A V I I*
- ~
st... 1# 6 4
i ' m 3 m- -
I 4 T
TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LUC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com February 13, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop C)-P1-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 30-387/NPF-14 and 50-388/NPF-22 PLA - 006016 The January 2006 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Ro er Saccone JJHicmm cc: NRC Ragion I NRC Sr. Resident Inspector, Mr. Alan Blamey NRC Project Manager, Mr. R V. Guzman
+
'
C-- -0 I
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 02/13/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (U1)
- 2.
Reporting Period:
January 2006
- 3.
Design Electrical Rating (Net MWe):
1177
- 4.
Maximum Dependable Capacity (Net MWe):
1135
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
860,463 Yr.-to-Date 744 744 744 0
860,463 Cumulative 198,577.0 167,121.5 164,701.1 0
170,943,521 NOTES:
Page 1 of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 02/13/2006 J. J. Hennings (570) 542-3747 REPORT MONTH January 2006 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down R eactor 3 No reactor shutdowns this month.
Summary: Power reductions greater than 20% this month:
01/07/06 - reduction of 26% for rod pattern adjustment until 01/08/06.
01/21/06 - reduction of 20% for rod pattern adjustment until 01/22/06.
01/28/06 - reduction of 22% for rod pattern adjustment until 01/30/06.
1.
F. Forced S. Scheduled 2.
Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain) 3.
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of 1
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by:
J. J. Hennings Challenges to Main Steam Safety Relief Valves None.
Date:
02/13/06 Telephone:
(570) 542-3747
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 02/13/06 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 5.
Unit Name:
Susguehanna Steam Electric Station (U2)
- 6. Reporting Period:
January 2006
- 7.
Design Electrical Rating (Net MWe):
1182
- 8.
Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
NOTES:
This Month 744 744 744 0
867,469 Yr.-to-Date 744 744 744 0
867,469 Cumulative 183,817.0 161,415.7 159,337.5 0
168,568,343 Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 02/13/2006 J. J. Hennings (570) 542-3747 REPORT MONTH January 2006 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No reactor shutdowns this month.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
02/13/06 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenmes to Main Steam Safety Relief Valves None.