July 2002 Monthly Operating Report for Susquehanna Units 1 & 2
ML022400554
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/14/2002
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-000513
Download: ML022400554 (7)


Text

"I I

      • I ** --

Richard L. Anderson PPL Susquehanna, LLC Vice President - Nuclear Operations 769 Salem/Boulevard Berwick, PA 18603 PPI<

Tel 570 542.3883 Fax 570.542.1504 '~TM RLAnderson@pplweb.com August 14, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005513 R41-2A The July 2002 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Richard L. Anderson JJtI/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Sr. Project Manager, Mr. T. G. Colburn NRC Project Manager, Mr. E. M. Thomas r,

/<

OPERATING DATA REPORT DOCKET NO. 50-387 UNIT One DATE 8-13-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

1. Unit Name: Susquehanna Steam Electric Station (Ul)
2. Reporting Period: July 2002
3. Design Electrical Rating (Net MWe): 1115
4. Maximum Dependable Capacity (Net MWe): 1105 This Month Yr.-to-Date Cumulative Hours in Reporting Period 744 5,087 167,856 5.
6. Number of Hours Reactor Was Critical 744 3889.3 138,191.5
7. Hours Generator On-Line 744 3820.8 135,980.8
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 815,909 3,979,465 139,206,374 NOTES:

Page 1 of I

UNIT SHUTDOWNS DOCKET NO. 50-387 UNIT One DATE 8/13/02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH July 2002 Cause & Corrective Action To Prevent Recurrence onth.

Summary: There were no significant power changes during July.

1. 2. 3.

F. Forced Reason: Method:

S. Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee 5- Other Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

SUS.QUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Date: 8-13-02 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 8-13-02 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

1. Unit Name: Susquehanna Steam Electric Station (U2)
2. Reporting Period: July 2002
3. Design Electrical Rating (Net MWe): 1117
4. Maximum Dependable Capacity (Net MWe): 1111 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 744 5,087 153,096
6. Number of Hours Reactor Was Critical 744 5,087 132,744.0
7. Hours Generator On-Line 744 5,087 130,853.7 Unit Reserve Shutdown Hours 0 0 0 8.
9. Net Electrical Energy Generated (MWH) 813,778 5,618,527 136,423,357 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO. 50-388 UNIT Two DATE 8-13-02 COMPLETED BY -J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH July 2002 No. Date Type Duration Reason Method Cause & Corrective Action (Hours) 2 of to Prevent Recurrence Shutting Down Reactor 3

No Shutdowns this month.

Summary: There were no significant power changes during July.

I. 2. 3.

F. Forced Reason: Method:

S. Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee 5- Other Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

I I I SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 8-13-02 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safety Relief Valves None.