ML20078R002

From kanterella
Jump to navigation Jump to search
Special Rept:On 941103,Channel 3 (Upper Rv a) Declared Inoperable.Caused by Channel Sensor Failure of Acceptance Criteria During Performance of PT/0/A/4600/03.Repair Planned for End of 2EOC7 Outage Due to Containment Entry Required
ML20078R002
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 12/12/1994
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9412230160
Download: ML20078R002 (1)


Text

. _ . . ._ ..

11 l DubeibwerCompany D. L Wus

Catawba Nuclear Genemtion Department Vice President i 4800 ConconiRoad (803)&1132050flice ,

York, SC29745 (803)&113426 Fax DUKEPOWER December 12,1994  ;

U. S. Nuclear Regulatory Commission ATTN. Document Control Desk Washington, DC 20555 l

Subject:

Catawba Nuclear Station, Unit 2 1 Docket No. 50-414 -

Special Report Vibration and Loose Parts Monitoring System )

On November 03, 1994 Channel 3 (Upper Reactor Vessel A) was declared  :

l inoperable. The channel sensor failed the acceptance criteria during the performance of PT/0/A/4600/03 (Loose Parts Monitor Spectrum Comparison). )

Problem Investigation Process (PIP) 2-C94-1546 was initiated for tracking; repair i will be completed under work order 94045448. This work order is planned for the end of 2EOC7 outage since containment entry will be required.

Since this channel has been inoperable for 30 days; it is reportable pursuant to Technical Specification 3.3.3.9. j Very truly yours, l l

D.L.Rehn 1