1305' Notes 'Naseplate lating 5.DesignIlectricallating(NetNfe): 1145 (GrossMye)calculatedas ,
, 6.MaxinusDependableCapacity(GrossNWe): 1192 1450.000 Mn I .90 power l 7.NazisusDependableCapacity{NetNWei: 1129 factorperPage111, 8_IfChangesoccurinCapacitylatings(ItessNusber3Through7)SinceLast NURIG0020.
Retort.Glielessons:
I
- 9. Power Level to Vhich testricted, If Any (Net XVe):
10.Reasonfortestrictions,Ifany l
1 1
i i
ThisMonth fr.-to Date Cuaulative i l
11.BoursInReportingPeriod 120.0 8016.0 117673.0 12.NusberOfEcursteactorVascritical .720.0 7266.1 93466.6
- 13. Reactor leserve fiyh yn Hours 0- 0- 0-
- 14. Hours Generator G. 3 , 720.0- 7180.9 920(4.8 15.UnitReserveShutdownHours 0- 0-- ,
16.GrossThersalEnergyGenerated(MVH) 2452151 23891519 301725086 :
17.GrossIlectricalInergyGenerated(NVH) 879631 8519084 106825168 18.NetIlectricalInergyGenerated(NIH)- 835181 8039217 100517930 19.UnitServiceFactor- 100.0 89.6 78.2 20.UnitArallabilityfactor 100.0 89.6 78.2
.21. Unit Capacity factor (Using EC Net). 102.7 88.8 ,75.5
. 22.UnitCapacityFactor(UsingDItNet) 101.3 87.6 71.7
! 23.UnitforcedOutagelate 0.0 9.1 7.4 24.ShutdownScheduledoverNext6 Months (Type,-Date,andDurationofIach):
Refuelino - May 01, 1999 - 35 days
- 25. If Shut Down At End of Report Period. Istinated Date of startup: None 26.UnitsInfestStatus(PriortoConsercialOperation): forecast Achieved INIf!AL CIITICALIff INITIALILICftICITY CONNIRCIAL OPIRATION 9812240025 981215 PDR ADOCK 05000413 R PDR ,
~
, , OP!tATING DATA RIPORT DOCilf NO 50-(13 HIf catauha 1 DATI December 15,1998 COMPLITED Bf 1.1. Elllitas TILIPHONE 701 312 5346 l
NONTH Rovanher. 1998 l Dil ' AVitAGEDAILYPOWERttVIL D11 AVItAGE DAILY POVit LIVIL (NNeNet) (HeNet)
.1 1156 17 1156 2 1155 18 1160 3 1156 19 1159
( 1160 _ 20 1156-5 1162 21 1163 6 1163 22 1164 7 1163 23 1152
~
.8 1162 24 1158 9 1159 25 1163 l 10 1153 26 1162 11 1157 27 1163 12 till 28 1163 13 1162 29 1162 14 1161 30 1159 15 1159 16 1157 I l
l l
i
.]
^
UNIT SHUTDOWNS AND POWER REDUCTIONS -DOCKET NO. 413 UNIT NAME Carantsa 1 .
DATE le/13/ 3 es REPORT MONTH- ' November 1998 . COMPLETED BY x. A. williams TF'2 PHONE ( > u e ) .5 ts 2 - d.s e b (1) (2) (3) (4) (5)
R MET- -
E HOD T A OF LICENSE
'N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O ~P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
~
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)
F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulato w Restriction 4-Other (Explain) File ( M G-0161))
E-Operator Training & License Examination F-Administrative- (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) l
,_ , MONTHLY REFUFI ING INFORMATION REOUEST
- 1. Facility name: Catawba Unit 1
- 2. Scheduled next refueling shutdown: May 1999
- 3. Scheduled restart following refueling: June 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has rel: xi design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 2M
- 8. Present licensed fuel pool capacity: lill Size of requested or planned increase: =
- 9. Projected date of last refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: December 15.1998 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
8 s DOCKET: 50-413 UNIT: Catawba 1.
Date: 12/15/98 NARRATIVE
SUMMARY
MONTH: November,1998 ,
Catawba Unit I began the month of November operating at 100% full power. The unit operated at or near 100% full power for the entire month.
l Prepared by: R. A. Williams i Telephone: (704)- 382-5346
)
. . OPIAATING DATA RIP 0tf DOCIIT NO $0-(14 )
DATI Leeenhar 15. 1998 l 0 PIRATING STATUS COMPLITID BY. 1.1. Ellliaan l TILIPHONI 704-382 5346 l
- 1. M it Nase: Catsuba 2 2.ReportingPeriod:Novesber1,1998Novesber 30,1998 3.LicensedThersalPower(pt): 3411
- 4. Nastplate lating (Gross He): 1305' Notes 'Naseplate Rating
- 5. Design Electrical lating (Net H e): 1115 (GrossHe)calculatedas j
- 6. Nazists Dependable capacity (Gross He): 1192 1450.000 B A .90 power !
