Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson @ pplweb.com il pp1l sea ie I
PP T
September 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005525 R41-2A The August 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. T. G. Colburn NRC Project Manager, Mr. E. M. Thomas
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 9-13-02 J. J. Hennings (570) 542-3747 OPERATING STATUS Unit Name:
Susquehanna Steam Electric Station (Ul)
Reporting Period:
August 2002 Design Electrical Rating (Net MWe):
1115 Maximum Dependable Capacity (Net MWe):
1105 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
813,781 I.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
9.
Yr.-to-Date 5.831 4,633.3 4,564.8 0
4,793,246 Cumulative 168,600 138,935.5 136,724.8 0
140,020,155 NOTES:
Page 1 of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 9/13/02 J. J. Hennings (570) 542-3747 REPORT MONTH August 2002 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.
Summary: The only significant power change during August was for a planned Control Rod Sequence Exchange on August 10.
- 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
- 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other
- 1.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Date:
9/13/02 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 9-13-02 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U2)
- 2.
Reporting Period:
August 2002
- 3.
Design Electrical Rating (Net MWe):
1117
- 4.
Maximum Dependable Capacity (Net MWe):
1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
812,866 NOTES:
Page 1 of I
- 5.
- 6.
- 7.
- 8.
9.
Yr.-to-Date 5,831 5,831 5,831 0
6,431,393 Cumulative 153,840 133,488.0 131,597.7 0
137,236,223
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 9-13-02 J. J. Hennings (570) 542-3747 REPORT MONTH July 2002
- 1.
- 2.
3.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other No.
Date Type Duration Reason Method of Cause & Corrective Action 1
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No Shutdowns this month.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Completed by:
J. J. Hennings Date:
9-13-02 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.