Text

,. _ . - . _ _ _ , . . . . _ . - . ~ . . --

1 l

.J V.

~OP!!Af!IG DATA RIP 017-l

'DOCIIT N0 5041)

- DATI Notester 13,1998  !

0 PIRATING StifUS COMPLIf!D If I.A. Willians f!LIPENI -704 312 53(6

.1. Unit Rase: Catauba 1 2.ReportingPeriod: October 1,1998Octcher 31,1998 3.LicensedThersalPower(NWt):. 3(11_ _

14. Nastplate lating (Gross NVe): ..

1305' [

NotesNaseplatelating-  !

'5,' Design slectrical Rating (Net NWe): -1145 (Gross MVe) calculated n j 6.MaxinusDependablecapacity(GrcssMVe): --1192 1150.000 NVA I .90 Power l

7. NaIlsus Dependable Capacity (Ret NVe): 1129. factor per Page 111,

. 8. If Changes occur in capacity latings (Itess Number 3 Through 7) Since Last ERIG-0020. l Report. Give letscas: J

, '9. Power level to Vhich Restricted, If Any (Net MVt):  !

10 teasca let testrictions, If any:

~

' This Month ,fr. to-Date Cuaulative  ;

11, Hours In leporting Period 745.0- 7296.0 116953.0:

12.kusberofHoursteactorWascritical 7(5.0 6546.1 92716.6 '

13.'teactorReserveShutdevnHours- 0-- 14. Hours Generater on Line- 745.0 6460,9 91324.8

'15.' Unit'teserveShutdownHours - ,

16.'GrossThersalInergyGenerated(NVH) . 2534182 21439365 299212932

17.GrossElectricalInergyGenerated(NVH) 903443 7639450 105945834 18.NetIlectricalEnergyGenerated(NVH) 856987 7204036 99742749 p I L Unit Service facter ' 100.0 88.6 78.1
29.UnitAvailabilityFactor' 100.0 88.6 78.1 -

=21.'UnitCapacityfactor{Using'ECNet) 101.9 87.5 75.3 .

22. Unit Capacity Factor {Using DIR Net) 100.5 86.2 7(.5  !

.33. Unit'ForcedOutagelate .

0.0 10.0 7.4 l

J24.' Shutdown Scheduled Over Next 6 Ncaths (Tyle, i tate, and Duratics of Iach):  ;

, Refueling - May' 01,-1999 - 35 Days

25. If Shut Down At End of Report Period. Istinated Date of Startup: None  ;

{ 26.UnitsInfest' Status (PricttoConsercialOperation): Icrecast achi m d ,

l U

  • INIf!AL CRITICALIff Illf!AL IIICTRICITY CONNIRCIAL 0?!!Af!0N t

'9811190030 981113?

PDR ADOCK 05000413 R PDR

)

s 1m , s ~ a ~ r +s r . .a 6 s a .n. > >,m2 4 . ._. s s.m.. p i

I

~ OPERATING DATA RIPulf

+

. i.1 _; ,

v , i

.' {

DOCIIT NO 50 413 UIIT Catasha 1  :

CATI Novaaber 13,1999 COMPLITID BT t. A. Billian . i TILIPH0BI - 704 382-5346

- iNOITH octohar,1998-i 111 : AVIRAGI DAILY POVII LIVIL Gil 'AVIRAGI CAILY POWII LIVIL (MVeNet). (NVtItt) ,

1 1143 ' 17 1140 2: 1156 18 1137 l

'3 1149 19 1135

-4 1143 20 , 1145'

~'5.' 1145 21 1153

. '6,

-1146 22 1155 t .7, 1145 1152 23 s .l 1145 24 1156

'9 1156 25 1158 i

. 10. 1157' 26 1156 i 1

i 11 -- 1154 <

27 1157 i

12 1150 28 1157

' 33 1151- - 29 1155 r,Tli 1154 30 1153 15 . _ , 1154- 31 1152 161 1147 1

6

+

9 s - .,F

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME uunwua 1 DATE 11/13/3e -

REPORT MONTH October 1998 COMPLETED BY x. A. williams TELEPHONE (/us)-sez-osse (1) (2) (3) (4) (5)

R MET- '

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND COPRECTIVE O P DURATION O DOWN REPORT TEM COMPONEh"r ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

, , MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba Unit 1
2. Scheduled next refueling shutdown: May 1999
3. Scheduled restart following refueling: June 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will those be?

