Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement
Results
Other: ML062960009, ML063040075, ML063050355, ML063050363, ML063050370, ML063050590, ML063050595, ML063050608, ML063100474, ML063470607, ML070320537, ML070320542, ML070320564, ML070320567, ML070320592, ML070320601, ML070320605, ML070320657, ML070320662, ML070320667, ML070320671, ML070320676, ML070320680, ML070320719, ML070320721, ML070320728, ML070320733, ML070320740, ML070320745, ML070320756, ML070320784, ML070320787, ML070320791, ML070320802, ML070320803, ML070320806, ML070570480, ML070590453, ML070590456, ML070610479, ML070710153, ML070710154, ML070710155, ML070710159, ML070710161, ML070720347, ML070800414, ML070800420, ML070800423, ML070800434... further results
|
MONTHYEARML0802302892002-12-31031 December 2002 Pennsylvania Bureau of Radiation Protection, Environmental Radiation in Pennsylvania: 2001-2002 Annual Report Project stage: Other ML0802804772002-12-31031 December 2002 Information on Haliaeetus Leucocephalus - Bald Eagle Project stage: Other ML0802303352003-05-31031 May 2003 Lackawanna-Luzerne Counties, Long Range Transportation Plan for the Lackawanna-Luzeme Transportation Study Area (2003-2025). Project stage: Other ML0802303182004-02-24024 February 2004 Pennsylvania Game Commission, C. Fergus, Wood Warblers. Project stage: Other ML0802204462004-07-22022 July 2004 U.S. Census Bureau. Pennsylvania Quickfacts: Columbia County Project stage: Other ML0802204452004-07-22022 July 2004 U.S. Census Bureau - Pennsylvania Quickfacts Luzerne County Project stage: Other ML0802303142004-07-26026 July 2004 Pennsylvania Department of Transportation, Traffic Volume Maps, Luzerne and Columbia Counties, 2002 Project stage: Other ML0802303242004-07-27027 July 2004 U.S. Environmental Protection Agency, Local Drinking Water Information - Pennsylvania Drinking Water Project stage: Other ML0802204562004-08-18018 August 2004 Riverlands Environmental Preserve - General Information Project stage: Other ML0802302562004-11-10010 November 2004 King'S College, the Pennsylvania Marketing and Planning Center, Excerpts Project stage: Other ML0802303322005-03-31031 March 2005 U.S. Environmental Protection Agency, Brownfields Cleanup and Redevelopment: Brownfields Cleanup Revolving Loan Fund Pilot Fact Sheet on Luzerne County, PA Project stage: Other ML0802303262005-10-12012 October 2005 Centers for Disease Control & Prevention, Legionellosis: Legionnaires' Disease (Ld) and Pontiac Fever. Project stage: Other ML0802303172005-12-0606 December 2005 Pennsylvania Department of Environmental Protection, Standards for Cleanup, Reuse of Hazleton Mine Reclamation Project Project stage: Other ML0802303342005-12-31031 December 2005 River Basin Commission, Susquehanna River Basin Commission Gis Program., Excerpt, Middle Susquehanna Subbasin. Project stage: Other ML0623501472006-08-15015 August 2006 Monthly Operating Reports Project stage: Request ML0626201572006-09-13013 September 2006 Application for Renewed Operating Licenses Project stage: Request ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Request ML0703206572006-10-0303 October 2006 Email from Allison Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208032006-10-0303 October 2006 Email from Nash Regarding Consultation Letters on American Shad in the Susquehanna River Project stage: Other ML0703206012006-10-0505 October 2006 E-mail from Metz Regarding the Susquehanna Steam Electric Station Data Assessment Project stage: Other ML0703206052006-10-0505 October 2006 Email from Moret Regarding the Susquehanna Steam Electric Station Category 1 & 2 Issues Project stage: Other ML0703207982006-10-0505 October 2006 Email from Klementowicz Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Acceptance Review ML0703206672006-10-0606 October 2006 E-mail from O'Rourke Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206802006-10-0606 October 2006 Email from Avci Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208002006-10-0606 October 2006 Email from Davis Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Acceptance Review ML0703205672006-10-0707 October 2006 E-mail from Vinikour Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703205922006-10-0909 October 2006 E-mail from Monette Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206622006-10-0909 October 2006 E-Mail from Lazaro Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206762006-10-0909 October 2006 E-mail from Lagory Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208022006-10-0909 October 2006 Email from Monette to