Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826
ML20216E540
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/07/1999
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9909150056
Download: ML20216E540 (2)


Text

Fi , , . ,

[] '

Duke Power Catawba Nudear Station 4800 Concord Road I

~~" York, SC 29745

  • Gary R>Peterson (803) 831-4251 OFFICE y;g ;y,;g,,,, (803) 831-3426ux

~ September 7, 1999 U. S. Nuclear Regulatory Commission ATTEtiTION: Document Control Desk Washington, DC -20555-0001

SUBJECT:

Duke Energy Corporation 1 Catawba Nuclear Station Units 1 and 2 j Docket Nos. 50-413 and 50-414 1 Special Report Inoperability of Meteorological Monitoring Instrumentation Channels Pursuant to Selected Licensee Commitment 16.7.3 with one or more required meteorological monitoring channels inoperable for more than seven days, a Special Report is required within the next ten days. The Special Report is required to outline the cause of the malfunction and the plans for restoring the channel (s) to operable status.

On August 26, 1999, during a routine system walkdown it was discovered that the meteorological system upper wind speed cup set was broken, causing the Upper Wind Speed Channel to ,

be inoperable. It was determined that the channel had been l inoperable.since August 13, 1999, via review of historical data.

i The cup set was replaced and the channel was restored to operable status on August 26, 1999. The cause of the cup set failure could not be positively determined. Cup set failures occur periodically, and can be caused by very hard l rain, lightening, and bird strikes. The operation of the i

meteorological system is monitored periodically, but these l checks were unsuccessful in promptly detecting this failure. t, l

There are no regulatory commitments associated with this correspondence. Questions regarding this Special Report f should be directed to M. H. Chernoff at (803) 831-3414. )

Sin erel , et/

// /f Pe erson /U

,/

9909150056 990907 PDR ADOCK 05000413.'

S PDR

C U.S. Nuclear Regulatory Commission

,, September 7, 1999 Page 2 XC:

L. A. Reyes U. S. Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 P. S. Tam NRC Senior Project Manager (CNS)

U. S. Nuclear Regulatory Commission Mail Stop O-14H25 Washington, DC 20555-0001 D. J. Roberts Senior Resident Inspector (CNS)

U. S. Nuclear Regulatory Commission Catawba Nuclear Site

- _ - _ - _ _ _ _ _ _ _