Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2
ML20198E315
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 11/30/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20198E313 List:
References
NUDOCS 9812240025
Download: ML20198E315 (10)


Text

- - - _ . - - _ . . . -- --.

i l

. . OPIRATINGDATAIIPORT l 1 l

l- DOCIIT NO 50 413 l DATI December 15. 1998 j

OFItATING STAfDS COMPLITID BT t.A. Villinas j

. TILIPHONE 704 382 5346 l' Unit Nase: Catsuba 1 2.'ReportingPeriod:Novenber1,1998Novesber 30,1998 t

3.LicensedThersalPower(NWt): 3(11 l.Naseplatelating(GrossMVe): 1305' Notes 'Naseplate lating 5.DesignIlectricallating(NetNfe): 1145 (GrossMye)calculatedas ,

, 6.MaxinusDependableCapacity(GrossNWe): 1192 1450.000 Mn I .90 power l 7.NazisusDependableCapacity{NetNWei: 1129 factorperPage111, 8_IfChangesoccurinCapacitylatings(ItessNusber3Through7)SinceLast NURIG0020.

Retort.Glielessons:

I

9. Power Level to Vhich testricted, If Any (Net XVe):

10.Reasonfortestrictions,Ifany l

1 1

i i

ThisMonth fr.-to Date Cuaulative i l

11.BoursInReportingPeriod 120.0 8016.0 117673.0 12.NusberOfEcursteactorVascritical .720.0 7266.1 93466.6

13. Reactor leserve fiyh yn Hours 0- 0- 0-
14. Hours Generator G. 3 , 720.0- 7180.9 920(4.8 15.UnitReserveShutdownHours 0- 0-- ,

16.GrossThersalEnergyGenerated(MVH) 2452151 23891519 301725086  :

17.GrossIlectricalInergyGenerated(NVH) 879631 8519084 106825168 18.NetIlectricalInergyGenerated(NIH)- 835181 8039217 100517930 19.UnitServiceFactor- 100.0 89.6 78.2 20.UnitArallabilityfactor 100.0 89.6 78.2

.21. Unit Capacity factor (Using EC Net). 102.7 88.8 ,75.5

. 22.UnitCapacityFactor(UsingDItNet) 101.3 87.6 71.7

! 23.UnitforcedOutagelate 0.0 9.1 7.4 24.ShutdownScheduledoverNext6 Months (Type,-Date,andDurationofIach):

Refuelino - May 01, 1999 - 35 days

25. If Shut Down At End of Report Period. Istinated Date of startup: None 26.UnitsInfestStatus(PriortoConsercialOperation): forecast Achieved INIf!AL CIITICALIff INITIALILICftICITY CONNIRCIAL OPIRATION 9812240025 981215 PDR ADOCK 05000413 R PDR ,

~

, , OP!tATING DATA RIPORT DOCilf NO 50-(13 HIf catauha 1 DATI December 15,1998 COMPLITED Bf 1.1. Elllitas TILIPHONE 701 312 5346 l

NONTH Rovanher. 1998 l Dil ' AVitAGEDAILYPOWERttVIL D11 AVItAGE DAILY POVit LIVIL (NNeNet) (HeNet)

.1 1156 17 1156 2 1155 18 1160 3 1156 19 1159

( 1160 _ 20 1156-5 1162 21 1163 6 1163 22 1164 7 1163 23 1152

~

.8 1162 24 1158 9 1159 25 1163 l 10 1153 26 1162 11 1157 27 1163 12 till 28 1163 13 1162 29 1162 14 1161 30 1159 15 1159 16 1157 I l

l l

i

.]

^

UNIT SHUTDOWNS AND POWER REDUCTIONS -DOCKET NO. 413 UNIT NAME Carantsa 1 .

DATE le/13/ 3 es REPORT MONTH- ' November 1998 . COMPLETED BY x. A. williams TF'2 PHONE ( > u e ) .5 ts 2 - d.s e b (1) (2) (3) (4) (5)

R MET- -

E HOD T A OF LICENSE

'N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O ~P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

~

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulato w Restriction 4-Other (Explain) File ( M G-0161))

E-Operator Training & License Examination F-Administrative- (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) l

,_ , MONTHLY REFUFI ING INFORMATION REOUEST

1. Facility name: Catawba Unit 1
2. Scheduled next refueling shutdown: May 1999
3. Scheduled restart following refueling: June 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has rel: xi design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 2M
8. Present licensed fuel pool capacity: lill Size of requested or planned increase: =
9. Projected date of last refueling which can be accommodated by present license capacity:

November 2009 DUKE POWER COMPANY DATE: December 15.1998 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

8 s DOCKET: 50-413 UNIT: Catawba 1.

Date: 12/15/98 NARRATIVE

SUMMARY

MONTH: November,1998 ,

Catawba Unit I began the month of November operating at 100% full power. The unit operated at or near 100% full power for the entire month.

l Prepared by: R. A. Williams i Telephone: (704)- 382-5346

)

. . OPIAATING DATA RIP 0tf DOCIIT NO $0-(14 )

DATI Leeenhar 15. 1998 l 0 PIRATING STATUS COMPLITID BY. 1.1. Ellliaan l TILIPHONI 704-382 5346 l

1. M it Nase: Catsuba 2 2.ReportingPeriod:Novesber1,1998Novesber 30,1998 3.LicensedThersalPower(pt): 3411
4. Nastplate lating (Gross He): 1305' Notes 'Naseplate Rating
5. Design Electrical lating (Net H e): 1115 (GrossHe)calculatedas j
6. Nazists Dependable capacity (Gross He): 1192 1450.000 B A .90 power  !

