Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20153B0531998-09-16016 September 1998 Special Rept:On 980817,errors in Implementation of Selected Licensee Commitment Testing Requirements on Fire Protection Sys Instruments,Was Discovered.Caused by Error in Interpretation of SLC Requirement.Will Revise Procedures ML20236M9151998-07-0707 July 1998 Special Rept:On 980611,determined That Required Firewatch Patrol Had Been Missed.Caused by Firewatch Being Performed on Wrong Unit Due to Human Error.Employee Was Verbally Counseled on Firewatches & Documentation Was Corrected ML20236G4451998-07-0101 July 1998 Special Rept:On 980618,declared Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Inoperable.Caused by Failure to Meet TS Definition of Channel Calibr.Will Revise Selected Licensee Commitment ML20248K1431998-06-0202 June 1998 Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Shrinkage of Foam & Improper Installation During Construction of Plant.Posted Fire Watches & Repaired Firestop F-AX-348-W-134 ML20247H5351998-04-12012 April 1998 Special Rept:On 980415,missed Insp of Fire Hose Caskets Was Discovered.Caused by Error in Transferring Info from One Procedure to Another.Planned Rev of Applicable Procedure to Include Gasket Insp at Appropriate Frequency ML20216B0211998-04-0606 April 1998 Special Rept:On 980325,determined That Loose Parts Monitoring Sys Being Inoperable for Greater than Thirty Days.Caused by Incorrect Testing.All Channels of Loose Parts Monitoring Sys Tested Utilizing Revised Test Method ML20217K9271998-03-26026 March 1998 Special Rept:On 971229,procedure Step for Closing Safety Injection Pump Cold Leg Injection Isolation Valve Was Inadvertently Skipped.Caused by Injection of Water Into RCS from Rwst.Simplified Procedures & Discussed Event ML20216D5641998-03-0505 March 1998 Special Rept:On 980204,discovered That Fire Detection Panel Was Apparently Not Communicating W/Several Local Fire Detectors.Caused by Faulty Computer Sys Cards.Replaced Four Computer Cards in Sys ML20202C4701998-02-0505 February 1998 Ro:On 971228:Unit 1 Loose Parts Monitoring Sys Channel 6 Was Declared Inoperable Due to Excessive Static on Channel. Caused by Loose Connection.Work Order Has Been Written to Pursue Repairs ML20138E6851997-04-24024 April 1997 Special Rept:On 970318,Unit 1 Loose Parts Monitoring Sys Channel 13 Was Declared Inoperable Due to Sporadic Electical Static.Channel Was Removed from Svc & Entered Into TS Action Item Logbook as Inoperable ML20149M7251997-01-20020 January 1997 Special Rept:On 961209,Unit 1 Loose Parts Monitoring (Lpm) Sys Channel 20 Declared Inoperable Due to No Signal Being Received from Field.Lpm Channel 20 & 22 Operable & Providing Monitoring Coverage for Primary Side of 1D S/G ML20134K4901996-11-0606 November 1996 Special Rept:On 961009,selective Licensee Commitment for Operability of Fire Protection Sprinkler Sys Not Maintained. Continuous Fire Watch Established within One H Following Identification of Incorrect Remedial Action ML20134H1331996-11-0404 November 1996 Special Rept:On 961004,Unit 1B DG Failed Due to Failure of Motor Operated Pot,Electronic & Mechanical Governor,Governor Droop Relay & Mechanical Binding of Fuel Rack Control Linkage.Dg Procedures Will Be Revised ML20113A1801996-06-17017 June 1996 Special Rept:On 960521,declared Detectors A01 for Zone 69 & A04 for Zone 60 Inoperable Because Detectors Effectively Isolated from Area in Intended Protection.Detectors Relocated,Tested & Declared Operable on 960524 ML20100H9801996-02-20020 February 1996 Special Rept:On 960111,Unit 1 Loose Parts Monitoring Channel 21 Declared Inoperable,Due to Spurious,Unexplainable Electronic Bursts.Work Request Initiated to Pursue Corrective Action ML20100H9751996-02-20020 February 1996 Special Rept:On 960111,Unit 2 Loose Parts Monitoring Sys Channel 7 Declared