Mullins Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703205642006-10-0909 October 2006 Email from Wescott Regarding the Environmental Report (Er) Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other PLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 Project stage: Request ML0703208062006-10-16016 October 2006 Acceptance Review Checklist from Mullins Regarding the Susquehanna Steam Electric Station Environmental Report Project stage: Other ML0629600792006-10-24024 October 2006 Maintenance of Reference Materials at the Mill Memorial Library, Related to the Review of the Susquehanna Steam Electric Station License Renewal Application Project stage: Approval ML0629600602006-10-26026 October 2006 Maintenance of Reference Materials at the Berwick Public Library, Related to the Review of the Susquehanna Steam Electric Station License Renewal Application Project stage: Approval ML0703206712006-10-31031 October 2006 E-mail from Quinn Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0629600492006-11-0101 November 2006 50 Mile Vicinity Map Project stage: Request ML0629600092006-11-0101 November 2006 License Renewal Application Review (Shpo No. 05-1588-079-A) Project stage: Other PLA-6133, Acceptability and Sufficiency for Docketing - Application for Renewed Operating Licenses Numbers NPF-14 and NPF-222006-11-0202 November 2006 Acceptability and Sufficiency for Docketing - Application for Renewed Operating Licenses Numbers NPF-14 and NPF-22 Project stage: Request ML0703207842006-11-0606 November 2006 Email from Franovich Regarding Questions on Consultation Letters Project stage: Other ML0630503632006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Oneida Nation Wisconsin Project stage: Other ML0630503552006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Eastern Shawnee Tribe Oklahoma Project stage: Other ML0630505952006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Shawnee Tribe Project stage: Other ML0630505902006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Onondaga Nation - Gonyea Project stage: Other ML0630506082006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Mohican Nation Project stage: Other ML0630503702006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Shawnee Tribe Oklahoma Project stage: Other ML0633302792006-11-15015 November 2006 (Units 1 & 2) Afternoon Public Meeting Project stage: Meeting ML0633302812006-11-15015 November 2006 Transcript of Susquehanna Steam Electric Station (Units 1 and 2) Evening Public Meeting on November 15, 2006, Pages 1-46 Project stage: Meeting ML0632401502006-11-15015 November 2006 11/15/06 Environmental Scoping Meeting Slide Handouts Project stage: Request ML0630400752006-11-15015 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Tonawanda Band of Seneca Project stage: Other 2006-10-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] Category:License-Monthly Operating Report
MONTHYEARPLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0623501472006-08-15015 August 2006 Monthly Operating Reports PLA-0060, June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22006-07-14014 July 2006 June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 ML0618703972006-06-15015 June 2006 May 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0614405052006-05-15015 May 2006 April 2006 Monthly Operating Report for Susquehanna Units 1 & 2 ML0611601332006-04-14014 April 2006 March 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 & 2 ML0608704012006-03-10010 March 2006 February 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0605304122006-02-13013 February 2006 Susquehanna Units 1 and 2 Monthly Operating Reports for January 2006 ML0602602862006-01-13013 January 2006 December 2005 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0059, November 2005 Operating Report for Susquehanna, Units 1 and 22005-12-12012 December 2005 November 2005 Operating Report for Susquehanna, Units 1 and 2 PLA-0596, August 2005 Monthly Operating Report for Susquehanna Units 1 and 22005-09-14014 September 2005 August 2005 Monthly Operating Report for Susquehanna Units 1 and 2 PLA-0000, June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 22005-07-13013 July 2005 June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 2 PLA-0589, April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22005-05-10010 May 2005 April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 PLA-0058, March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 22005-04-13013 April 2005 March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0436304132004-12-13013 