PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)
From kanterella
Jump to navigation
Jump to search
ML23115A354 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 04/25/2023 |
From: | Casulli E Susquehanna, Talen Energy |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
PLA-8041 | |
Download: ML23115A354 (1) | |
Similar Documents at Susquehanna | |
---|---|
Category:Calculation
MONTHYEARPLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024
[Table view]Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) ML16181A4172016-06-29029 June 2016 Projected Income Statement and Calculation of Six-Month Fixed Costs (Redacted) PLA-7455, Radioactive Effluent Release Report and Offsite Dose Calculation Manual2016-05-0202 May 2016 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-7322, Offsite Dose Calculation Manual, 2014 Annual Report2015-04-28028 April 2015 Offsite Dose Calculation Manual, 2014 Annual Report PLA-7163, Attachment 2 to PLA-7163: Offsite Dose Calculation Manual2014-04-23023 April 2014 Attachment 2 to PLA-7163: Offsite Dose Calculation Manual ML14042A1452014-01-10010 January 2014 Calculation Number EC-RADN-1125, Revision 5, Crhe and Off Site Post LOCA Doses. PLA-7131, Calculation Number EC-RADN-1129, Revision 4, DBA-LOCA Total Control Room Dose.2014-01-10010 January 2014 Calculation Number EC-RADN-1129, Revision 4, DBA-LOCA Total Control Room Dose. PLA-6998, Response to Request for Additional Information Regarding Changes to Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.19 to Increase Diesel Generator E Minimum Steady State Frequency PLA-69982013-05-10010 May 2013 Response to Request for Additional Information Regarding Changes to Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.19 to Increase Diesel Generator E Minimum Steady State Frequency PLA-6998 PLA-6997, Response to Request for Additional Information Regarding Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage2013-05-10010 May 2013 Response to Request for Additional Information Regarding Changes to Technical Specification Surveillance Requirements to Increase Diesel Generator Minimum Steady State Voltage PLA-6994, Annual Radioactive Effluent Release Report, Appendix a Through End2013-04-10010 April 2013 Annual Radioactive Effluent Release Report, Appendix a Through End PLA-6561, Amendment Request No. 296 to Unit 1 and Amendment Request No. 266 to Unit 2 Re Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1-1 and Editorial Change to TS 3.10.8.F, Response to RAI2009-09-11011 September 2009 Amendment Request No. 296 to Unit 1 and Amendment Request No. 266 to Unit 2 Re Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1-1 and Editorial Change to TS 3.10.8.F, Response to RAI ML0912006162008-11-25025 November 2008 Attachment 1 to PLA-6501, Calculation EC-037-001 ML0824211382008-07-0707 July 2008 Nuclear Engineering Calculation EC-RADN-1129, Revision 2, DBA-LOCA Total Control Room Dose ML0824211392008-06-30030 June 2008 Nuclear Engineering Calculation EC-RADN-1125, Revision 3, Crhe and Off Site Post LOCA Doses - AST ML0706702672006-12-0101 December 2006 Appendix to Attachment to PLA-6130 Arts/Mellla RBM Calculation ML0633104572006-11-10010 November 2006 Calculation EC-ENVR-1058, Rev 1, Crhe Accident Dispersion Factors (X/Q). ML0633104502006-11-10010 November 2006 Calculation EC-RADN-1128, Rev 1, Steam Line Break Accident Crhe & Off-Site Doses - Ast. ML0630601222006-03-13013 March 2006 Nuclear Engineering Calculation EC-059-1041, Rev. 02, Suppression Pool Ph Post Loca. ML0716203342006-01-24024 January 2006 GE Ne 0000-0038-8052 Susq-EPU-T506-MSLHiFlo-Calc-2006, Revision 0, Instrument Limits Calculation, PPL Susquehanna, LLC Susquehanna Steam Electric Station