~OP!!Af!IG DATA RIP 017-l
'DOCIIT N0 5041)
- DATI Notester 13,1998 !
0 PIRATING StifUS COMPLIf!D If I.A. Willians f!LIPENI -704 312 53(6
.1. Unit Rase: Catauba 1 2.ReportingPeriod: October 1,1998Octcher 31,1998 3.LicensedThersalPower(NWt):. 3(11_ _
- 14. Nastplate lating (Gross NVe): ..
1305' [
NotesNaseplatelating- !
'5,' Design slectrical Rating (Net NWe): -1145 (Gross MVe) calculated n j 6.MaxinusDependablecapacity(GrcssMVe): --1192 1150.000 NVA I .90 Power l
- 7. NaIlsus Dependable Capacity (Ret NVe): 1129. factor per Page 111,
. 8. If Changes occur in capacity latings (Itess Number 3 Through 7) Since Last ERIG-0020. l Report. Give letscas: J
, '9. Power level to Vhich Restricted, If Any (Net MVt): !
10 teasca let testrictions, If any:
~
' This Month ,fr. to-Date Cuaulative ;
11, Hours In leporting Period 745.0- 7296.0 116953.0:
12.kusberofHoursteactorWascritical 7(5.0 6546.1 92716.6 '
13.'teactorReserveShutdevnHours- 0-- 14. Hours Generater on Line- 745.0 6460,9 91324.8
'15.' Unit'teserveShutdownHours - ,
16.'GrossThersalInergyGenerated(NVH) . 2534182 21439365 299212932
- 17.GrossElectricalInergyGenerated(NVH) 903443 7639450 105945834 18.NetIlectricalEnergyGenerated(NVH) 856987 7204036 99742749 p I L Unit Service facter ' 100.0 88.6 78.1
- 29.UnitAvailabilityFactor' 100.0 88.6 78.1 -
=21.'UnitCapacityfactor{Using'ECNet) 101.9 87.5 75.3 .
- 22. Unit Capacity Factor {Using DIR Net) 100.5 86.2 7(.5 !
.33. Unit'ForcedOutagelate .
0.0 10.0 7.4 l
J24.' Shutdown Scheduled Over Next 6 Ncaths (Tyle, i tate, and Duratics of Iach): ;
, Refueling - May' 01,-1999 - 35 Days
- 25. If Shut Down At End of Report Period. Istinated Date of Startup: None ;
{ 26.UnitsInfest' Status (PricttoConsercialOperation): Icrecast achi m d ,
l U
'9811190030 981113?
)
s 1m , s ~ a ~ r +s r . .a 6 s a .n. > >,m2 4 . ._. s s.m.. p i
I
~ OPERATING DATA RIPulf
+
. i.1 _; ,
v , i
.' {
DOCIIT NO 50 413 UIIT Catasha 1 :
CATI Novaaber 13,1999 COMPLITID BT t. A. Billian . i TILIPH0BI - 704 382-5346
- iNOITH octohar,1998-i 111 : AVIRAGI DAILY POVII LIVIL Gil 'AVIRAGI CAILY POWII LIVIL (MVeNet). (NVtItt) ,
1 1143 ' 17 1140 2: 1156 18 1137 l
'3 1149 19 1135
-4 1143 20 , 1145'
~'5.' 1145 21 1153
. '6,
-1146 22 1155 t .7, 1145 1152 23 s .l 1145 24 1156
'9 1156 25 1158 i
. 10. 1157' 26 1156 i 1
i 11 -- 1154 <
27 1157 i
12 1150 28 1157
' 33 1151- - 29 1155 r,Tli 1154 30 1153 15 . _ , 1154- 31 1152 161 1147 1
6
+
9 s - .,F
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME uunwua 1 DATE 11/13/3e -
REPORT MONTH October 1998 COMPLETED BY x. A. williams TELEPHONE (/us)-sez-osse (1) (2) (3) (4) (5)
R MET- '
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND COPRECTIVE O P DURATION O DOWN REPORT TEM COMPONEh"r ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction , ,
4-Other (Explain) File (NUREG-0161))
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
, , MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba Unit 1
- 2. Scheduled next refueling shutdown: May 1999
- 3. Scheduled restart following refueling: June 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will those be?
