PLA-5574, November 2002 Monthly Operating Report for Susquehanna Steam Electric Station
| ML023610188 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 12/13/2002 |
| From: | Richard Anderson Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-5574, R41-2A | |
| Download: ML023610188 (7) | |
Text
Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson @ pplweb corn
't I
i TM December 13, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OPI-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-3881NPF-22 PLA-5574 R41-2A The November 2002 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.
Very truly yours, JJHI/cmm cc: NRC Region 1 NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. T. G. Colburn NRC Project Manager, Mr. E. M. Thomas
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 12/13/02 J. J. Hennings (570) 542-3747 OPERATING STATUS Unit Name:
Susquehanna Steam Electric Station (U 1)
Reporting Period:
November 2002 Design Electrical Rating (Net MWe):
1115 Maximum Dependable Capacity (Net MWe):
1105 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720 720 720 0
801,384 NOTES:
Page 1 of 1
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
9.
Yr.-to-Date 8,016 6,818.3 6,749.8 0
7,194,733 Cumulative 170,785 141,120.5 138,909.8 0
142,421,642
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 12/13/02 J. J. Hennings (570) 542-3747 REPORT MONTH November 2002 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No Shutdowns this month.
Summary: The only significant power change during November was a reduction to 82% for a control rod sequence exchange on 11/23102.
- 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
- 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other I1.
F. Forced S. Scheduled Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Dale:
12/13/02 Telephone:
(570) 542-3747 Challenjes to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 12/13/02 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susquehanna Steam Electric Station (U2)
- 2.
Reporting Period:
November 2002
- 3.
Design Electrical Rating (Net MWe):
1117
- 4.
Maximum Dependable Capacity (Net MWe):
1111 Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720 720 720 0
802,039 NOTES:
Page 1 of 1
- 5.
- 6.
- 7.
- 8.
9.
Yr.-to-Date 8016 7,748.4 7,696 0 0
8,479,103 Cumulative
,156,025 135,405.4
,133,462.7 0
139,283,933
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 12/13/02 J. J. Hennings (570) 542-3747 REPORT MONTH November 2002 No.
Date Type Duration Reason Method of Cause & Corrective Action 1
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No shutdowns in November.
Summary: A control rod sequence exchange was performed on 11/02/02, at 83% power. Power reductions of approximately 10% were conducted for control rod adjustments on 11/9, 11/16 and 11/30.
2.
3.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other 1.
F. Forced S. Scheduled Page 1 of 1
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:, 50-388 Completed by:
J. J. Hennings Datei 12/13/02 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.