Inoperable,Due to pre-amp Bias Voltage Indicating Zero Volts Twice During Previous Seven Days.Work Request Written to Pursue Corrective Action ML20097F5011996-02-11011 February 1996 Special Rept:On 960102,Unit 2 Loose Parts Monitoring Sys Channel 17 Was Declared Inoperable.Two Other Channels Operable & Providing Coverage Against Loose Parts ML20096E7731996-01-12012 January 1996 Special Rept:On 951214,unit 2 DG Valid Failure Occurred. Caused by Fuel Line Fitting Backing Off from Cylinder Head Connection,Which Resulted in Fuel Oil Leakage.Dg Successfully Started,Run & Declared Operable on 951215 ML20096A8761995-12-18018 December 1995 Special Rept:On 951120,during Periodic Surveillance Testing, Lpms Channel 5 Declared Inoperable.Caused by Erratic Preamp Bias Voltage Indications.Work Request 95048483 Initiated to Perform Corrective Maint During Unit 1 Cycle 9 ML20094Q5811995-11-13013 November 1995 Special Rept:On 951014,auxiliary Bldg Filtered Exhaust Sys Pump Room Heater Declared Inoperable Due to Blown Fuse & Not Restored to Operable Status within 7 Days Per Ts. Technical Investigation Will Be Performed ML20094B8291995-10-25025 October 1995 Special Rept:On 950919,loose Parts Monitoring Sys Channel 1 Declared Inoperable Due to Erratic Preamp Bias Indication. Work Request Written to Investigate & Repair Channel ML20098A4641995-09-19019 September 1995 Special Rept:On 950817,Unit 2 Lpms Channel 12 Was Declared Inoperable Due to Channel Sensor Failing Acceptance Criteria During Performance of PT/O/A4600/03 ML20092G6041995-09-14014 September 1995 Special Rept:On 950815,CNS Unit 1 DG 1A Invalid Failure Occurred Due to Main Bearing High Temp Trip Signal.Caused by Failed Splice Installed in Circuit for RTD 1LDRD5630.New RTD Installed in Main Bearing 5 ML20086H1401995-07-12012 July 1995 Special Rept:On 950615,Channel 4 Was Declared Inoperable Due to Noise Uncharacteristic of Healthy Channel Detected Via Vibration & Loose Parts Monitoring Sys.Corrective Maint Will Be Performed During 1EOC9 Outage ML20086H1431995-07-11011 July 1995 Special Rept:On 950608,Channel 13 Was Declared Inoperable. Trending of Bias Voltage & Background RMS Evaluated to Conclude Channel Was Experiencing Periodic Failures. Corrective Maint Will Be Performed During 1EOC9 Outage ML20086C6441995-06-29029 June 1995 Special Rept:On 950523,Unit 1 Train a Fuel Handling Ventilation Filter Heaters Declared Inoperable.Evaluation Done to Determine Fault ML20085M4061995-06-20020 June 1995 Special Rept:On 950501,lower Rv Tube 4 Was Declared Inoperable ML20084N7271995-05-25025 May 1995 Special Rept:On 950425,valid Failure of DG 1A Occurred. Caused by Jacket Water Thermostatic Control Valve Sticking in Position Which Reduced Engine Cw Flow Through Heat Exchanger.Thermostatic Cv Internals Removed & Replaced ML20082L2711995-04-17017 April 1995 Special Rept:On 950308,Unit 2 Cathodic Protection Sys Was Declared Inoperable & Remained Inoperable Greater than 10 Days ML20081D4851995-03-13013 March 1995 Special Rept:On 950211,actuation of PORV 1NC32B Occurred. Procedure OP/1(2)/A/6100/02 Revised to Require More Emphasis on Monitoring Pressure Indication During Sensitive Evolutions ML20080Q8701995-03-0202 March 1995 Special Rept:On 950202,Unit 1 DG 1B Invalid Failure Due to Overcurrent Breaker Trip During Governor Troubleshooting ML20149H7821994-12-20020 December 1994 Special Rept:On 941129,discovered That Selective Licensee Commitment (SLC) for Visual Insp of Fire Rated Assemblies Exceeded Due to Misinterpretation of Requirements of SLC 16.9-5.Fire Barriers Visually Inspected ML20078R0021994-12-12012 December 1994 Special Rept:On 941103,Channel 3 (Upper Rv a) Declared Inoperable.Caused by Channel Sensor Failure of Acceptance Criteria During Performance of PT/0/A/4600/03.Repair Planned for End of 2EOC7 Outage Due to Containment Entry Required ML20078K7361994-11-17017 