Text

Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com ppl Ti v TM April 14,2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop, O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA -006052 The March 2006 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.

Very truly yours, Rober.

Saccone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blarney NRC Project Manager, Mr. R V. Guzman

-:q

- 1 F:,

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/12/2006 J. J. Hennings (570) 542-3747 1.

2.

3.

4.

OPERATING STATUS Unit Name:

Susguehanna Steam Electric Station (Ul)

Reporting Period:

March 2006 Design Electrical Rating (Net MWe):

1177 Maximum Dependable Capacity (Net MWe):

1135 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 79.12 72.03 0

71,631 Yr.-to-Date 2160.0 1495.1 1488.03 0

1,689,903 Cumulative 199,993.0 168,872.6 165,445.1 0

171,772,961 NOTES:

Page 1 of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 04/12/2006 J. J. Hennings (570) 542-3747 REPORT MONTH March 2006 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 1

3/4/06 S

671.97 C

5 Reactor shutdown on March 4,2006 for refueling (continuing)

(Soft Shut-outage 14.

down)

[Summary:

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) 3.

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page I of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by:

J. J. Hennings Challenges to Main Steam Safety Relief Valves None.

Date:

04/12/06 Telephone:

(570) 542-3747

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/12/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susquehanna Steam Electric Station (U2)

6. Reporting Period:

March 2006

7.

Design Electrical Rating (Net MWe):

1182

8.

Maximum Dependable Capacity (Net MWe):

1140

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

NOTES:

This Month 744 744 744 0

865,432 Yr.-to-Date 2160 2160 2160 0

2,511,432 Cumulative 185,233 162,831.7 160,753.5 0

170,212,306 Page I of I

UNIT SHUTDOWNS

pNN 4

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 04/12/2006 J. J. Hennings (570) 542-3747 REPORT MONTH March 2006 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor N

3 s

No reactor shutdowns this month.

Summary: The one power change greater than 20% this month was a reduction of 27% for a planned Control Rod adjustment and scram time testing starting on 3/10/06.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of I

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

04/12/2006 Completed by:

J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.