ML061870397

From kanterella
Jump to navigation Jump to search
May 2006 Monthly Operating Report for Susquehanna Units 1 and 2
ML061870397
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/15/2006
From: Saccone R A
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-006073
Download: ML061870397 (7)


Text

I I I I Robert A. Saccone Vice President

-Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com PP urn--.gal..~44 4 S.4'June 15, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA -006073 The May 2006 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.Very truly yours, Ro rt A. Saccone JJH-cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. Alan Blarney NRC Project Manager, Mr. R V. Guzman:T I eDq

& -OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 06/15/2006 J. J. Hennings (570) 542-3747 1.2.3.4.OPERATING STATUS Unit Name: Susquehanna Steam Electric Station (UI)Reporting Period: May 2006 Design Electrical Rating (Net MWe): 1177 Maximum Dependable Capacity (Net MWe): 1135 5.6.7.8.9.Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)This Month 744 744 744 0 853,664 Yr.-to-Date 3623.0 2722.9 2683.1 0 3,016,977 Cumulative 201,456.0 169,100.4 166,640.2 0 173,100,035 NOTES: Page 1 of I N UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-387 One 06/15/2006 J. J. Hennings (570) 542-3747 REPORT MONTH May 2006 No.Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 Summary: There were no power reductions greater than 20% this month.1.F. Forced S. Scheduled 2.Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)3.Method: I -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page I of I SUSQUEHIANNA STEAM ELECTRIC STATION Docket Number: 50-387 Completed by: J. J. Hennings Challenges to Main Steam Safety Relief Valves None.Date: 06/15/2006 Telephone:

(570) 542-3747 OPERATING DATA REPORT DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 06/15/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS 5. Unit Name: Susquehanna Steam Electric Station (U2)6. Reporting Period: May 2006 7. Design Electrical Rating (Net MWe): 1182 8. Maximum Dependable Capacity (Net MWe): 1140 5. Hours in Reporting Period 6. Number of Hours Reactor Was Critical 7. Hours Generator On-Line 8. Unit Reserve Shutdown Hours 9. Net Electrical Energy Generated (MWH)NOTES: This Month 744 656.5 640.97 0 704,131 Yr.-to-Date 3623.0 3493.8 3472.0 0 3,986,934 Cumulative 186,696.0 164,165.5 162,065.4 0 171,687,809 Page 1 of I UNIT SHUTDOWNS DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 06/15/2006 J. J. Hennings (570) 542-3747 REPORT MONTH May 2006 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3 4/29/06 S 103.03 B 4 Reactor shutdown on 4/29/06 for a planned outage to (May) correct drywell leakage. The reactor was critical at 151.03 15:30 on 5/04/06. Generator was put back on line on (total) May 5, 2006 07:02 a.m.1.2.3.F. Forced S. Scheduled Reason: A -Equipment Failure (Explain)B -Maintenance or Test C -Refueling D -Regulatory Restriction E -Operator Training & Licensee Exam F -Administrative G -Operational Error (Explain)Method: I -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Continuation from previous month 5 -Other Page I of 1 SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50°388 Completed by: J. J. Hennings Date: 06/15/2006 Telephone-(570) 542-3747 Challen2es to Main Steam Safety Relief Valves None.