April 2006 Monthly Operating Report for Susquehanna Units 1 & 2
ML061440505
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/15/2006
From: Saccone R A
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-006065
Download: ML061440505 (7)


Text

?F' -i I J..TM Robert A. Saccone Vice President

-Nuclear Operations PPL Susquehanna, LLC 769 Salem/Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com May 15, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA -006065 The April 2006 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.Very truly yours, oet.Saccone JJII/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blarney NRC Project Manager, Mr. R V. Guzman

/a OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/15/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.2.3.4.Unit Name: Susquehanna Steam Electric Station (U1)Reporting Period: April 2006 Design Electrical Rating (Net MWe): 1177 Maximum Dependable Capacity (Net MWe): 1135 5.6.7.8.9.Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)This Month 719 483.77 451.05 0 473,410 Yr.-to-Date 2879 1978.9 1939.1 0 2,163,313 Cumulative 200,712.0 168,356.4 165,896.2 0 172,246,370 NOTES: Page I of 1 UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/15/2006 J. J. Hennings (570) 542-3747 REPORT MONTH April 2006 Cause & Corrective Action To Prevent Recurrence Reactor shutdown on March 4, 2006 for refueling outage 14. Reactor critical on 4/10/06 and reached 100% on 4/15/06.I Summary: Following startup from the refueling outage there were no power reductions greater than 20% this month.1.F. Forced S. Scheduled 2.Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)3.Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page 1 of I SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Completed by: J. J. Hemiings Challenges to Main Steam Safety Relief Valves Date: 05/15/2006 Teleplionie:

(570) 542-3747 None.

Z1I OPERATING DATA REPORT DOCKET NO, UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/15/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS 5. Unit Name: Susquehanna Steam Electric Station (U2)6. Reporting Period: April 2006 7. Design Electrical Rating (Net MWe): 1182 8. Maximum Dependable Capacity (Net MWe): 1140 5. Hours in Reporting Period 6. Number of Hours Reactor Was Critical 7. Hours Generator On-Line 8. Unit Reserve Shutdown Hours 9. Net Electrical Energy Generated (MWH)NOTES: This Month 719 677.32 671 0 771,371 Yr.-to-Date 2,879 2,837.3 2,831.0 0 3,282,803 Cumulative 185,952.0 163,509.0 161,424.5 0 170,983,678 Previous Month Correction:

The Cumulative value for "Number of Hours Reactor Was Critical", as stated in the March Monthly Operating Report was 168,872.6.

The correct value of 167,872.6 Hrs was reported to the INPO Consolidated Data Entry (CDE) program. The values input to CDE did not need revision.

This identification of the typographical error on Letter PLA-006052 is to ensure the hard copy record agrees the electronically transmitted data. 167,872.6 Hrs is the correct value for "Number of Hours Reactor Was Critical" as of the end of March 2006. The April report and subsequent reports will use this value when calculating future cumulative data for CDE and hard copy letters.Page 1 of 1 UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/15/2006 J. J. Hennings (570) 542-3747 REPORT MONTH April 2006 No. Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3 1 4/29/06 S 48.0 B 5 Reactor shutdown on 4/29/06 for a planned outage to (continuing) (soft correct drywell leakage.shutdown)Summary: Other than the Reactor Shutdown there were no power changes greater than 20% this month.1.2.3.F. Forced S. Scheduled Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page I of 1

,. z SUSQUEHANNA STEAM ELECTRIC STATION Docket Number
50-388 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves Date: 05/15/2006 Telephone:

(570) 542-3747 None.