If no, has reload design and core configuration been reviewed by Safety Revi:w Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supponing information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: M (b) in the spent fuel pool: M
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: November 13.1998 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l
i i
b 4
4 l
L l
.__..- = - . .. . .. . . . . . - . ... _- ,. .. .
.l, DOCKET: 50-413 l UNIT: Catawba 1 Date: 11/13/98 i
l NARRATIVE
SUMMARY
l MONTH: October,1998 Catawba Unit I began the month of October operating at 100% full power. The unit operated at or near 100% full power for the entire month.
I
' Prepared by: R. A. Williams Telephone: (704)- 382-5346 1
1
- - . ... .. , , .. ._ ..~ - -. ~ .-. _ . . , . - .
i: ;,
e
'.(L
.CPIRATINGtATA!!P0tf l
l DOCIITNO $0-(14
- CATEReventer 1L 1998 '
0 PIRATING ffAfDS COMPLITIDIf a.1. Villians i TILIPHONI- 704 382-5346- i I
1.Unitutne:Cattsba27 -
L 2, Reporting Period: October 1,:1998 Octcher 31,1998
- 3.;LicensedthernalPower(MVt)
- L3(11 L ' t.L Nastplate lating (Grcss MWe):- .
21305' Notes 'Naseplate Rating
'5. Design Ilectrical . Rating (Xet MWe): 1115 (GressMWe)calculatedas
'6.XtzisusDependableCapacity(GrossMVe): :1192 1450.000MVAx.90 power-7.MarisusDependableCapacity(HetMWe): 1129 factorperPage111, m :0 If Changes occur 13 Capacity Ratings _ lItess N: ster 3 Thrcugh 7) 51nce Last NUl!300:0, Report. Give letscas: ;
i
' 9.- Pcuer Level 70 Vhich Restricted, If Any (Net MVel:
- 10. lessen For testricticas, If any:
l 1
. . 1 i
, ThisMenth' Tr.-toDate Cuaulttive. q
-]
. 11. Hours In teporting Period ..
'7(5.0 7296.0 106969.0 13.RusberOfHoursReactorWasCritical 286.2 6216.1 .86263.1-13.letetorReserveShutdevnEcurs i
.7 11.HoursGeneratorOnline 187.21 6116.8 '84988.9 q
!= '15.UnitReserveShutdownHours ..
'0-
-- ~0-
, 316.GrossThernal:InergyGenerated(MVH) 529296 206413(5 276650575 !
17~GrossIlectricalInergyGenerated(MVH) 183641 7376228 98287281 l t!8.RetIlectricalInergyGenerated.(MVH)~
161128 69918(1 92721163, t
- 19. Unit Service factor- 25.1 83.8 19.5 29.'UnitAvailabilityfactor 25.1 63.8 79.5 1 131. Unit Capacity Factor (Using MDC Net) 19.2 84,9 76.7 l 22.UnitCapacityIteter(UsingDIANet) 18.9 83.7 75.7 L.23.UnitForcedOutagelate' 47.2 2.7 7.7 r 'al.ShutdennScheduledOverNext6 Months (Type,Date,andDurationcfItch):
p -None-t a- "35.~If Shut Down At End of tepert Period. Istinated Date of Startup: None
~
'36.UnitsInfestStatus(PricttoCcssercialOperatica): Forecast Achieved L
i
!- IIITIAL CRITICALITY 4 INITIAL ILICftICITY -
, COMM!tCIAL 0?!!ATION s.
i
[T 4
L
s t
-OPERATING DATA IIP 017:
DOCKIf 10 - 50-(14 0517 catasha 2 CATIMoyaaber 13. 1999 ,.
COMPLIf!D BT ~ I. A. Villians
, TILIPHONI 104 382-5346
' MOITH - 'Octoberc'1998
. MI - AVERAGIDAILYP0ultLIVIL Gil AVIRAGI DAILY POVit LIVIL
.(MVtNet) (MVeNet)
- 1. '0- -11 0' 0 0 is o i
'3 :0- ,
19 0 4 ' 0 : 20 - 0 5- 0 21" 0
- 6 '0- 22 0 7; O- 23 0
, 8 -: 0 24 - 98
'9
~0 ~ 25 , 530
~10- 0 26 972
.11 ' 0 .
