PLA-0596, August 2005 Monthly Operating Report for Susquehanna Units 1 and 2

From kanterella
Jump to navigation Jump to search
August 2005 Monthly Operating Report for Susquehanna Units 1 and 2
ML052700241
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/14/2005
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-05964
Download: ML052700241 (7)


Text

.I', _

Robert A.Saccone PPL Susquehanna, LLC Vice President - Nuclear Operations 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504

% TM RASaccone@pplweb.com September 14, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-05964 The August 2005 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.

Very truly yours,

.tOacon5 JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. F. Jaxheimer NRC Project Manager, Mr. R V. Guzman J-- & --)

, Qf

OPERATING DATA REPORT DOCKET NO. 50-387 UNIT One DATE 09/12/2005 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

1. Unit Name: Susquehanna Steam Electric Station (UI)
2. Reporting Period: August 2005
3. Design Electrical Rating (Net MWe): 1177
4. Maximum Dependable Capacity (Net MWe): 1135 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 744 5831.0 194,904.0
6. Number of Hours Reactor Was Critical 744 5831.0 163,819.0
7. Hours Generator On-Line 744 5831.0 161,431.0
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 824,509 6,603,588 167.244,030 NOTES:

Page 1of 1

. 4 ,, t.

i, UNIT SHUTDOWNS k -

DOCKET NO.- 50-387 UNIT One DATE 09/12/2005 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH August 2005 No.

Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Reactor shutdowns this month Summary The only power change greater than 20% was on 8/05/05 for planned control rod stroking and timing.

Power was reduced to 70% and returned to 100% power on 8/07/05.

1. 2. 3.

F. Forced Reason: Method:

S. Scheduled A- Equipment Failure (Explain) I - Manual B- Maintenance or Test 2 - Manual Scram C- Refueling 3 - Automatic Scram D- Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Date- 09112/05 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 09/12/05 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

5. Unit Name: Susquehanna Steam Electric Station (U2)
6. Reporting Period: August 2005
7. Design Electrical Rating (Net MWe): 1182
8. Maximum Dependable Capacity (Net MWe): 1140 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 744 5,831 180,144
6. Number of Hours Reactor Was Critical 744 5,062.9 157,742.7
7. Hours Generator On-Line 744 4,971.8 155,664.5
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 836,514 5,518,037 164,333.177 NOTES:

Page I of I

UNIT SHUTDOWNS DOCKET NO. 50-388 UNIT Two DATE 09/12/05 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH August 2005 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor 1 ~3 No reactor shutdowns this month.

Summary: No power changes greater than 20 % were performed this month.

1. 2. 3.

F. Forced Reason: Method:

S. Scheduled A- Equipment Failure (Explain) I - Manual B- Maintenance or Test 2 - Manual Scram C- Refueling 3 - Automatic Scram D- Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number: 50:388 Date: 09112/105 Completed by: J. J. Iennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.