Units 1 and 2, Main Steam Line High Flow MSIV Isolation. ML0615204602005-12-0505 December 2005 Revised Calculation EC-RADN-1126, Revision 1 PLA-6130, Rev. 0 to 0000-0039-3825 Susq A-M T506-RBM-Calc-2005, Instrument Limits Calculation, PPL Susquehanna, LLC, Susquehanna Steam Electric Station Units 1 & 2, Rod Block Monitor (Numac ARTS-MELLA).2005-10-31031 October 2005 Rev. 0 to 0000-0039-3825 Susq A-M T506-RBM-Calc-2005, Instrument Limits Calculation, PPL Susquehanna, LLC, Susquehanna Steam Electric Station Units 1 & 2, Rod Block Monitor (Numac ARTS-MELLA). ML0601204882005-09-30030 September 2005 Calculation EC-RADN-1134, Impact of AST on Current NUREG-0737 Radiological Evaluations That Use TID-14844 DBA-LOCA Releases. ML0601204182005-09-21021 September 2005 Calculation NEPM-QA-0221-1, Assessment of Sblc System for Suppression Pool Ph Control. ML0601204212005-09-20020 September 2005 Calculation EC-059-1041, Suppression Pool Ph Post Loca. ML0601204292005-09-0606 September 2005 Calculation EC-RADN-1129, DBA-LOCA Total Control Room Dose. PLA-5963, Calculation EC-RADN-1135, Justification of AST 60 Isotope Radtrad Source Term for Direct Shine.2005-09-0101 September 2005 Calculation EC-RADN-1135, Justification of AST 60 Isotope Radtrad Source Term for Direct Shine. ML0601204832005-08-23023 August 2005 Calculation EC-RADN-1125, Crhe and Off Site Post LOCA Doses - Ast. ML0601204872005-08-19019 August 2005 Calculation EC-RADN-1127, Control Rod Drop Accident Crhe and Off Site Doses - Ast. ML0601204852005-08-19019 August 2005 Calculation, EC-RADM-1126, Crhe and Off Site Fha/Eha Doses - Ast. ML0601203642005-08-19019 August 2005 Calculation EC-RADN-1128, Steam Line Break Accident Crhe and Off Site Doses -AST. ML0601204792005-07-19019 July 2005 Calculation EC-ENVR-1059, Crhe Accident Dispersion Factors (X/Q) RB U2 Intake. ML0601204782005-07-19019 July 2005 Calculation EC-ENVR-1058, Crhe Accident Dispersion Factors (X/Q). ML0601203562005-04-18018 April 2005 Calculation EC-ENVR-1057, Offsite X/Q Values for the SSES Base on 1999-2003 Meteorological Data. ML0718001572004-10-0808 October 2004 Calculation EC-041-0508, Rev. 4, Cooling Tower Evaporation and Blowdown Rates for Power. 2024-04-22 Category:Letter type:PLA MONTHYEARPLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024
[Table view]Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owners Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owners Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 2024-09-18 Category:Periodic Monitoring Report (Radiological/Environmental) MONTHYEARPLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023
[Table view]Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-7769, Annual Radiological Environmental Operating Report (PLA-7769)2019-04-15015 April 2019 Annual Radiological Environmental Operating Report (PLA-7769) ML14126A4542014-04-23023 April 2014 Attachment 1 to PLA-7163: Radioactive Effluent Release Report for Susquehanna, Units 1 & 2, Report Period: 01/01/13 - 12/31/13 PLA-6833, Attachment 2 to PLA-6833, ODCM-QA-001, Revision 3, Offsite Dose Calculation Manual2011-12-31031 December 2011 Attachment 2 to PLA-6833, ODCM-QA-001, Revision 3, Offsite Dose Calculation Manual ML12122A9772011-12-31031 December 2011 Annual Report 2011 Radioactive Effluent Release Report PLA-6720, Radiological Environmental Operating Report for the Calendar Year 20102011-05-0606 May 2011 Radiological Environmental Operating Report for the Calendar Year 2010 PLA-5623, Annual Radiological Environmental Operating Report, Ambient Radiation Monitoring, Pages 18 - 522003-04-30030 April 2003 Annual Radiological Environmental Operating Report, Ambient Radiation Monitoring, Pages 18 - 52 2023-04-25 |