If no, has reload design and core configuration been reviewed by Safety Revi:w Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supponing information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: M (b) in the spent fuel pool: M
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9. Projected date oflast refueling which can be accommodated by present license capacity:

November 2009 DUKE POWER COMPANY DATE: November 13.1998 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

i i

b 4

4 l

L l

.__..- = - . .. . .. . . . . . - . ... _- ,. .. .

.l, DOCKET: 50-413 l UNIT: Catawba 1 Date: 11/13/98 i

l NARRATIVE

SUMMARY

l MONTH: October,1998 Catawba Unit I began the month of October operating at 100% full power. The unit operated at or near 100% full power for the entire month.

I

' Prepared by: R. A. Williams Telephone: (704)- 382-5346 1

1

- - . ... .. , , .. ._ ..~ - -. ~ .-. _ . . , . - .

i:  ;,

e

'.(L

.CPIRATINGtATA!!P0tf l

l DOCIITNO $0-(14

- CATEReventer 1L 1998 '

0 PIRATING ffAfDS COMPLITIDIf a.1. Villians i TILIPHONI- 704 382-5346- i I

1.Unitutne:Cattsba27 -

L 2, Reporting Period: October 1,:1998 Octcher 31,1998

3.;LicensedthernalPower(MVt)
L3(11 L ' t.L Nastplate lating (Grcss MWe):- .

21305' Notes 'Naseplate Rating

'5. Design Ilectrical . Rating (Xet MWe): 1115 (GressMWe)calculatedas

'6.XtzisusDependableCapacity(GrossMVe): :1192 1450.000MVAx.90 power-7.MarisusDependableCapacity(HetMWe): 1129 factorperPage111, m :0 If Changes occur 13 Capacity Ratings _ lItess N: ster 3 Thrcugh 7) 51nce Last NUl!300:0, Report. Give letscas:  ;

i

' 9.- Pcuer Level 70 Vhich Restricted, If Any (Net MVel:

10. lessen For testricticas, If any:

l 1

. . 1 i

, ThisMenth' Tr.-toDate Cuaulttive. q

-]

. 11. Hours In teporting Period ..

'7(5.0 7296.0 106969.0 13.RusberOfHoursReactorWasCritical 286.2 6216.1 .86263.1-13.letetorReserveShutdevnEcurs i

.7 11.HoursGeneratorOnline 187.21 6116.8 '84988.9 q

!= '15.UnitReserveShutdownHours ..

'0-

-- ~0-

, 316.GrossThernal:InergyGenerated(MVH) 529296 206413(5 276650575  !

17~GrossIlectricalInergyGenerated(MVH) 183641 7376228 98287281 l t!8.RetIlectricalInergyGenerated.(MVH)~

161128 69918(1 92721163, t

- 19. Unit Service factor- 25.1 83.8 19.5 29.'UnitAvailabilityfactor 25.1 63.8 79.5 1 131. Unit Capacity Factor (Using MDC Net) 19.2 84,9 76.7 l 22.UnitCapacityIteter(UsingDIANet) 18.9 83.7 75.7 L.23.UnitForcedOutagelate' 47.2 2.7 7.7 r 'al.ShutdennScheduledOverNext6 Months (Type,Date,andDurationcfItch):

p -None-t a- "35.~If Shut Down At End of tepert Period. Istinated Date of Startup: None

~

'36.UnitsInfestStatus(PricttoCcssercialOperatica): Forecast Achieved L

i

!- IIITIAL CRITICALITY 4 INITIAL ILICftICITY -

, COMM!tCIAL 0?!!ATION s.

i

[T 4

L

s t

-OPERATING DATA IIP 017:

DOCKIf 10 - 50-(14 0517 catasha 2 CATIMoyaaber 13. 1999 ,.

COMPLIf!D BT ~ I. A. Villians

, TILIPHONI 104 382-5346

' MOITH - 'Octoberc'1998

. MI - AVERAGIDAILYP0ultLIVIL Gil AVIRAGI DAILY POVit LIVIL

.(MVtNet) (MVeNet)

1. '0- -11 0' 0 0 is o i

'3 :0- ,

19 0 4 ' 0  : 20 - 0 5- 0 21" 0

6 '0- 22 0 7; O- 23 0

, 8 -: 0 24 - 98

'9

~0 ~ 25 , 530

~10- 0 26 972

.11 ' 0 .

