PLA-0057, July 2004 Monthly Operating Reports for Susquehanna Steam Electric Station
| ML042380467 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/13/2004 |
| From: | Richard Anderson Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-005799 | |
| Download: ML042380467 (7) | |
Text
-- t Ig I
lI I
ham..
ma TM Richard L Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem IBoulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@ pplweb.com August 13,2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005799 The July 2004 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.
Very truly yours, Qi LQ?
Richard L. Anderson JJH/cmrnm cc: NRC Region I NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman e--
-
,
;k
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 08/13/2004 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.
2.
3.
4.
Unit Name:
Susguehanna Steam Electric Station (Ul)
Reporting Period:
July 2004 Design Electrical Rating (Net MWe):
1177*
Maximum Dependable Capacity (Net MWe) 1135*
5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
842,572 Yr.-to-Date 5,111 3,830.2 3,780.4 0
4,045,505 Cumulative 185,400 154,315.0 152,020.0 0
156,658,943 NOTES:
- Design Electrical Rating (DER) and Maximum Dependable Capacity (MDC) has been changed starting with the May reporting period due to turbine modifications that were completed in April.
Page 1 of I
i: '
i
,, 1.
UNIT SHUTDOWNS, DOCKET NO. ;
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 08113/2004 J. J. Hennings (570) 542-3747 REPORT MONTH July 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down R eacto r 3 No shutdowns this month Summary: There were no power reductions greater than 20% this month.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.
Method:
1 -Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Dae-08/13/04 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 08/13/04 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (U2)
- 2. Reporting Period:
July 2004
- 3.
Design Electrical Rating (Net MWe):
1182
- 4.
Maximum Dependable Capacity (Net MWe):
1140 5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
841,351 Yr.-to-Date 5,111 5.111 5,111 0
5.867.351 Cumulative 170,640 149,006.8 147,019.6 0
154,625,362 NOTES:
Page 1 of 1
' I
.,
- 4,,
.c,,,
I I
, S I
- t -,.
C UNIT SHUTDOWNS DOCKET NO:.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 08/13104 J. J. Hennings (570) 542-3747 REPORT MONTH Julv 2004 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor l
3 1XINo shutdowns this month.
Summary. On 07/29/04, reactor power was manually reduced to 78% power due to a loss of offgas/condenser vacuum caused by an electrical transient at a 13.8KV load center. Unit 2 returned to 100% power on 07/30/04.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page I of I
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Completed by:
J. J. Hennings
'.:t Date-08/13/2004 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.