Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2
ML20199E307
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 12/31/1998
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20199E302 List:
References
NUDOCS 9901200379
Download: ML20199E307 (10)


Text

.

CPIIATING LATA !!P0tf l l

l DOCRIf 10 M 413 DATI January 15. 1999 j OPIRATI M STATUS COMPLITID BT R.A.Williast,., I f!LIPHORI 704 382-5346

1. Unit Nase: Catasta 1 2.ReportingPeriod: December 1,1998 December 31,1998 3 Licensed Thernal Power ( Ht): 3411
4. Raseplate lating (Gross NWe): 1305' Notes 'Haseplate Rating 5.DesignIlectricallatinglietMWe): 1H5 (GrossMVe)calculatedas
6. Marinus Dependtble capacity (Gross He): 1192 1850.000 MVA x .90 power
7. Marinus Dependable capacity (Net He): 1129 factorperPage111,
8. If Changes occur in capacity tatings (Ites Number 3 Through 7) Since last Et!G-0020.

Report. Give leasons:

i

9. Fever Level To Which testricted, If Any (Net H e):.
10. Reasen for testrictions, If any:

l ThisMonth fr.-to-Date Cusulative l l

11.HoursInReportingPerico 714.0 8760.0 118417.0 ;

12.NanberOfHoursteactorVasCritical 7H.0 8010.1 94210.6 i 13.ReacterReserveShutdownHours - --0-- - i 14.BoursGeneraterOnline 7H.0 1924.9 92788.8

15. Unit teserve Shutdown Ecurs --0-- - --0-- i 16.GrcssThersalEnergyGenerated(HH) 2533118 26421637 304258204 17.GressIlectricalEnergyGenerated(HH) 909669 9128753 107735137 18.NetElectricalInergyGenerated(HH) 86H37 8903654 101H2367 19.UnitServiceFacter 100.0 90.5 78.4 20.UnitAvailabilityfactor 100.0 90.5 78.4 21.UnitCapacityFacter(DsingMDCNet) -102.9 90.0 75.7
32. Unit capacity Facter (Using t!! Net) 101.5 88.8 H.8 23.UnitforcedOutagelate 0.0 8.3 7.3 21.ShutdcunScheduledOverNext6 Months (Type,Date,andDurationofIach):

Refueline .May 01, 1999 - 35 days 25.IfShutDevnAtEndOfReportPeriod.IstinatedDateofStartup: uno 26.UnitsInfestStatus(PricttoCcstercialOperation): Torecast Achieved INITIAL CRITICAllff INITIAL ILICitICIt!

CONNIICIAL OPIRATION 9901200379 990112 PDR ADOCK 05000413 R PDR

l i

0 PIRATING LATA !! PORT DOCIIT NO 50 413 HIf Catavha 1 DAf! Janarv 15. 1998 COMPLITEDEf R.A. tillians f!LIPH0H 7H 362-5346 N0ffH December.1998

,[11 ' AVIRAGI CAILY POVIR LIVIL Ill AVIIAGI DAILY PCHIR LIVIL (HeNet) (MVeNet) 1- 1159 17 1166 2 1162 Il 1167 3 1158 19 1164 4 1154 20 1162 5 1141 21 1157

6. 1155 22 1157 7 1154 23 1168 8 1150 24 1167 9 1158 25 1167 10 ~ 1165 26 1168 11 1164 27 1167 12 1164 28 1166 13: 1164_ 29 1165

' 11 - 1164 30 1166 15 1167 31 1167 16 1165 I

e i, , . . . . . . . .

' UNIT SHUTDOWNS AND POWER REDUCTIONS' . DOCKET NO. 50-413- ...

UNIT'NAME tarantsa 1 DATE vif13/yy REPORT MONTH December 1998 COMPLETED BY. K. a. williams TELEPHONE- ( iue ) -s ez -dJe d (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE

-O P DURATION O- DOWN REPORT TEM COMPONENT -ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE' NO ShuruOWNS OR REDUCTION S

)

(1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent WReport Sneets(LER For Licensee l C-Refueling 3-Automatic Scram Event 1 D-Regulato w Restriction 4-Other (Explain) File ( N G-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error H-Other (Explain) (Explain) Exhibit I - Same Source J

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba Unit 1
2. Scheduled next refueling shutdown: May 1999
3. Scheduled restart following refueling: June 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) far submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design nr s::p;-lier, unreviewed design or performance analysis methods, significant changes in design or new cperating procedures).
7. Number of Fuel assemblies (a) in the core: .19)

(b) in the spenifuel pool: 2M

8. Present licensed fuel pool capacity: 14.11 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

November 2009 DUKE POWER COMPANY DATE: January 15.1999 Name of

Contact:

B. A. Williams Phone: (704)-382-5346

l

?- ,

p. = ,

l-i l

DOCKET: 50-413

! UNIT: Catawba 1 i

Date: 01/15/99 u .-

  • i i

NARRATIVE

SUMMARY

MONTH: December,1998 Catawba Unit 1 began the month of December operating at 100% full power. The unit operated at or near 100% full power for the entire month.

