ML060260286

From kanterella
Jump to navigation Jump to search
December 2005 Monthly Operating Report for Susquehanna Units 1 & 2
ML060260286
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/13/2006
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-006010
Download: ML060260286 (7)


Text

Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com I* %SAI

  • a I
  • 0 TM January 13, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA - 006010 The December 2005 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Robernace JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blamey NRC Project Manager, Mr. R V. Guzman

,s,-

-e2-L4

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01/13/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

SusQuehanna Steam Electric Station (Ul)

2.

Reporting Period:

December 2005

3.

Design Electrical Rating (Net MWe):

1177

4.

Maximum Dependable Capacity (Net MWe):

I 135

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

864,760 Yr.-to-Date 8,760.0 8,389.6 8,357.1 0

9,442,616 Cumulative 197,833.0 166,377.5 163,957.1 0

170,083,058 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01/13/2006 J. J. Hennings (570) 542-3747 REPORT MONTH December 2005 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor3~

No reactor shutdowns this month.

Summary: There were no power reductions greater than 20% this month.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G-Operational Error (Explain) 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page I of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.

Date:

01/13/06 Telephone:

(570) 542-3747

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/13/06 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susguehanna Steam Electric Station (U2)

6.

Reporting Period:

December 2005

7.

Design Electrical Rating (Net MWe):

1182

8.

Maximum Dependable Capacity (Net MWe):

.[ 140

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

NOTES:

This Month 744 744 744 0

864,495 Yr.-to-Date 8,760.0 7,991.9 7,900.8 0

8,885,735 Cumulative 183,073.0 160,671.7 158,593.5 0

167,700,874 Page 1 of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/13/2006 J. J. Hennings (570) 542-3747 REPORT MONTH December 2005 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No reactor shutdowns this month.

Summary: The only power change greater than 20% this month was on 12/02/2005 for a planned sequence exchange at 71% power. Reactor power was returned to 100% on 12/04/2005.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

01/13/06 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.