Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement
Results
Other: ML062960009, ML063040075, ML063050355, ML063050363, ML063050370, ML063050590, ML063050595, ML063050608, ML063100474, ML063470607, ML070320537, ML070320542, ML070320564, ML070320567, ML070320592, ML070320601, ML070320605, ML070320657, ML070320662, ML070320667, ML070320671, ML070320676, ML070320680, ML070320719, ML070320721, ML070320728, ML070320733, ML070320740, ML070320745, ML070320756, ML070320784, ML070320787, ML070320791, ML070320802, ML070320803, ML070320806, ML070570480, ML070590453, ML070590456, ML070610479, ML070710153, ML070710154, ML070710155, ML070710159, ML070710161, ML070720347, ML070800414, ML070800420, ML070800423, ML070800434... further results
|
MONTHYEARML0802302892002-12-31031 December 2002 Pennsylvania Bureau of Radiation Protection, Environmental Radiation in Pennsylvania: 2001-2002 Annual Report Project stage: Other ML0802804772002-12-31031 December 2002 Information on Haliaeetus Leucocephalus - Bald Eagle Project stage: Other ML0802303352003-05-31031 May 2003 Lackawanna-Luzerne Counties, Long Range Transportation Plan for the Lackawanna-Luzeme Transportation Study Area (2003-2025). Project stage: Other ML0802303182004-02-24024 February 2004 Pennsylvania Game Commission, C. Fergus, Wood Warblers. Project stage: Other ML0802204462004-07-22022 July 2004 U.S. Census Bureau. Pennsylvania Quickfacts: Columbia County Project stage: Other ML0802204452004-07-22022 July 2004 U.S. Census Bureau - Pennsylvania Quickfacts Luzerne County Project stage: Other ML0802303142004-07-26026 July 2004 Pennsylvania Department of Transportation, Traffic Volume Maps, Luzerne and Columbia Counties, 2002 Project stage: Other ML0802303242004-07-27027 July 2004 U.S. Environmental Protection Agency, Local Drinking Water Information - Pennsylvania Drinking Water Project stage: Other ML0802204562004-08-18018 August 2004 Riverlands Environmental Preserve - General Information Project stage: Other ML0802302562004-11-10010 November 2004 King'S College, the Pennsylvania Marketing and Planning Center, Excerpts Project stage: Other ML0802303322005-03-31031 March 2005 U.S. Environmental Protection Agency, Brownfields Cleanup and Redevelopment: Brownfields Cleanup Revolving Loan Fund Pilot Fact Sheet on Luzerne County, PA Project stage: Other ML0802303262005-10-12012 October 2005 Centers for Disease Control & Prevention, Legionellosis: Legionnaires' Disease (Ld) and Pontiac Fever. Project stage: Other ML0802303172005-12-0606 December 2005 Pennsylvania Department of Environmental Protection, Standards for Cleanup, Reuse of Hazleton Mine Reclamation Project Project stage: Other ML0802303342005-12-31031 December 2005 River Basin Commission, Susquehanna River Basin Commission Gis Program., Excerpt, Middle Susquehanna Subbasin. Project stage: Other ML0623501472006-08-15015 August 2006 Monthly Operating Reports Project stage: Request ML0626201572006-09-13013 September 2006 Application for Renewed Operating Licenses Project stage: Request ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 Project stage: Request ML0703206572006-10-0303 October 2006 Email from Allison Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208032006-10-0303 October 2006 Email from Nash Regarding Consultation Letters on American Shad in the Susquehanna River Project stage: Other ML0703206012006-10-0505 October 2006 E-mail from Metz Regarding the Susquehanna Steam Electric Station Data Assessment Project stage: Other ML0703206052006-10-0505 October 2006 Email from Moret Regarding the Susquehanna Steam Electric Station Category 1 & 2 Issues Project stage: Other ML0703207982006-10-0505 October 2006 Email from Klementowicz Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Acceptance Review ML0703206672006-10-0606 October 2006 E-mail from O'Rourke Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206802006-10-0606 October 2006 Email from Avci Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208002006-10-0606 October 2006 Email from Davis Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Acceptance Review ML0703205672006-10-0707 October 2006 E-mail from Vinikour Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703205922006-10-0909 October 2006 E-mail from Monette Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206622006-10-0909 October 2006 E-Mail from Lazaro Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703206762006-10-0909 October 2006 E-mail from Lagory Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703208022006-10-0909 October 2006 Email from Monette to Mullins Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0703205642006-10-0909 October 2006 Email from Wescott Regarding the Environmental