ML022750373
ML022750373 | |
Person / Time | |
---|---|
Site: | Susquehanna ![]() |
Issue date: | 09/13/2002 |
From: | Richard Anderson Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML022750373 (7) | |
Text
,%
- il .
Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 pp1l PP sea ie I T
Tel. 570.542.3883 Fax 570.542.1504 RLAnderson @ pplweb.com September 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005525 R41-2A The August 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. T. G. Colburn NRC Project Manager, Mr. E. M. Thomas
OPERATING DATA REPORT DOCKET NO. 50-387 UNIT One DATE 9-13-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS I. Unit Name: Susquehanna Steam Electric Station (Ul)
- 2. Reporting Period: August 2002
- 3. Design Electrical Rating (Net MWe): 1115
- 4. Maximum Dependable Capacity (Net MWe): 1105 This Month Yr.-to-Date Cumulative
- 5. Hours in Reporting Period 744 5.831 168,600
- 6. Number of Hours Reactor Was Critical 744 4,633.3 138,935.5
- 7. Hours Generator On-Line 744 4,564.8 136,724.8
- 8. Unit Reserve Shutdown Hours 0 0 0
- 9. Net Electrical Energy Generated (MWH) 813,781 4,793,246 140,020,155 NOTES:
Page 1 of I
UNIT SHUTDOWNS DOCKET NO. 50-387 UNIT One DATE 9/13/02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH August 2002 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.
Summary: The only significant power change during August was for a planned Control Rod Sequence Exchange on August 10.
- 1. 2. 3.
F. Forced Reason: Method:
S. Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)
Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Date: 9/13/02 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 9-13-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS
- 1. Unit Name: Susquehanna Steam Electric Station (U2)
- 2. Reporting Period: August 2002
- 3. Design Electrical Rating (Net MWe): 1117
- 4. Maximum Dependable Capacity (Net MWe): 1111 This Month Yr.-to-Date Cumulative
- 5. Hours in Reporting Period 744 5,831 153,840
- 6. Number of Hours Reactor Was Critical 744 5,831 133,488.0
- 7. Hours Generator On-Line 744 5,831 131,597.7
- 8. Unit Reserve Shutdown Hours 0 0 0
- 9. Net Electrical Energy Generated (MWH) 812,866 6,431,393 137,236,223 NOTES:
Page 1 of I
UNIT SHUTDOWNS DOCKET NO. 50-388 UNIT Two DATE 9-13-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH July 2002 No. Date Type Duration Reason Method of Cause & Corrective Action 1 (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No Shutdowns this month.
- 1. 2. 3.
F. Forced Reason: Method:
S. Scheduled A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)
Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date: 9-13-02 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.