November 1994 Special Rept on 941021,DG 1A Invalid Failure Occurred Due to Main Bearing High Temp Trip.Operability Performance Test Successfully Completed & Engine Declared Operable on 941022 ML20149G8041994-11-0101 November 1994 Special Rept:On 940922,CNS,Unit 2 Cathodic Protection Sys Declared Inoperable & Remained Inoperable for Greater than 10 Days.Wo 94080948-01 Initiated to Replace Prepackaged Anode Well 1.WO Scheduled for 941114 ML20076F3191994-10-0404 October 1994 Special Rept:On 940908,valid Failure of D/G 1A Occurred Due to Air Start Valve Sticking Open.Maint Procedure MP/0/A/7650/99 Revised,New Air Roll Criteria Developed & Sixteen Starting Air Valves Replaced ML20072P4251994-08-23023 August 1994 Ro:On 940719,channel 9 (S/G a Channel 2) Declared Inoperable.Work Request Was Generated to Repair Channel During Future Outage of Sufficient Length Since Containment Entry Required for Work ML20072E5961994-08-15015 August 1994 Special Rept:On 940715,inoperability of Unit 2 Vibration & Loose Parts Monitoring System Channel 4 & 6 Occurred.Caused by Leds Not Lighting During Performance of PT/0/B/4600/03. Work Orders 94051250-01 & 94051251-01 Initiated ML20071N8511994-07-28028 July 1994 Special Rept:On 940711,main Steam Relief Valve Exhaust Monitors Declared Inoperable Due to Engineering Calculation Concerns.Engineering Calculation CNC-1229.00-00-0047 re-performed Using EPA-400 Methodology ML20071N7441994-07-28028 July 1994 Special Rept:On 940711,delta-t Channel on Chart Recorder Found to Be out-of-tolerance Due to Drifting of Analog to Digital (A/D) Converter Card.A/D Card Replaced & delta-t Channel Chart Recorder Declared Operable ML20070K0191994-07-18018 July 1994 Special Rept:On 940630,re Inoperability of Main Steam Line Radiation Monitor 2EMF12.Work Request 94026262 Generated to Reattach 2EMF12 to Main Steamline.Work Request Completed on 940701 ML20069H0861994-05-31031 May 1994 Special Rept:On 940501,Unit 2 DG 2A Invalid Failure Occurred Due to Right Bank Turbocharger Vibration Trip.Based on Cooper-Enterprise Recommendations,Procedure Changes Made to Calibr Procedures for All Four DGs ML20065K5011994-04-13013 April 1994 Special Rept:On 940314,invalid Failure of Diesel Generator 1B Occurred Due to Output Tripping During Calibration of Electronic Governor.Dg 1B Started Successfully on 940315 & Declared Operable ML20064G2911994-03-15015 March 1994 Special Rept:On 940203,SG Channels 9 & 11 Declared Inoperable.Channels Failed to Meet Band Limited RMS Acceptance Criteria During Performance of 18 Month Channel Calibr Test.Work Request Written to Repair Channels ML20064G2771994-03-0707 March 1994 Special Rept:On 940125,Channels 6,7 & 10 Were Declared Inoperable.Channels Failed to Meet Acceptance Criteria During Performance of 18 Month Channel Calibr Test.Work Request Written to Repair Channels 1999-09-07
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J1891999-10-0101 October 1999 Safety Evaluation Supporting Exemption from 10CFR54.17(c)re Schedule to Apply for Renewed Operating Licenses ML20212A6271999-09-30030 September 1999 Rev 0 to WCAP-15243, Anaylsis of Capsule V & Capsule Y Dosimeters from Duke Energy Catawba Unit 2 Reactor Vessel Radiation Surveillance Program ML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-004-01, :on 980906,error During Tagout Caused de-energization of Vital Bus & Actuation of Ltop.Caused by Inadequate Work Practices.Individuals Involved Were Counseled1999-09-27027 September 1999
- on 980906,error During Tagout Caused de-energization of Vital Bus & Actuation of Ltop.Caused by Inadequate Work Practices.Individuals Involved Were Counseled
05000413/LER-1999-015, :on 990616,discovered That Auxiliary Bldg Filtered Ventilation Exhaust Sys Was Inoperable.Caused by Improperly Positioned Vortex Damper.Damper Was Repositioned Correctly & Sys Was Retested Successfully1999-09-27027 September 1999
