Ro:On 940719,channel 9 (S/G a Channel 2) Declared Inoperable.Work Request Was Generated to Repair Channel During Future Outage of Sufficient Length Since Containment Entry Required for Work
ML20072P425
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 08/23/1994
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PIP-2-C94-1032, R-940823, R0-940823, NUDOCS 9409070265
Download: ML20072P425 (3)


Text

_ ,_

ll l DukeibwerCompany D. L Rats Catawba Nuclear Generation Department Lice President 4800 Concord Road (803)8313205 Office York.SC29745 (803)S313426 Fax DUKEPOWER August 23, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Catawba Nuclear Station, Unit 2 Docket No. 50-414 Special Report Vibration and Loose Parts Monitoring System Pursuant to Technical Specification 3.3.3.9, find attached a Special. Report concerning the inoperability of the Unit 2 Vibration and Loose Parts Monitoring System Channel 9.

Very truly yours, l

D. L. Rehn KEN /SR082394. LPM Attachment xc: S. D. Ebneter Regional Administrator, Region II R. E. Martin, ONRR R. J. Freudenberger l

Senior Resident Inspector 310037 t

, fDR409070265 94ogn j p ADOCK 05000d14 I  %,= ygm ,

PDR ,

I

i d

U. S. Nuclear Regulatory Commission August 23, 1994 Page 2 -

bxc: J. R. Fox CNO3SE Master File CN-801.01 CN02DC ELL EC050 NSRB Staff EC12A B. J. Ilorsley EC12T NCMPA-1 SREC PMPA NCEM Group File CN-801.01 K. E. Nicholson PIP 2-C94-1032 l

l l

l l

l l

l-- er

i l

l j . a.

W SPECIAL REPORT l CATAWBA NUCLEAR STATION, UNIT 2 l

l PIP 2-C94-1032 Vibration and Loose Parts Monitoring System Channel 9 On July 19, 1994, Channel 9 (S/G A channel 2) was declared inoperable. This channel failed the acceptance criteria for background noise during performance of PT/0/B/4600/03 (Loose Parts Spectrum Comparison) . A work request

(#94028984) was generated to repair this channel during a future outage of sufficient length since containment entry is required for this work.

Coverage for S/G A is still provided by Channel 5.

Since these channels have been inoperable for more than 30 days, they are reportable to the NRC pursuant to Technical Specification 3.3.3.9.