27 1065
< 12' 0' 28 1079
,13. 0 29 1115 14:, 0 30 1159 15 l 0 31 - 1161 15 0 t .
s
.1 S
o
UNIT SHUTDOWNS.AND' POWER' REDUCTIONS DOCKET NO.. 50-414' UNIT NAME CATAntSA 4 DATE- 11/1.5/3s REPORT MONTH October 1998 COMPLETED BY x. A. williams '
PAGE 1 OF 2 . TELEPHONE ri u s ) -3 a z - d.5 e e (1) (2) (3) (4) (5)
R MET- -
E HOD T- A OF LICENSE N Y S' SHUT EVENT SYS- 'CAUSE AND CORRECTIVE' O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 98 1 S 386.47 C --
RC FUELXX END-OF-CYCLE 09 REFUELING OUTAGE
'2 98-10-17 F 96.00 B --
HA TURBIN 4 DAY OUTAGE DELAY DUE TO MAIN TURBINE GENERATOR MAINTENANCE 3 98-10-21 F 48.00 B --
RC ZZZZZZ 2 DAY OUTAGE DELAY DUE TO ZERO POWER PHYSICS TESTING PROBLEMS 4 98-10-23 F 23.13 A --
RB CRDRVE 0.96 DAY OUTAGE DELAY DUE TO CONTROL ROD DRIVE PROBLEMS 1-P 98-10-24 S --
P --
HA TURBIN MAIN TURBINE SOAK FOR OVERSPEED.
TRIP TEST 5 98-10-24 S 4.18 B --
HA TURBIN MAIN TURBINE OVERSPEED TRIP TEST 2-P 98-10-24 F --
A --
HB xxxxxx HOLDING AT 18% POWER PENDING HEAT-UP OF MAIN FEEDWATER NOZZLES (1) (2) (3) (4) '
F Forced Reason- Method: Exhibit G ' Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual- for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161))
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) t
__._.______________.___.____._______._._______.______.________________._____________._____.m___.__ _ _ . . _ _ _ _ _ _ _ _ _.
UNIT SHUTDOWNS AND POWER REDUCTIONS ~ DOCKET NO. 414 UNIT NAME tarantsa 2 REPORT MONTH DATE 11/13/su October 1998 COMPLETED BY x. A. williams PAGE 2 OF 2 TELEPHONE (/us)-3s2-3346 (1) (2) (3) (4) (5)
R MET- '
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N RX NO. CODE CODE PREVENT RECURRENCE 3-P 98-10-24 S --
B --
IA INSTRU POWER ASCENSION TESTING 4-P 98-10-25 S. --
B --
'IA INSTRU POWER ASCENSION TESTING (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain)' 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction , ,
4-Other (Explain) File (NUREG-0161))
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) i
e MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba Unit 2
- 2. Scheduled next refueling shutdown: March 2000
- 3. Scheduled restart following refueling: April 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
If yes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee 1 regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or difTerent design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). I
- 7. Number of Fuel assemblies (a) in the core: J.93 (b) in the spent fuel pool: 684 8
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE: November 13.1998 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346
- . . -. . - . - . . ._ .~.
~
l r i
l DOCKET: 50 - 414 UNIT: Catawba 2 Date: 11/13/98 NARRATIVE
SUMMARY
MONTil: October,1998 Catawba Unit 2 began the month of October in end-of-cycle 09 refueling outage. The refueling outage spanned 48.96 days and was scheduled for 42 days. The refueling outage was delayed for the following reasons; 4 days due to main turbine generator maintenance,2 days due to zero power physics testing problems,0.96 days due to control rod drive problems. The unit was placed on-line 10/24/98 at 0136.
During power escalation, the unit held at 14% power from 0237 to 0516 for main turbine soak for overspeed trip test. The unit was taken off-line on 10/24/98 at 0546 to perform the main turbine overspeed trip test. The unit returned to service on 10/24/98 at 0957.The unit held at 18% power from 1305 to 1453 pending heat up of main feedwater nozzles. The unit resumed power escalation, and held at 30% power from 10/24/98 at 1951 to 10/25/98 at 0130 and at 75% power from 10/25/98 at 2330 to 10/26/98 at 0245 due to power ascension testing. The unit returned to 100% full power on 10/29/98 at 2039 and operated at or near 100% full power the remainder of the month.
l l
l l
l l
. Prepared by: R. A. Williams Telephene: (704)- 382-5346 r.
,