27 1065

< 12' 0' 28 1079

,13. 0 29 1115 14:, 0 30 1159 15 l 0 31 - 1161 15 0 t .

s

.1 S

o

UNIT SHUTDOWNS.AND' POWER' REDUCTIONS DOCKET NO.. 50-414' UNIT NAME CATAntSA 4 DATE- 11/1.5/3s REPORT MONTH October 1998 COMPLETED BY x. A. williams '

PAGE 1 OF 2 . TELEPHONE ri u s ) -3 a z - d.5 e e (1) (2) (3) (4) (5)

R MET- -

E HOD T- A OF LICENSE N Y S' SHUT EVENT SYS- 'CAUSE AND CORRECTIVE' O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 98 1 S 386.47 C --

RC FUELXX END-OF-CYCLE 09 REFUELING OUTAGE

'2 98-10-17 F 96.00 B --

HA TURBIN 4 DAY OUTAGE DELAY DUE TO MAIN TURBINE GENERATOR MAINTENANCE 3 98-10-21 F 48.00 B --

RC ZZZZZZ 2 DAY OUTAGE DELAY DUE TO ZERO POWER PHYSICS TESTING PROBLEMS 4 98-10-23 F 23.13 A --

RB CRDRVE 0.96 DAY OUTAGE DELAY DUE TO CONTROL ROD DRIVE PROBLEMS 1-P 98-10-24 S --

P --

HA TURBIN MAIN TURBINE SOAK FOR OVERSPEED.

TRIP TEST 5 98-10-24 S 4.18 B --

HA TURBIN MAIN TURBINE OVERSPEED TRIP TEST 2-P 98-10-24 F --

A --

HB xxxxxx HOLDING AT 18% POWER PENDING HEAT-UP OF MAIN FEEDWATER NOZZLES (1) (2) (3) (4) '

F Forced Reason- Method: Exhibit G ' Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual- for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) t

__._.______________.___.____._______._._______.______.________________._____________._____.m___.__ _ _ . . _ _ _ _ _ _ _ _ _.

UNIT SHUTDOWNS AND POWER REDUCTIONS ~ DOCKET NO. 414 UNIT NAME tarantsa 2 REPORT MONTH DATE 11/13/su October 1998 COMPLETED BY x. A. williams PAGE 2 OF 2 TELEPHONE (/us)-3s2-3346 (1) (2) (3) (4) (5)

R MET- '

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N RX NO. CODE CODE PREVENT RECURRENCE 3-P 98-10-24 S --

B --

IA INSTRU POWER ASCENSION TESTING 4-P 98-10-25 S. --

B --

'IA INSTRU POWER ASCENSION TESTING (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain)' 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent w Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) i

e MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba Unit 2
2. Scheduled next refueling shutdown: March 2000
3. Scheduled restart following refueling: April 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?

If yes, what will these be?

i If no, has reload design and core configuration been reviewed by Safety Review Committee 1 regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or difTerent design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). I
7. Number of Fuel assemblies (a) in the core: J.93 (b) in the spent fuel pool: 684 8
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

May 2012 DUKE POWER COMPANY DATE: November 13.1998 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

- . . -. . - . - . . ._ .~.

~

l r i

l DOCKET: 50 - 414 UNIT: Catawba 2 Date: 11/13/98 NARRATIVE

SUMMARY

MONTil: October,1998 Catawba Unit 2 began the month of October in end-of-cycle 09 refueling outage. The refueling outage spanned 48.96 days and was scheduled for 42 days. The refueling outage was delayed for the following reasons; 4 days due to main turbine generator maintenance,2 days due to zero power physics testing problems,0.96 days due to control rod drive problems. The unit was placed on-line 10/24/98 at 0136.

During power escalation, the unit held at 14% power from 0237 to 0516 for main turbine soak for overspeed trip test. The unit was taken off-line on 10/24/98 at 0546 to perform the main turbine overspeed trip test. The unit returned to service on 10/24/98 at 0957.The unit held at 18% power from 1305 to 1453 pending heat up of main feedwater nozzles. The unit resumed power escalation, and held at 30% power from 10/24/98 at 1951 to 10/25/98 at 0130 and at 75% power from 10/25/98 at 2330 to 10/26/98 at 0245 due to power ascension testing. The unit returned to 100% full power on 10/29/98 at 2039 and operated at or near 100% full power the remainder of the month.

l l

l l

l l

. Prepared by: R. A. Williams Telephene: (704)- 382-5346 r.

,