7, H Ilses Dependable Capacity (Net He): 1129 factorperPage111,.

8. If Changes occur in capacity latings (Itess haber 3 Through 7) Since Last HIIG0020.

Report. Give tensons:

9. Power Level to Which testricted, If Any (Net He):
10. tenson for Restrictions, If any:

l l

ThisMonth Tr to Date Casulative i

11.HoursInleportingPeriod 720.0 8016.0 107689.0

12. h aber Of Hours teactor Was Critical 720.0 6936.1 86983.1
13. Reactor leserve Shutdown Bours - 0~

11.BoursGeneratorOnLine 720.0 6836.8 85708.9

15. Unit teserie Shution Hours - 0~ 0- - 16.GrossTherealInergyGenerated(ME) 2365210 23006555 219015785 17.GrossIlectricalEnergyGenerated(HH) 851160 8227688 991387(1 18.NetIlectricalInorgyGenerated(NH) 808665 7800506 93529828 19.UnitServicefactor 100.0 85.3 79.6 20.UnitAvailabilityfactor 100.0 85.3 fl.6
21. Unit Capacity Factor (Using DC Net) '99.5 86.2 76.8 22.UnitCapacityFactor(UsingDEINet) 98.1 85.0 75.8 23.Unitforced'Outigelate -

0.0 2.1 7.7 24.ShutdownScheduledOverNext6 Months (Type,Date,andDuraticaofIach):

None 25.IfShutDownAtIndOfReportPeriod.IstinatedDateofStartup: Nonn 26.UnitsInfeltStatus(PriortoConsercialOperation): Forecast Achieved INITIALCRITICALiff INITIAL ILICYtICITT COMIRCIALOPIRATIDX

_ _. _ . __. _ . _ . _ _ _ . _ . ._. . ~ . _ . . _ _ . _ _ . . _ . ._. _

l l

i . , -

o l'

t

. . OPIRATIIG DATA IIP 0tf l i

!' DOCIlf NO 50 114 l HIT catasha 2

'COMPLITI I illi

?!LIPH0H 704 382 5346 1

l l

RUTH Ictenbar. 1998 l l

. D11 ' AVItAGE DAILY P0Vit LIVIL D11 AVilAGE DAILT POVit LIVIL (HeNet) (Helet) 1 1164 17 1166

! '2 1163- 18 1173 l

3 1167- 19 1170 l -1 1170 20 1166 l

5 s 1161 21 1174 6 1172 22 '1174 j

7 1173 23 1169 3

- 8 1152 24> 1167 l

s 588

  • 9 25 1172

'0 1 567 26 1170 '

11 988 27 1172 l

12 1171 28 1172 13 1171 29 1171 11 1169 30 . _ _ _

1167

e l

l 16 1167

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME uua ma z .

DATE 12/id/96 REPORT MONTH November 1998 COMPLETED BY x. a. Williams TELEPHONE (yus)-362-339o (1) (2) (3) (4) (5)

R MET- -

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 5-P 98 9 F --

A --

HH INSTRU REPAIR "2A" FEEDWATER PUMP TURBINE MECHANICAL OVERSPEED TRIP FUNCTION (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee.

C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161)

E-Operator Training Et License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

l l .. .

MONTHLY REFUFI ING INFORM ATION REQUEST l 1. Facility name: Catawba Unit 2

2. Scheduled next refueling shutdown: March 2000

, 3. Scheduled restart following refueling:Arsl2000 l

1-t THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
l. If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

l 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7. Number of Fuel assemblies (a) in the core
J21 (b) in the spent fuel pool: 6M
8. Present licensed fuel pool capacity: 14]1 Size of requested or planned increase: =-
9. Projected date of last refueling which can be accommodated by present license capacity:

May 2012 DUKE POWER COMPANY DATE: December 15.1998 Name of

Contact:

R. A. Williams Phone: (704) 382-5346 a

h

~ - - - . ,

... -.. - . - - , ,- . _ ~ . . - _

. . = - . - . _ _ - _ - . - - . . = - . . . - - - .. . .

.. o' DOCKET: 50 - 414 1 1

l UNIT: Catawba 2 l Date: 12/15B8 NARRATIVE

SUMMARY

MONTH: November,1998 Catawba Unit 2 began the month of November operating at 100% full power The unit operated at or near 100% full power until 11/08/98 at 2100, when the unit began reducing power and held at 55% power from  ;

11/09/98 at 0245 to 11/11/98 at 0231 to repair "2A" feedwater pump turbine mechanical overspeed trip i function. The unit returned to 100% full power on 11/11/998 at 1500, and operated at near 100% full power the remainder of the month.

Prepared by: R. A. Williams Telephone: (704)- 382-5346 l