PLA-0055, December 2002 Monthly Operating Report for Susquehanna
| ML030230724 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 01/13/2003 |
| From: | Richard Anderson Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-005578, R41-2A | |
| Download: ML030230724 (7) | |
Text
Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542 3883 Fax 570 542 1504 RLAnderson @ pplweb com p.
j
'TM January 13, 2003 U. S. Nuclear Regulatory Commission Attn. Document Control Desk Mail Station OPI-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005578 R41-2A The December 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Richard L. Anderson JJHncmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. T. G. Colburn NRC Project Manager, Mr. E. M. Thomas
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 0111312003 J. J. Hennings (570) 542-3747 OPERATING STATUS Unit Name:
Susquehanna Steam Electric Station (U I)
Reporting Period:
December 2002 Design Electrical Rating (Net MWe):
1115 Maximum Dependable Capacity (Net MWe):
1105 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
831,887 NOTES:
Page 1 of 1
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
9.
Yr.-to-Date 8760 7562.3 7493.8 0
8,026,620 Cumulative 171,529 141,864.5 139,653.8 0
143,253,529 I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01/13/03 J. J. Hennings (570) 542-3747 REPORT MONTH December 2002
- 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
- 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.
- 1.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Date:
01/13/03 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/13/03 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U2)
- 2.
Reporting Period:
December 2002
- 3.
Design Electrical Rating (Net MWe):
1117
- 4.
Maximum Dependable Capacity (Net MWe):
1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
827,061
- 5.
- 6.
- 7.
- 8.
9.
Yr.-to-Date 8760 8,492.4 8,440.0 0
9,306,164 Cumulative 156,769 136,149.4 134,206.7 0
140,110,994 NOTES:
Page 1 of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/13/03 J. J. Hennings (570) 542-3747 REPORT MONTH December 2002 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No Shutdowns this month.
Summary: Power reductions of approximately 10% were conducted for control rod adjustments on 12/7 and 12/14.
Maintenance was also performed at approximately 90% power on Turbine/EHC (12/14) and-control rod drive HCU's on 12/20. An additional control rod adjustment was performed on 12/21 at 78% power. More frequent control rod adjustments are required because the core is nearing the end of its full power capacity for fuel cycle 11.
3.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other 1.
F. Forced S. Scheduled 2.
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
01/13/03 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challen2es to Main Steam Safety Relief Valves None.