December 2004 November 2004 Monthly Operating Report, Susquehanna Steam Electric Station PLA-0057, July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station2004-08-13013 August 2004 July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station PLA-0056, October 2003 Monthly Operating Report for Susquehanna, Units 1 & 22003-11-13013 November 2003 October 2003 Monthly Operating Report for Susquehanna, Units 1 & 2 PLA-0055, December 2002 Monthly Operating Report for Susquehanna2003-01-13013 January 2003 December 2002 Monthly Operating Report for Susquehanna PLA-5574, November 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-12-13013 December 2002 November 2002 Monthly Operating Report for Susquehanna Steam Electric Station ML0227503732002-09-13013 September 2002 August 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0005, July 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-08-14014 August 2002 July 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0054, June 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-07-12012 July 2002 June 2002 Monthly Operating Report for Susquehanna Steam Electric Station PLA-0545, February 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-03-13013 March 2002 February 2002 Monthly Operating Report for Susquehanna Units 1 & 2 2006-09-14
[Table view] |
Text
%
Robert A. Saccone PPL Susquehanna, LLC Vice President - Nuclear Operations 769 Salem/Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 .. TM RASaccone@pplweb.com August 15, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA - 006106 The July 2006 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Robert A. Saccone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blamey NRC Project Manager, Mr. R V. Guzman
OPERATING DATA REPORT DOCKET NO. 50-387 UNIT One DATE 08/15/2006 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS I. Unit Name: Susquehanna Steam Electric Station (Ul)
- 2. Reporting Period: July 2006
- 3. Design Electrical Rating (Net MWe): 1177
- 4. Maximum Dependable Capacity (Net MWe): 1135 This Month Yr.-to-Date Cumulative
- 5. Hours in Reporting Period 744 5087.0 202920.0
- 6. Number of Hours Reactor Was Critical 744 4122.7 170490.2
- 7. Hours Generator On-Line 742.93 4059.7 168016.8
- 8. Unit Reserve Shutdown Hours 0 0 0
- 9. Net Electrical Energy Generated (MWH) 824,263 4,536,857 174,619,915 NOTES:
Page I of I
UNIT SHUTDOWNS 1'
DOCKET NO. 50-387 UNIT One DATE 08/15/2006 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH July 2006 No.
Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 3 7/2/06 S 1.07 B 5 Took the turbine off line for a planned EHC control card change-out 7/2/06 00:27. At 7/2/06 01:31 the Main Generator was synchronized to the grid. The reactor remained at approximately 18% power I I_ while the turbine was off line.
Summary:
The only power reduction greater than 20% this month was on July 1 in preparation for a planned turbine outage to replace a turbine EHC control card. The Turbine was put on line on July 2n. 100% power was also achieved on July 2rd.
- 1. 2. 3.
F. Forced Reason: Method:
S. Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Date: 08/15/2006 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
I OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 08/15/2006 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS
- 5. Unit Name: Susquehanna Steam Electric Station (U2)
- 6. Reporting Period: July 2006
- 7. Design Electrical Rating (Net MWe): 1182
- 8. Maximum Dependable Capacity (Net MWe): 1140 This Month Yr.-to-Date Cumulative
- 5. Hours in Reporting Period 744 5,087 188,160
- 6. Number of Hours Reactor Was Critical 744 4,957.8 165,629.5
- 7. Hours Generator On-Line 744 4,936.0 163,529.4
- 8. Unit Reserve Shutdown Hours 0 0 0
- 9. Net Electrical Energy Generated (MWH) 819,588 5,620,213 173,321,088 NOTES:
Page 1 of 1
I UNIT SHUTDOWNS DOCKET NO. 50-388 UNIT Two DATE 08/15/2006 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH July 2006 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
There were no shutdowns this month.
Summary: There were two power changes greater than 20% this month. On July V% 1 a power reduction to 70% was performed for a planned sequence exchange. On July 1 6 th a power reduction to 74% was performed to support transmission/distribution maintenance activities. 100% power was achieved on July 17 th
- 1. 2. 3.
F. Forced Reason: Method:
S. Scheduled A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 08/15/2006 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.