ML20217H032

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2
ML20217H032
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/31/1999
From:
DUKE POWER CO.
To:
Shared Package
ML20217H008 List:
References
NUDOCS 9910220041
Download: ML20217H032 (1)


Text

F

]

CATAWBA NUCLEAR STATION l

MONTHLY OPERATING STATUS REPORT I

AUGUST 1999-1 1.

Personnel Exposure -

The total station liquid release for AUGUST has been j

compared with the Technical Specifications maximum annual

]

dose commitment and was less than.10 percent of this limit.

The total station _ gaseous release for AUGUST has been I

compared with the Technical Specifications maximum annual

-dose commitment and was less than 10 percent of this limit.

1 i

)

)

c 9910220041 991013 PDR ADOCK 05000413 R

PDR i