- on 990616,discovered That Auxiliary Bldg Filtered Ventilation Exhaust Sys Was Inoperable.Caused by Improperly Positioned Vortex Damper.Damper Was Repositioned Correctly & Sys Was Retested Successfully
ML20212G2511999-09-22022 September 1999 Safety Evaluation Supporting Amends 180 & 172 to Licenses NPF-35 & NPF-52,respectively 05000413/LER-1999-008, :on 990610,operations Prohibited by TS 3.5.2, Was Violated.Caused by Inoperable Centrifugal Charging Pump. Operators Swapped to CCP 1A & Sys Parameters Were Returned to Normal.With1999-09-21021 September 1999
- on 990610,operations Prohibited by TS 3.5.2, Was Violated.Caused by Inoperable Centrifugal Charging Pump. Operators Swapped to CCP 1A & Sys Parameters Were Returned to Normal.With
05000414/LER-1999-005-02, :on 990727,missed Emergency DG TS Surveillance Concerning Verification of Availability of Offsite Power Sources,Was Declared.Caused by Defective Procedure.Revised Affected Procedure1999-09-20020 September 1999
- on 990727,missed Emergency DG TS Surveillance Concerning Verification of Availability of Offsite Power Sources,Was Declared.Caused by Defective Procedure.Revised Affected Procedure
05000413/LER-1999-009, :on 990518,inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits Was Noted. Caused by Inadequate Retest Following Surveillance Test Failure.Valve Was Retested & Returned to Service1999-09-15015 September 1999
- on 990518,inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits Was Noted. Caused by Inadequate Retest Following Surveillance Test Failure.Valve Was Retested & Returned to Service
ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 05000413/LER-1999-014, :on 990816,missed Surveillances & Operation Prohibited by TS Was Noted.Caused by Defective Procedures or Programs Inappropriate TS Requirements.Affected Procedures/ Programs Were Revised & Testing Was Performed1999-09-0101 September 1999
- on 990816,missed Surveillances & Operation Prohibited by TS Was Noted.Caused by Defective Procedures or Programs Inappropriate TS Requirements.Affected Procedures/ Programs Were Revised & Testing Was Performed
05000414/LER-1999-004, :on 990616,CIV 2NM-221A Was Returned to Svc Without Testing,As Required by TS 3.6.3.Caused by Programmatic Deficiency.Test Procedure Has Been Revised & Subject Valve Was Successfully Tested & Returned to Svc1999-09-0101 September 1999
- on 990616,CIV 2NM-221A Was Returned to Svc Without Testing,As Required by TS 3.6.3.Caused by Programmatic Deficiency.Test Procedure Has Been Revised & Subject Valve Was Successfully Tested & Returned to Svc
ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-003, :on 990612,unplanned Actuation of ESFAS Occurred Due to a SG High Level.Caused by Inadequate Procedural Guidance.Msiv 2SM-7 Was Closed & SG 2A Level Was Returned to Normal1999-08-31031 August 1999
- on 990612,unplanned Actuation of ESFAS Occurred Due to a SG High Level.Caused by Inadequate Procedural Guidance.Msiv 2SM-7 Was Closed & SG 2A Level Was Returned to Normal
ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 05000413/LER-1999-012, :on 990727,adverse Sys Interaction Between Annulus Ventilation Sys & Auxiliary Building Ventilation Sys Was Discovered.Caused by Inadequate Design.Compensatory Actions Developed & Implemented.With1999-08-26026 August 1999
- on 990727,adverse Sys Interaction Between Annulus Ventilation Sys & Auxiliary Building Ventilation Sys Was Discovered.Caused by Inadequate Design.Compensatory Actions Developed & Implemented.With
ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210U8341999-08-13013 August 1999 Safety Evaluation Supporting Amends 179 & 171 to Licenses NPF-35 & NPF-52,respectively ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 05000413/LER-1999-009, :on 990518,inoperability of Containment Valve Injection Water Sys Valve Was Noted in Excess of TS Limits. Caused by Inadequate Testing Following Surveillance Test Failure.Valve Was Retested & Restored to Service1999-07-19019 July 1999