I i

j i

1 l

l 1

i Prepared by: R. A. Williams

.. . Telephone
(704)- 382-5346 l l'

l l

l

'.! b'

1 0 PIRATING DATA RIP 017 DOCIIT NO 50 414 DATI January 15. 1999 0PIRATINGST&lEl COMPLITID Bi R.A. Willians TILIPHONI 704-382-5346

1. Unit Nase: Catauba 2 2.ReportingPeriod: December 1,'1998 December 31,1998 3.LicensedThersalPower(NWt): 3(11
4. Nastplate Rating (Gross H e): 1305 Notes 'Naseplate Rating
5. Design Ilectrical lating (Net He): 1145 (Grcss He) calculated as 6.MarinusDependableCapacity(GrossNWe): 1192 1450.000 HA I .90 power
7. Nazisus Dependable capacity (Net NVe):  !!19 facter per Page 111, 8.IfChangesOccurinCapacitytatings(ItessNumber3Through7)SinceLast NURIG0020. l Report.Glieletscus: )
9. Power Level to Which testricted, If Any (Iet He): l 10.tensonfortestricticts,Ifany:  !

this Month Tr. to Date Cuaulative 11.EcursInReportingPeried 744,0 8760.0 108133.0 32.NunterofHoursteactorWascritical 744.0 7680.1 87727.1 13.ReactorReserveShutdownEcurs --D-- 14. Hours Generator On-Line 744.0 7580.8 86(52.9

15. Unit Reserve Shutdcyn Hours - 0- 16.GrcssThernalEnerg7 Generated (KVH) 2534150 25540705 281549935 17.GrossElectricalInergyGenerated(HH) 916965 9114653 100055706 18.HetElectricalInergyGenerated(HH) 871192 8672298 94401620 19.UnitServiceFactor 100.0 86.5 79.7 80.UnitAvillabilityfactor 100.0 86.5 79.7 21.UnitCapacityfacter(UsingKDCNet) 103.8 87.7 17.0 82.UnitCapacityFactor(UsingDIRNet) 102.3 86.5 16.0 2J. Unit forced Outage late 0.0 2.2 7.6
24. Shutdown Scheduled Over Next 6 Ncnths (Type, Date, and Duration of Iach):

None 25.If$butDownAtEndofReportPeriod.EstinatedDateofStarttp: ha 26.DnitsInTestStatus(PriortoCcasercialOperatien): Forecast Achieved INITIAL CRITICALITT IIITIAL ILICTRICITT C0HIRCIALOP!!ATION

_. . - - . . _ ~.__,._m . . ____ . . _ _._ a _.

,) 3( ,

t r - V, 's: l

^ })lc -

4 3 0FIRATING DATA IIP 0tf

.: ,. .] '. _

l DOCKIf NO 50-414 i

, MIT- Catasha 2 DATI January 15. 1998- ,

, CONFLITED Bf ' I.1. Elllians L

g . .TILIPHONI 704 382 5346 o.o ,

5 L n NONTE : December 1998 .,

' HI ~ AVERAGE DAILY POWI LIVIL - -El AVERAGE CAILI POWil LIVIL >

(He-Net) (NVelet)

I 1 4 e

~1168 17 '1175 .I

' 2s '1172 18 1176 i ,-L, . 3 -1167 19 1174

.4
1169- 20 1173 p g
3 1166 21 ' 1167 i 1161 22 1167 7- -1161 23~ '1176 I 3 --, 1159 -24 1176 j 7,  ;

Y  : 9 _. 7 1168 25 . 1176-  ;

10 ' 1173 - 26 1176 - ,

I l /

117 1173 27 . 1175 l

.i .

-1174-. , , . 28 -1175

. 12.: l

-13 1173 29 1175 l 1

14: c 1174' 30 1177

-y

' 15. 1176 -31 1177 16; 1174 l.

9 4

'I

lJh

. 2 4 +, , .. _ - , , _ _

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET WO. 50-414 ..

UNIT WAME m16wun 2 DATE ul/id/yy REPCRT MONTH December 1998 COMPLETED BY x. a. williams TELEPHONE ( ius ) -d ez-das e i

(1) (2) (3) (4) (5)

R MET-E HOD T A OF LICEiTSE M Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- F*ethod: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram EntW Sneets For Licensee C-Refueling  ?-Automatic Scram (LER D-Regulatory Restriction 4-Other (Explain) Event Report (NUREG-0161))

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Error H-Other (Explain) (Explain) Exhibit I - Same Source l

MONTHLY REi:UI:I ING INFORMATION REOUEST

1. Facility name: Catawba Unit 2
2. Scheduled next refueling shutdown: March 2000
3. ' Scheduled restart following refueling: April 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendn.ent?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies . (a) in the core: 1931

'(b) in the spent fuel pool: 633

8. Present licensed fuel pool capacity: 14,11 Size of requested or planned increase: :.=
9. Projected date of last refueling which can be accommodated by present license capacity:

May 2012 '

DUKE POWER COMPANY DATE: January 15.1999 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 1

DOCKET: 50 - 414 UNIT: Catawba 2 Date: 01/15 S 9 NARRATIVE

SUMMARY

MONTH: December,1998 Catawba Unit 2 began the month of December operating at 100% fu'l power.The unit operated at or near

.100% full power for the entire month.

h Prepared byi R. A. Williams Telephone: 0 04) 382-5346 u- '

% i