Report (Er) Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other PLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 Project stage: Request ML0703208062006-10-16016 October 2006 Acceptance Review Checklist from Mullins Regarding the Susquehanna Steam Electric Station Environmental Report Project stage: Other ML0629600792006-10-24024 October 2006 Maintenance of Reference Materials at the Mill Memorial Library, Related to the Review of the Susquehanna Steam Electric Station License Renewal Application Project stage: Approval ML0629600602006-10-26026 October 2006 Maintenance of Reference Materials at the Berwick Public Library, Related to the Review of the Susquehanna Steam Electric Station License Renewal Application Project stage: Approval ML0703206712006-10-31031 October 2006 E-mail from Quinn Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review Project stage: Other ML0629600492006-11-0101 November 2006 50 Mile Vicinity Map Project stage: Request ML0629600092006-11-0101 November 2006 License Renewal Application Review (Shpo No. 05-1588-079-A) Project stage: Other PLA-6133, Acceptability and Sufficiency for Docketing - Application for Renewed Operating Licenses Numbers NPF-14 and NPF-222006-11-0202 November 2006 Acceptability and Sufficiency for Docketing - Application for Renewed Operating Licenses Numbers NPF-14 and NPF-22 Project stage: Request ML0703207842006-11-0606 November 2006 Email from Franovich Regarding Questions on Consultation Letters Project stage: Other ML0630503632006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Oneida Nation Wisconsin Project stage: Other ML0630503552006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Eastern Shawnee Tribe Oklahoma Project stage: Other ML0630505952006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Shawnee Tribe Project stage: Other ML0630505902006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Onondaga Nation - Gonyea Project stage: Other ML0630506082006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Mohican Nation Project stage: Other ML0630503702006-11-14014 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Shawnee Tribe Oklahoma Project stage: Other ML0633302792006-11-15015 November 2006 (Units 1 & 2) Afternoon Public Meeting Project stage: Meeting ML0633302812006-11-15015 November 2006 Transcript of Susquehanna Steam Electric Station (Units 1 and 2) Evening Public Meeting on November 15, 2006, Pages 1-46 Project stage: Meeting ML0632401502006-11-15015 November 2006 11/15/06 Environmental Scoping Meeting Slide Handouts Project stage: Request ML0630400752006-11-15015 November 2006 Request for Comments Concerning the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application Review. Letter to Tonawanda Band of Seneca Project stage: Other 2006-10-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A1252024-10-22022 October 2024 – Authorized Alternative to Requirements of the ASME OM Code PLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) 05000387/LER-2024-001, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-01-0909 January 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) 2024-09-06
[Table view] Category:License-Monthly Operating Report
MONTHYEARPLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0623501472006-08-15015 August 2006 Monthly Operating Reports PLA-0060, June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22006-07-14014 July 2006 June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 ML0618703972006-06-15015 June 2006 May 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0614405052006-05-15015 May 2006 April 2006 Monthly Operating Report for Susquehanna Units 1 & 2 ML0611601332006-04-14014 April 2006 March 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 & 2 ML0608704012006-03-10010 March 2006 February 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0605304122006-02-13013 February 2006 Susquehanna Units 1 and 2 Monthly Operating Reports for January 2006 ML0602602862006-01-13013 January 2006 December 2005 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0059, November 2005 Operating Report for Susquehanna, Units 1 and 22005-12-12012 December 2005 November 2005 Operating Report for Susquehanna, Units 1 and 2 PLA-0596, August 2005 Monthly Operating Report for Susquehanna Units 1 and 22005-09-14014 September 2005 August 2005 Monthly Operating Report for Susquehanna Units 1 and 2 PLA-0000, June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 22005-07-13013 July 2005 June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 2 PLA-0589, April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22005-05-10010 May 2005 April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 