ML070320592

From kanterella
Jump to navigation Jump to search

E-mail from Monette Regarding the Environmental Report Acceptance Review on the Susquehanna Steam Electric Station Application Review
ML070320592
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/09/2006
From: Monette F
Argonne National Lab (ANL)
To: Avci H, Lagory K
Argonne National Lab (ANL), Office of Nuclear Reactor Regulation
References
TAC MD3021, TAC MD3022
Download: ML070320592 (2)


Text

Monette, Frederick A.

From:

Monette, Frederick A.

Sent:

Monday, October 09, 2006 2:39 PM To:

Avci, Halil I.; LaGory, Kirk E.

Subject:

SSES ER Acceptance Review Attachments:

SSES ER Acceptance Review.doc Hi Halil and Kirk, Attached is a draft of the ER acceptance review results that I am going to send Alicia, either at the end of today or tomorrow morning. I thought I'd run it by you before sending it.

Fred SSES ER

eptance Review.doc Fred Monette Environmental Science Division Bid. 900 Argonne National Laboratory Argonne, IL 60439 Ph:

630-252-5722 Cell:

630-991-3253 Fax:

630-252-4624

Alicia, The Argonne SEIS team has reviewed the Susquehanna Steam Electric Station Environmental Report for License Renewal to determine acceptability in meeting the requirements of 10 CFR 51.45. The staff believes that the ER meets these requirements, provided that the applicant provides additional infonnation to supplement the ER.

As we discussed, we are scheduled to submit a comprehensive list of additional data and information needs in February. However, for your information, some of the areas for which the ER did not provide sufficient information and for which additional information will be required are summarized below:

Section 2.1, Location and Features, and Section 3.1.1, Reactor and Containment Systems, are unusually brief.

Additional information on the extended power uprate, including the EA and FONSI (if issued), are required when available.

  • The applicant provided a redacted version of the FSAR, and deleted at least one section important for writing the SEIS (the section oil gaseous radioactive waste management in Chapter 11). The complete FSAR should be provided.
  • The ER does not adequately describe regional climatology (e.g. annual and seasonal mean temperatures, historically high rain and snow events) and local meteorology for the plant (e.g., annual and seasonal predominant wind speed and direction).
  • No discussion of transient populations and the area economic base were provided.

No description was provided as to the height, color, or visibility of the facilities and structures and from what distances and locations they can be seen. Appendix A referenced that a discussion of Issue 73 (Aesthetic impacts) would be found in Section 4.0, but it could not be found.

No information is provided regarding plant and cooling tower noise and what can be heard at the site boundaries or in the Riverlands Recreation Area. Appendix A referenced that a discussion of Issue 58 (Noise) would be found in Section 4.0, but it could not be found.

There is no mention of Federal facilities and lands within a 50-mile proximity to the Susquehanna site.

Site land cover/land use percentages are missing - there are no descriptions or percentages for land cover categories, such as, open area (fields, marshes, swamps, beach, cemetery), forests, facilities and structures, parking areas, water