- on 990518,inoperability of Containment Valve Injection Water Sys Valve Was Noted in Excess of TS Limits. Caused by Inadequate Testing Following Surveillance Test Failure.Valve Was Retested & Restored to Service
05000414/LER-1999-004-02, :on 990610,violation of TS 3.6.3 Was Noted Due to CIV 2NM-221A Being Returned to Service Without Testing. Caused by Procedure Deficiency.Civ 2NM-221A Was Tested & Returned to Operable Status1999-07-15015 July 1999
- on 990610,violation of TS 3.6.3 Was Noted Due to CIV 2NM-221A Being Returned to Service Without Testing. Caused by Procedure Deficiency.Civ 2NM-221A Was Tested & Returned to Operable Status
ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation 05000414/LER-1999-003-02, :on 990612,unplanned Actuation of Esfa Sys Due to a SG High Level Was Noted.Caused by Inadequate Procedural Guidance.Long Term Corrective Actions to Prevent Recurrence of Event Are Being Developed1999-07-0808 July 1999
- on 990612,unplanned Actuation of Esfa Sys Due to a SG High Level Was Noted.Caused by Inadequate Procedural Guidance.Long Term Corrective Actions to Prevent Recurrence of Event Are Being Developed
ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-002-03, :on 990504,plant Was Forced to Shutdown as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Affected Piping Was Cleaned & Flow Tested1999-06-0303 June 1999
- on 990504,plant Was Forced to Shutdown as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Affected Piping Was Cleaned & Flow Tested
ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions 05000413/LER-1999-004, :on 990310,operation Prohibited by TSs Was Noted.Caused by Incorrect TS Requirements for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation.Submitted Lar.With1999-04-12012 April 1999
- on 990310,operation Prohibited by TSs Was Noted.Caused by Incorrect TS Requirements for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation.Submitted Lar.With
ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML20205N2381999-04-0909 April 1999 Safety Evaluation Supporting Amends 178 & 170 to Licenses NPF-35 & NPF-52,respectively ML20205N2121999-04-0808 April 1999 Safety Evaluation Supporting Amends 177 & 169 to Licenses NPF-35 & NPF-52,respectively ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205B3101999-03-26026 March 1999 Safety Evaluation Supporting Amends 176 & 168 to Licenses NPF-35 & NPF-52,respectively 1999-09-07
[Table view] |
Text
5Y
^
l
'Y I
. Duke 1%erCanpany i._
D.L Rats '
Cataubs Nglear Generation Department..
Mce President
' 4800ConcordRoad :
- (803)8313205 othce
. Y0rk, SC29745 (803)8314126 Fat I e
(
March 02,1995.
is
[h,
U. S. Nuclear Regulatory Commission ~
ATTN: Document Control Desk
. Washington, DC 20555
- 1 Cata' ba Nuclear Station, Unit 1 g
Subject:
w i
Docket No. 50-413 Special Report Invalid Failure of Diesel Generator 1B l
1 Pursuant to Technical Specification 4.8.1.1.3 and 6.9.2, find attached.a Special
~!
Report concerning the Unit 1 Diesel Generator (DG 1B)' invalid failure which
- occurred on February 02,1995.
3 Sincerely,
)
-i
~
D.L.Rehn
!'l
.-l 6
. KEN \\DG1B0302.95 q
L
-l Attachment W
^
xc:
S. D. Ebneter, Regional Administrator -
g gl ' -
R. E. Martin, ONRR g
L R. J. Freudenberger, SRI-S l-9503090004 950302 PDR ADOCK 05000413 S
PDR w e n.=
g;
n,.
, m f *<
j q,
7' j
y SPECIAL REPORT
~
=
CATANBA NUCLEAR STATION DoCERT DOCKET NO. 50-413 DIESEL GENERATOR 1B INVALID FAILURE j
DUE TO OVERCURRENT BREARER TRIP DURING GOVERNOR TROUBLESHOOTING E
i An invalid failure of Diesel Generator (DG) 1B occurred on' 02/02/95, due to the output breaker (1ETB18) tripping' during troubleshooting activities on the j
electronicL governor.