7, H Ilses Dependable Capacity (Net He): 1129 factorperPage111,.
- 8. If Changes occur in capacity latings (Itess haber 3 Through 7) Since Last HIIG0020.
Report. Give tensons:
- 9. Power Level to Which testricted, If Any (Net He):
- 10. tenson for Restrictions, If any:
l l
ThisMonth Tr to Date Casulative i
11.HoursInleportingPeriod 720.0 8016.0 107689.0
- 12. h aber Of Hours teactor Was Critical 720.0 6936.1 86983.1
- 13. Reactor leserve Shutdown Bours - 0~
11.BoursGeneratorOnLine 720.0 6836.8 85708.9
- 15. Unit teserie Shution Hours - 0~ 0- - 16.GrossTherealInergyGenerated(ME) 2365210 23006555 219015785 17.GrossIlectricalEnergyGenerated(HH) 851160 8227688 991387(1 18.NetIlectricalInorgyGenerated(NH) 808665 7800506 93529828 19.UnitServicefactor 100.0 85.3 79.6 20.UnitAvailabilityfactor 100.0 85.3 fl.6
- 21. Unit Capacity Factor (Using DC Net) '99.5 86.2 76.8 22.UnitCapacityFactor(UsingDEINet) 98.1 85.0 75.8 23.Unitforced'Outigelate -
0.0 2.1 7.7 24.ShutdownScheduledOverNext6 Months (Type,Date,andDuraticaofIach):
None 25.IfShutDownAtIndOfReportPeriod.IstinatedDateofStartup: Nonn 26.UnitsInfeltStatus(PriortoConsercialOperation): Forecast Achieved INITIALCRITICALiff INITIAL ILICYtICITT COMIRCIALOPIRATIDX
_ _. _ . __. _ . _ . _ _ _ . _ . ._. . ~ . _ . . _ _ . _ _ . . _ . ._. _
l l
i . , -
o l'
t
. . OPIRATIIG DATA IIP 0tf l i
!' DOCIlf NO 50 114 l HIT catasha 2
'COMPLITI I illi
?!LIPH0H 704 382 5346 1
l l
RUTH Ictenbar. 1998 l l
. D11 ' AVItAGE DAILY P0Vit LIVIL D11 AVilAGE DAILT POVit LIVIL (HeNet) (Helet) 1 1164 17 1166
! '2 1163- 18 1173 l
3 1167- 19 1170 l -1 1170 20 1166 l
5 s 1161 21 1174 6 1172 22 '1174 j
7 1173 23 1169 3
- 8 1152 24> 1167 l
s 588
'0 1 567 26 1170 '
11 988 27 1172 l
12 1171 28 1172 13 1171 29 1171 11 1169 30 . _ _ _
1167
- e l
l 16 1167
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME uua ma z .
DATE 12/id/96 REPORT MONTH November 1998 COMPLETED BY x. a. Williams TELEPHONE (yus)-362-339o (1) (2) (3) (4) (5)
R MET- -
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 5-P 98 9 F --
A --
HH INSTRU REPAIR "2A" FEEDWATER PUMP TURBINE MECHANICAL OVERSPEED TRIP FUNCTION (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee.
C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction , ,
4-Other (Explain) File (NUREG-0161)
E-Operator Training Et License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
l l .. .
MONTHLY REFUFI ING INFORM ATION REQUEST l 1. Facility name: Catawba Unit 2
- 2. Scheduled next refueling shutdown: March 2000
, 3. Scheduled restart following refueling:Arsl2000 l
1-t THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
- l. If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
l 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core
- J21 (b) in the spent fuel pool: 6M
- 8. Present licensed fuel pool capacity: 14]1 Size of requested or planned increase: =-
- 9. Projected date of last refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: December 15.1998 Name of
Contact:
R. A. Williams Phone: (704) 382-5346 a
h
~ - - - . ,
... -.. - . - - , ,- . _ ~ . . - _
. . = - . - . _ _ - _ - . - - . . = - . . . - - - .. . .
.. o' DOCKET: 50 - 414 1 1
l UNIT: Catawba 2 l Date: 12/15B8 NARRATIVE
SUMMARY
MONTH: November,1998 Catawba Unit 2 began the month of November operating at 100% full power The unit operated at or near 100% full power until 11/08/98 at 2100, when the unit began reducing power and held at 55% power from ;
11/09/98 at 0245 to 11/11/98 at 0231 to repair "2A" feedwater pump turbine mechanical overspeed trip i function. The unit returned to 100% full power on 11/11/998 at 1500, and operated at near 100% full power the remainder of the month.
Prepared by: R. A. Williams Telephone: (704)- 382-5346 l
1
!~