|
---|
Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] Category:License-Monthly Operating Report
MONTHYEARPLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0623501472006-08-15015 August 2006 Monthly Operating Reports PLA-0060, June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22006-07-14014 July 2006 June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 ML0618703972006-06-15015 June 2006 May 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0614405052006-05-15015 May 2006 April 2006 Monthly Operating Report for Susquehanna Units 1 & 2 ML0611601332006-04-14014 April 2006 March 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 & 2 ML0608704012006-03-10010 March 2006 February 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0605304122006-02-13013 February 2006 Susquehanna Units 1 and 2 Monthly Operating Reports for January 2006 ML0602602862006-01-13013 January 2006 December 2005 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0059, November 2005 Operating Report for Susquehanna, Units 1 and 22005-12-12012 December 2005 November 2005 Operating Report for Susquehanna, Units 1 and 2 PLA-0596, August 2005 Monthly Operating Report for Susquehanna Units 1 and 22005-09-14014 September 2005 August 2005 Monthly Operating Report for Susquehanna Units 1 and 2 PLA-0000, June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 22005-07-13013 July 2005 June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 2 PLA-0589, April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22005-05-10010 May 2005 April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 PLA-0058, March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 22005-04-13013 April 2005 March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0436304132004-12-13013 December 2004 November 2004 Monthly Operating Report, Susquehanna Steam Electric Station PLA-0057, July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station2004-08-13013 August 2004 July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station PLA-0056, October 2003 Monthly Operating Report for Susquehanna, Units 1 & 22003-11-13013 November 2003 October 2003 Monthly Operating Report for Susquehanna, Units 1 & 2 PLA-0055, December 2002 Monthly Operating Report for Susquehanna2003-01-13013 January 2003 December 2002 Monthly Operating Report for Susquehanna PLA-5574, November 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-12-13013 December 2002 November 2002 Monthly Operating Report for Susquehanna Steam Electric Station ML0227503732002-09-13013 September 2002 August 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0005, July 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-08-14014 August 2002 July 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0054, June 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-07-12012 July 2002 June 2002 Monthly Operating Report for Susquehanna Steam Electric Station PLA-0545, February 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-03-13013 March 2002 February 2002 Monthly Operating Report for Susquehanna Units 1 & 2 2006-09-14
[Table view] |
Text
Robert A. Saccone Vice President
-Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com ppl Ti v TM April 14,2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop, O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA -006052 The March 2006 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.Very truly yours, Rober. Saccone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blarney NRC Project Manager, Mr. R V. Guzman-- -:qF:,
OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/12/2006 J. J. Hennings (570) 542-3747 1.2.3.4.OPERATING STATUS Unit Name: Susguehanna Steam Electric Station (Ul)Reporting Period: March 2006 Design Electrical Rating (Net MWe): 1177 Maximum Dependable Capacity (Net MWe): 1135 5.6.7.8.9.Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)This Month 744 79.12 72.03 0 71,631 Yr.-to-Date 2160.0 1495.1 1488.03 0 1,689,903 Cumulative 199,993.0 168,872.6 165,445.1 0 171,772,961 NOTES: Page 1 of I UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/12/2006 J. J. Hennings (570) 542-3747 REPORT MONTH March 2006 No.Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 1 3/4/06 S 671.97 C 5 Reactor shutdown on March 4,2006 for refueling (continuing) (Soft Shut- outage 14.down)[Summary: 1.F. Forced S. Scheduled 2.Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)3.Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page I of I SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.Date: 04/12/06 Telephone:
(570) 542-3747 OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/12/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS 5. Unit Name: Susquehanna Steam Electric Station (U2)6. Reporting Period: March 2006 7. Design Electrical Rating (Net MWe): 1182 8. Maximum Dependable Capacity (Net MWe): 1140 5. Hours in Reporting Period 6. Number of Hours Reactor Was Critical 7. Hours Generator On-Line 8. Unit Reserve Shutdown Hours 9. Net Electrical Energy Generated (MWH)NOTES: This Month 744 744 744 0 865,432 Yr.-to-Date 2160 2160 2160 0 2,511,432 Cumulative 185,233 162,831.7 160,753.5 0 170,212,306 Page I of I UNIT SHUTDOWNS 4 DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/12/2006 J. J. Hennings (570) 542-3747 REPORT MONTH March 2006 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor N 3 s No reactor shutdowns this month.Summary: The one power change greater than 20% this month was a reduction of 27% for a planned Control Rod adjustment and scram time testing starting on 3/10/06.1.2.3.F. Forced S. Scheduled Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page 1 of I SUSOUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 04/12/2006 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.