July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station
ML042380467
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/13/2004
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005799
Download: ML042380467 (7)


Text

-- t Ig I

lI I

ham..

ma TM Richard L Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem IBoulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@ pplweb.com August 13,2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005799 The July 2004 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.

Very truly yours, Qi LQ?

Richard L. Anderson JJH/cmrnm cc: NRC Region I NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman e--

-

, 

;k

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 08/13/2004 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.

2.

3.

4.

Unit Name:

Susguehanna Steam Electric Station (Ul)

Reporting Period:

July 2004 Design Electrical Rating (Net MWe):

1177*

Maximum Dependable Capacity (Net MWe) 1135*

5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

842,572 Yr.-to-Date 5,111 3,830.2 3,780.4 0

4,045,505 Cumulative 185,400 154,315.0 152,020.0 0

156,658,943 NOTES:

  • Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April.

Page 1 of I

i: '

i

,, 1.

UNIT SHUTDOWNS, DOCKET NO. ;

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 08113/2004 J. J. Hennings (570) 542-3747 REPORT MONTH July 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down R eacto r 3 No shutdowns this month Summary: There were no power reductions greater than 20% this month.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

1 -Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Dae-08/13/04 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 08/13/04 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susguehanna Steam Electric Station (U2)

2. Reporting Period:

July 2004

3.

Design Electrical Rating (Net MWe):

1182

4.

Maximum Dependable Capacity (Net MWe):

1140 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

841,351 Yr.-to-Date 5,111 5.111 5,111 0

5.867.351 Cumulative 170,640 149,006.8 147,019.6 0

154,625,362 NOTES:

Page 1 of 1

' I

.,

- 4,,

.c,,,

I I

, S I

- t -,.

C UNIT SHUTDOWNS DOCKET NO:.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 08/13104 J. J. Hennings (570) 542-3747 REPORT MONTH Julv 2004 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor l

3 1XINo shutdowns this month.

Summary. On 07/29/04, reactor power was manually reduced to 78% power due to a loss of offgas/condenser vacuum caused by an electrical transient at a 13.8KV load center. Unit 2 returned to 100% power on 07/30/04.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page I of I

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Completed by:

J. J. Hennings

'.:t Date-08/13/2004 Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.