Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2
ML20205P952
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 03/31/1999
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20205P950 List:
References
NUDOCS 9904210043
Download: ML20205P952 (6)


Text

'

1 Operating Data Report Docket No. 50-413 Date April 12.1999 Completed By Rocer Williams

. Telephone 704-382-5346 Operating Status

1. Unit Name: Catawba 1
2. Reporting Period: March 1,1999 - March 31,1999 i
3. Licensed 'Ihermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1145 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1192 MVA * .90 power
7. Maximum Dependable Capacity (Net MWe): 1129 factor per Page 111,
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasoas:

EG420.

i

9. Power Level To Which Restricted, if Any (Net MWe):
10. Reason for Restrictions,if any:

This Month YTD Cumulative

11. Hours in Reporting Period 744.0 2160.0 120577.0
12. Number of Hours Reactor was Critical 744.0 2160.0 96370.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 2160.0 94948.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2459954 7275415 311533619
17. Gross Electrical Energy Generated (MWH) 883825 2616352 110351489
18. Net Electrical Energy Generated (MWH) 838599 2484263 103926630
19. Unit Service Factor 100.0 100.0 78.7
20. Unit Availability Factor 100.0 100.0 78.7
21. Unit Capacity Factor (Using MDC Net) 99.8 101.9 76.1
22. Unit Capacity Factor (Using DER Net) 98.4 100.4 75.3
23. Unit Forced Outage Rate 0.0 0.0 7.2
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)

\

l l

l

25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation)

Forcast Achieved Initial Criticality Initial Electricity l Commercial Operation l

~

9904210043 990413 3 A - 44 U99 PDR ADOCK 05000413 R PDR ,

1 9 f 9

/

o - 3 1

_ 1 /

- 4 e

g a C 3

P m

ee a

r r c r

u S

/

c p n e ir o R T iau t t l n a n e ui v n n t P

e r

MC ao t

o - -

n 2 4 i

o t

c m A a r

e c v S i

t

/

i p )n a ri u Tl ap u c x C d iaE t

d n

o a m (r ht u l

a e a ut n oe t h e

MMAO s

u a )

2 C

( 1 35 9 t r

9 9 de p o S

1 s

n e .

R o N h c

e c n N t

r i W a L ev O M E U  :

T H h U T fo/ X t n n N o o H O d R o n it S M he w M a -

T t

o e in _

I T Md h m N R )

t u t a x _

U O 2 h r E _

P ( S o e E

R f s e

n

)

i n -

a n s ic l p

o s e L

/ x a g g E e a n ( )

R t u in r n

) iav e oi r a 1

( O r ir T aE t lp r

r r x oi s t

oE(

t n t a n a r o s r ir e i r t

a u o e pd meph t r o N OA OO u H - -

D - -

s E FGH 9 m 6 d 9 a 4 d e 9 i l 3 e ul 1

1 l 5- e cr d b

a 3 Wi 28 p o e )

3 1 yF h c n _

1 w l r 3 e - T - S i

a 4- a i r g

_ 0 5

t a p CAR o (M 7

F -

3 lp E

x n

. : : : : (

t s o OEEYE e e it c

T NMTBNO r u r i

r TA A

t e

t l

i o a

s e

EN D D H D a f e c

r K mP y CIT t

cE en n a gr nn a o ON Lt E L n mel

t i

y o a ip n u u t

el DU L r P T

_ a s m e q u iaf eg e o

M N m R E- -MRR - -

O u )

C S 1

( ABCD

i l

I MONTHLY REFUELING INFORMATION REOUEST l

1. Facility name: Catawba Unit 1
2. Scheduled next refueling shutdown: April 1999
3. Scheduled restart following refueling: May 1999 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be? I If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

)

1

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). l J
7. Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 204
8. Present licensed fuel pool capacity: 141]l Size of requested or planned increase: =
9. Projected date of last refueling which can be accommodated by present lic: a.c < apacity:

November 2009 l

l DUKE POWER COMPANY DATE: April 13.1999 l l

Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

l

Operating Data Report Docket No. 50-414 Date April 12.1999 l

Completed By Rocer Willi;Lnn

. . Telephone 704-382-5346 Operating Status

1. Unit Name: Catawba 2
2. Reporting Period: March 1,1999. March 31,1999
3. Licensed Thermal Power (MWt): 3411 Notes:
  • Nameplate
4. Nameplate Rating (Gross MWe): 1305
  • Rating (GrossMWe)
5. Design Electrical Rating (Net Mwe): 1145 calculated as 1450.000
6. Maximum Dependable Capacity (Gross MWe): 1192 MVA * .90 power
7. Maximum Dependable Capecity(Net MWe): 1129 factor per Page 111, I 0.
8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:

I l

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions,If any:

l This Month YTD Cumulative

11. Hours in Reporting Period 744.0 2160.0 110593.0
12. Number of Hours Reactor was Critical 744.0 2160.0 89887.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 {
14. Hours Generator On-Line 744.0 2160.0 88612.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2533862 7287371 288837306 4 17, Gross Electrical Energy Generated (MWH) 918502 2638777 102694483
18. Net Electrical Energy Generated (MWH) 873825 2509475 96911095
19. Unit Service Factor 100.0 100.0 80.1
20. Unit Availability Factor 100.0 100.0 80.1 21.Dnit Capacity Factor (Using MDC Net) 104.0 102.9 77.5
22. Unit Capacity Factor (Using DER Net) 102.6 101.5 76.5
23. Unit Forced Outage Rate 0.0 0.0 7.4
24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
25. If Shutdown At End Of Report Period, Estimated Date of Startup
26. Units in Test Status (Prior to Commercial Operation) l Forcast Achieved l Initial Criticality Initial Electricity Commercial Operation i

3 A - 4/12/99 L

I 9 f 9 o 3, I ,

4 e

g

- g P

a ., . 3 e

c m n a r

e r c r

u S

/

c ip n o e r R T iau t t

n l a n e ui v n n t e

r a o P

o MC - -

t n 2 4 i

o t

c m A a r

e c v S i

t c

/

i p )n e ri r

r Tlap o c x C d l iaE t

d n

a h t

o an moe(r u

e e a ut t h s

u a

MMAO

) - - -

C 2

( 1 35 9 t r

9 9

1 de p o s e .

S . nR o N h e t N c

r i c n W a L ev O M E J  :

n H h J

I T fo/ X t n n N o o H O d R o n i

t S M he w t

M a n

T I T Md o

h e i m

R t a N O

)

2 h u t r

x U P ( S o E e

E f s ) _

R n n _

e i a

c n s i l p

o s e L

/ x a g g E e a n ( )

R t i r n i v e roi n

) u a 1

O a r i r lt

( T aE r p r t r x oi s oE(

n t a n t

a r o s r ir e i r t

a u o e pd pt meh r

u H o N OA OO D - - - -

s EFGH 9 m 6 d 9 a 4 d e 9 i l 3 e u l

1 2 l i 5- e cr d a 3 .

W 2 p o e )

4 b 1 8 yF h c n 1 w l r 3 e T - S i a

4- a i r g 4- l 0

t a p o F - p 5C AR7 0 S E

x t

n o

. : : : : ( s i OEEYE e t c

e T NMTBN  : lu r

r i

t r

TA A O e i o a

s e

EN DDE H t

a f e r K P D c y CIT t

TE n e n a ngro ON EL  :

n o p mel el n ia t DU LE y r n u ug t

L P T a s a

e q iuiaf e e o

m M N m R E MRR O u )

C S 1

( ABCD

i-MONTHLY REFUELING INFORM ATION REOUEST

1. Facility name: Catawba Unit 2 l
2. Scheduled next refueling shutdown: March 2000
3. Scheduled restart fcilowing refueling: April 2000 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

i If yes, what will these be? 1 If no, has reload design and core configuratian been reviewed by Safety Review Committee regarding unreviewed safety questions? ,

l  !

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. ~ Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuel pool: 634
8. Present licensed fuel pool capacity: 1411 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

May 2012 DUKE POWER COMPANY DATE: April 13.1999 Name of

Contact:

R. A. Williams Phone: (704b 382-5346 l

i 1 l

l l

l l