PLA-0058, March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 22005-04-13013 April 2005 March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0436304132004-12-13013 December 2004 November 2004 Monthly Operating Report, Susquehanna Steam Electric Station PLA-0057, July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station2004-08-13013 August 2004 July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station PLA-0056, October 2003 Monthly Operating Report for Susquehanna, Units 1 & 22003-11-13013 November 2003 October 2003 Monthly Operating Report for Susquehanna, Units 1 & 2 PLA-0055, December 2002 Monthly Operating Report for Susquehanna2003-01-13013 January 2003 December 2002 Monthly Operating Report for Susquehanna PLA-5574, November 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-12-13013 December 2002 November 2002 Monthly Operating Report for Susquehanna Steam Electric Station ML0227503732002-09-13013 September 2002 August 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0005, July 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-08-14014 August 2002 July 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0054, June 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-07-12012 July 2002 June 2002 Monthly Operating Report for Susquehanna Steam Electric Station PLA-0545, February 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-03-13013 March 2002 February 2002 Monthly Operating Report for Susquehanna Units 1 & 2 2006-09-14
[Table view] |
Text
%
Robert A. Saccone PPL Susquehanna, LLC Vice President - Nuclear Operations 769 Salem/Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 .. TM RASaccone@pplweb.com August 15, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA - 006106 The July 2006 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Robert A. Saccone JJH/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blamey NRC Project Manager, Mr. R V. Guzman
OPERATING DATA REPORT DOCKET NO. 50-387 UNIT One DATE 08/15/2006 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS I. Unit Name: Susquehanna Steam Electric Station (Ul)
- 2. Reporting Period: July 2006
- 3. Design Electrical Rating (Net MWe): 1177
- 4. Maximum Dependable Capacity (Net MWe): 1135 This Month Yr.-to-Date Cumulative
- 5. Hours in Reporting Period 744 5087.0 202920.0
- 6. Number of Hours Reactor Was Critical 744 4122.7 170490.2
- 7. Hours Generator On-Line 742.93 4059.7 168016.8
- 8. Unit Reserve Shutdown Hours 0 0 0
- 9. Net Electrical Energy Generated (MWH) 824,263 4,536,857 174,619,915 NOTES:
Page I of I
UNIT SHUTDOWNS 1'
DOCKET NO. 50-387 UNIT One DATE 08/15/2006 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH July 2006 No.
Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 3 7/2/06 S 1.07 B 5 Took the turbine off line for a planned EHC control card change-out 7/2/06 00:27. At 7/2/06 01:31 the Main Generator was synchronized to the grid. The reactor remained at approximately 18% power I I_ while the turbine was off line.
Summary:
The only power reduction greater than 20% this month was on July 1 in preparation for a planned turbine outage to replace a turbine EHC control card. The Turbine was put on line on July 2n. 100% power was also achieved on July 2rd.
- 1. 2. 3.
F. Forced Reason: Method:
S. Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Date: 08/15/2006 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
I OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 08/15/2006 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS
- 5. Unit Name: Susquehanna Steam Electric Station (U2)
- 6. Reporting Period: July 2006
- 7. Design Electrical Rating (Net MWe): 1182
- 8. Maximum Dependable Capacity (Net MWe): 1140 This Month Yr.-to-Date Cumulative
- 5. Hours in Reporting Period 744 5,087 188,160
- 6. Number of Hours Reactor Was Critical 744 4,957.8 165,629.5
- 7. Hours Generator On-Line 744 4,936.0 163,529.4
- 8. Unit Reserve Shutdown Hours 0 0 0
- 9. Net Electrical Energy Generated (MWH) 819,588 5,620,213 173,321,088 NOTES:
Page 1 of 1
I UNIT SHUTDOWNS DOCKET NO. 50-388 UNIT Two DATE 08/15/2006 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH July 2006 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
There were no shutdowns this month.
Summary: There were two power changes greater than 20% this month. On July V% 1 a power reduction to 70% was performed for a planned sequence exchange. On July 1 6 th a power reduction to 74% was performed to support transmission/distribution maintenance activities. 100% power was achieved on July 17 th
- 1. 2. 3.
F. Forced Reason: Method:
S. Scheduled A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 08/15/2006 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.