|
---|
Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] Category:License-Monthly Operating Report
MONTHYEARPLA-0061, September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 22006-10-13013 October 2006 September 2006 Monthly Operating Report for Susquehanna Steam Electric Station Units 1 and 2 ML0626904702006-09-14014 September 2006 August 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0623501472006-08-15015 August 2006 Monthly Operating Reports PLA-0060, June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22006-07-14014 July 2006 June 2006 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 ML0618703972006-06-15015 June 2006 May 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0614405052006-05-15015 May 2006 April 2006 Monthly Operating Report for Susquehanna Units 1 & 2 ML0611601332006-04-14014 April 2006 March 2006 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 & 2 ML0608704012006-03-10010 March 2006 February 2006 Monthly Operating Report for Susquehanna Units 1 and 2 ML0605304122006-02-13013 February 2006 Susquehanna Units 1 and 2 Monthly Operating Reports for January 2006 ML0602602862006-01-13013 January 2006 December 2005 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0059, November 2005 Operating Report for Susquehanna, Units 1 and 22005-12-12012 December 2005 November 2005 Operating Report for Susquehanna, Units 1 and 2 PLA-0596, August 2005 Monthly Operating Report for Susquehanna Units 1 and 22005-09-14014 September 2005 August 2005 Monthly Operating Report for Susquehanna Units 1 and 2 PLA-0000, June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 22005-07-13013 July 2005 June 2005 Monthly Operating Reports for Susquehanna Ses Units 1 and 2 PLA-0589, April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 22005-05-10010 May 2005 April 2005 Monthly Operating Reports for Susquehanna Steam Electric Station Units 1 and 2 PLA-0058, March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 22005-04-13013 April 2005 March 2005 Monthly Operating Report for Susquehanna Steam Electric Station, Units 1 and 2 ML0436304132004-12-13013 December 2004 November 2004 Monthly Operating Report, Susquehanna Steam Electric Station PLA-0057, July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station2004-08-13013 August 2004 July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station PLA-0056, October 2003 Monthly Operating Report for Susquehanna, Units 1 & 22003-11-13013 November 2003 October 2003 Monthly Operating Report for Susquehanna, Units 1 & 2 PLA-0055, December 2002 Monthly Operating Report for Susquehanna2003-01-13013 January 2003 December 2002 Monthly Operating Report for Susquehanna PLA-5574, November 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-12-13013 December 2002 November 2002 Monthly Operating Report for Susquehanna Steam Electric Station ML0227503732002-09-13013 September 2002 August 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0005, July 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-08-14014 August 2002 July 2002 Monthly Operating Report for Susquehanna Units 1 & 2 PLA-0054, June 2002 Monthly Operating Report for Susquehanna Steam Electric Station2002-07-12012 July 2002 June 2002 Monthly Operating Report for Susquehanna Steam Electric Station PLA-0545, February 2002 Monthly Operating Report for Susquehanna Units 1 & 22002-03-13013 March 2002 February 2002 Monthly Operating Report for Susquehanna Units 1 & 2 2006-09-14
[Table view] |
Text
?F' -i I J..TM Robert A. Saccone Vice President
-Nuclear Operations PPL Susquehanna, LLC 769 Salem/Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com May 15, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA -006065 The April 2006 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.Very truly yours, oet.Saccone JJII/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. Alan Blarney NRC Project Manager, Mr. R V. Guzman
/a OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/15/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.2.3.4.Unit Name: Susquehanna Steam Electric Station (U1)Reporting Period: April 2006 Design Electrical Rating (Net MWe): 1177 Maximum Dependable Capacity (Net MWe): 1135 5.6.7.8.9.Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)This Month 719 483.77 451.05 0 473,410 Yr.-to-Date 2879 1978.9 1939.1 0 2,163,313 Cumulative 200,712.0 168,356.4 165,896.2 0 172,246,370 NOTES: Page I of 1 UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 05/15/2006 J. J. Hennings (570) 542-3747 REPORT MONTH April 2006 Cause & Corrective Action To Prevent Recurrence Reactor shutdown on March 4, 2006 for refueling outage 14. Reactor critical on 4/10/06 and reached 100% on 4/15/06.I Summary: Following startup from the refueling outage there were no power reductions greater than 20% this month.1.F. Forced S. Scheduled 2.Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)3.Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page 1 of I SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Completed by: J. J. Hemiings Challenges to Main Steam Safety Relief Valves Date: 05/15/2006 Teleplionie:
(570) 542-3747 None.
Z1I OPERATING DATA REPORT DOCKET NO, UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/15/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS 5. Unit Name: Susquehanna Steam Electric Station (U2)6. Reporting Period: April 2006 7. Design Electrical Rating (Net MWe): 1182 8. Maximum Dependable Capacity (Net MWe): 1140 5. Hours in Reporting Period 6. Number of Hours Reactor Was Critical 7. Hours Generator On-Line 8. Unit Reserve Shutdown Hours 9. Net Electrical Energy Generated (MWH)NOTES: This Month 719 677.32 671 0 771,371 Yr.-to-Date 2,879 2,837.3 2,831.0 0 3,282,803 Cumulative 185,952.0 163,509.0 161,424.5 0 170,983,678 Previous Month Correction:
The Cumulative value for "Number of Hours Reactor Was Critical", as stated in the March Monthly Operating Report was 168,872.6.
The correct value of 167,872.6 Hrs was reported to the INPO Consolidated Data Entry (CDE) program. The values input to CDE did not need revision.
This identification of the typographical error on Letter PLA-006052 is to ensure the hard copy record agrees the electronically transmitted data. 167,872.6 Hrs is the correct value for "Number of Hours Reactor Was Critical" as of the end of March 2006. The April report and subsequent reports will use this value when calculating future cumulative data for CDE and hard copy letters.Page 1 of 1 UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 05/15/2006 J. J. Hennings (570) 542-3747 REPORT MONTH April 2006 No. Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3 1 4/29/06 S 48.0 B 5 Reactor shutdown on 4/29/06 for a planned outage to (continuing) (soft correct drywell leakage.shutdown)Summary: Other than the Reactor Shutdown there were no power changes greater than 20% this month.1.2.3.F. Forced S. Scheduled Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)Method: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page I of 1
- ,. z SUSQUEHANNA STEAM ELECTRIC STATION Docket Number
- 50-388 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves Date: 05/15/2006 Telephone:
(570) 542-3747 None.