February 2006 Monthly Operating Report for Susquehanna Units 1 and 2
ML060870401
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/10/2006
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-006034
Download: ML060870401 (7)


Text

% I I

I,*I iL

  • +'

PP I

,. TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com March 10, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washing on, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA - 006034 The February 2006 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.

Very truly yours, Robert A -accone JJHIcmrr cc: NRC Region I NRC Sr. Resident Inspector, Mr. Alan Blarney NRC. Project Manager, Mr. R V. Guzman jo, Effq-

Q OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 03/10/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susguehanna Steam Electric Station (UI)

2.

Reporting Period:

February 2006

3. Design Electrical Rating (Net MWe):

1177

4. Maximum Dependable Capacity (Net MWe):

1135

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Ur it Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

This Month 672 672 672 0

757,809 Yr.-to-Date 1416 1416 1416 0

1,618,272 Cumulative 199,249.0 167,793.5 165,373.1 0

171,701,330 NOTES:

Page I of I

UNIT SHUTDOWNS

ip

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE

  • 50-387 One 03110/2006 J. J. Hennings (570) 542-3747 REPORT MONTH February 2006 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down

._.Reactor 3 No reactor shutdowns this month.

Summary: Power reductions greater than 20% this month:

02/04/06 - planned reduction of 21% for rod pattern adjustment until 02/05/06.

02/18/06 - planned reduction of 30% for control rod friction testing until 02/19/06.

1.

F. Forced S. Scheduled

2.

3.

Reason:

Method:

A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Sc ram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F-Administrative G - Operational Error (Explain)

Page l of 1

I SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by:

J. J. ]ennings Challenges to Main Steam Safety Relief Valves None.

Date:

03/10/06 Telephone:

(570) 542-3747

I OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 03/10/2006 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susguehanna Steam Electric Station (U2)

6.

Reporting Period:

February 2006

7.

Design Electrical Rating (Net MWe):

1182

8.

Maximum Dependable Capacity (Net MWe):

1140

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

NOTES:

This Month 672 672 672 0

778,531 Yr.-to-Date 1416 1416 1416 0

1,645,999 Cumulative 184,489.0 162,087.7 160,009.5 0

169,346,874 Page I of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 03/10/2006 J. J. Hennings (570) 542-3747 REPORT MONTH February 2006 No.

Dat.

Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No reactor shutdowns this month.

Summary: The one power change greater than 20% this month was a reduction of 30% for a planned sequence exchange.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Method:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page I of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

03/10/2006 Completed by:

J. J. Hennings Telephone:

(570) 542-3747 Challens es to Main Steam Safety Relief Valves None.