Instrumentation. and Electrical (IAE) personnel were f
attempting to determine the ' ause of the load drift problems which were observed
- f c
~
'during the performance of the Operability Periodic Test (I'r) earlier this day. Unit 1 was in Mode 1 (Power Operations) at 100% power when this failure occurred.
There have been 0 valid failures in the last 20 valid tests and 0 valid failures in the last 100 valid tests of DG 1B. DG 1B remains on a monthly operability test schedulej in accordance with Technical Specification (TS) 4.8.1.1.2 Table 4.8.1. There are 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> of unavailability associated with the load drift problem, but none attributed directly to the overcurrent breaker trip event.
i On 02/02/95, DG 1B was started and paralleled to the essential bus for'its Operability PT. Approximately 15 minutes into the full load run at 5750 kW, load began to drift +/-200 kW. This was not a fast oscillation but a slower movement outside of the TS required band of 5600 to 5750 kW. The operator attempted to keep the load within the required band by adjustment of the Raise / Lower Speed pushbuttons. When the engine run was completed, IAE and Electrical Systems and Equipment (ESE) engineering personnel were requested to investigate the cause of.
l the load drift. This investigation was done under Work Order #95006267-01 which was initiated following the previous month's run when the load drift.was first observed. At that time, the Operability PT was successfully completed. The engine was started again (Start #1065) and loaded to several different power levels (1750 kW,3000 kW,4000 kW,5000 kW) for approximately 5 minutes each with no load drift observed. The engine was then taken to full load and run for several minutes before the drift was again observed. No significan drift was observd when engine load was dropped to 3000 kW.
At this point, IAE believed the problem to be with the load sharing portion of the governor circuitry, so the droop potentiometer was adjusted per IP/0/A/3680/14,.
. Procedure for Tuning Diesel Engine Governor. Several different settings were '
j attempted, none of which appeared to orrect the problem. It was during the i
course of this adjustment that an overcurrent breaker trip occurred. The operator..
manually shutdown the engine and the 50DGT relay was reset.' The governor droop potentiometer was returned to its original position.
The Failure p
Investigation Process (FIP) was initiated to pursue the cause for the load instability.
l
1
- (eY '
)1
- .;7
.y
?
LV m.
d SPECIAL REPORT-CATANSA NUCLEAR STATION.
DoCEET DoCERT No. 50-413 DIESEL GENERATOR-1B INVALID FAILURE DUE To oVERCURRENT BREARER TRIP DURING GOVERNOR TROUBLESBoOTING' l
1
~ The overcurrent breaker trip was the result of the troubleshooting activities that are W
described above. This report documents only the invalid failure which result from 1
the overcurrent relay. actuation.. The other runs associated with troubleshooting -
the load drift were not classified.as invalid failures since the engine ; started
'7 properly, accepted load, and did not trip as a result of that problem. However,.
),
- the slow drift was not a desirable situation. The FIP and PIP programs were used to determine the root cause and resolve that situation as documented in Problem p
Investigation Process (PIP) #1-C95-0145.~
I The overcurrent breaker trip is only active when the incoming breaker is closed on l
the emergency. bus and the DG is operating in parallel with the utility grid. This-trip is bypassed on an emergency start and would not have affected the DG had it been needed forz a design : basis event.. The 50DGT; relay is set' to trip
- instantaneously at a point that prevents any damage to the ' generator and its 1
associated components. The setup and/or tuning of the governor is such that-adjustments have to be made while the engine is running. Therefore, unavoidable
(;
transients can occur in the process of obtaining the proper settings for the various potentiometers.
.This is the second incidence of an overcurrent breaker trip occurring during the -
governor tuning procedure.- On 3/14/94,,during calibration of the electronic ;
>l governor the output signal was lost when an analog test meter scale range 'was l
L changed as documented in PIP #1-C94-0324.
At 1930 on 02/05/95, the DG 1B Operability 17f was successfully completed (Start I.
- 1%9) with no load drift observed. The root cause of the drift problem was found to be an oxidation layer between the wiper and the resistance coil on the Load Gain -
potentiometer for the electronic governor. This was corrected by exercising the l
,. potentiometer back and forth to clear any buildup that may have been present.
I.:
L eie n 7 m m o e i. ar eti k.a.
a.
n s,i.
'[
ic i i i --,
-oi
.