December 11, 2023
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - FIRE PROTECTION TEAM INSPECTION REPORT 05000387/2023010 AND 05000388/2023010
Dear Brad Berryman:
On November 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2 and discussed the results of this inspection with Mark Jones, Acting Site Vice President, and other members of your staff.
The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety
Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000387 and 05000388
License Numbers:
Report Numbers:
05000387/2023010 and 05000388/2023010
Enterprise Identifier: I-2023-010-0036
Licensee:
Susquehanna Nuclear, LLC
Facility:
Susquehanna Steam Electric Station, Units 1 and 2
Location:
Berwick, PA
Inspection Dates:
October 30, 2023 to November 16, 2023
Inspectors:
L. Cline, Senior Reactor Inspector
D. Kern, Senior Reactor Inspector
J. Tifft, Reactor Inspector
Approved By:
Glenn T. Dentel, Chief
Engineering Branch 2
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Susquehanna Steam Electric Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.21N.05 - Fire Protection Team Inspection (FPTI)
Structures, Systems, and Components Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
- (1) Fire Barrier System (NDAP-QA-0446)
- (2) Fire Detection/Alarm System
- (3) Emergency Service Water and Residual Heat Removal Service Water System
- (4) Core Spray System
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.
- (1) Control of Ignition Sources, and Hot Work permits (NDAP-QA-0442)
- (2) Aging Management Program (10CFR54) as it Relates to Fire Protection Components
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors verified the following:
a. Changes to the approved fire protection program (FPP) do not constitute an adverse effect on the ability to safely shutdown.
b. The adequacy of the design modification, if applicable.
c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
e. Post-fire safe shutdown operating procedures, such as abnormal operating procedures, affected by the modification were updated.
- (1) EC-2352782, Replace Heat Detectors (2)86-10 Fire Hazards Analysis for Diesel Driven Fire Pump Room Fire Barrier Gap (CR 2020-13254).
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 16, 2023, the inspectors presented the fire protection team inspection results to Mark Jones, Acting Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Calculations
EC-013-0162
Scope Review of Fire Protection Features TRM
Requirements
Revision 4
EC-013-0852
Evaluation for Identification and Disposition of Appendix R
Section III.G Non-compliant Cables
Revision 1
EC-013-0920
Assessment of Fire Detectors and Suppression Systems
Revision 12
EC-013-1076
SSES Raceway Fire Barrier Upgrade Qualification
Records for NRC Generic Letter 92-08
Revision 1
EC-SIMU-1004
Time Critical Operator Action (TCOA) and Time Sensitive
Operator Action (TSOA) Margin Evaluation
Revision 1
Corrective Action
Documents
2018-09760
21-13801
22-00350
Corrective Action
Documents
Resulting from
Inspection
23-17118
23-17130
23-17132
23-17143
23-17274
23-17283
23-17329
23-17331
23-17347
23-17348
23-17366
23-17375
23-17376
23-17393
23-17440
23-17774
23-17809
23-17825
23-17840
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
23-17854
23-17864
23-17867
23-17896
23-17928
23-17943
23-17944
23-17960
Drawings
C-1723, Sht 10
SSES U1 RB Fire zone Plan of Protected Tray Raceway
Elevation 719-1
Revision 4
M-111, Sht 1
SSES Common Emergency Service Water System
Revision 52
M-112, Sht 1
SSES U1 RHR Service Water System
Revision 56
M-112, Sht 2
SSES U1 RHR Service Water System
Revision 24
Engineering
Changes
DCP 214698
Unit 2 - Reactor Building Fire Detection System Upgrade
03/15/2000
Replace Heat Detectors
Revision 0
Engineering
Evaluations
86-10 Fire Hazards Analysis Evaluation for Diesel Driven
Fire Pump Fire Barrier Gap
Revision 0
Miscellaneous
SSES Fire Protection Review Report
Revision 13
SNE-DTG-007
License Renewal Commitments for Fire Protection
Engineering
Revision 1
Procedures
NDAP-QA-0343
SSES Time Critical and Time Sensitive Operator Actions
Revision 6
NDAP-QA-0409
Door, Floor Plug, and Hatch Control
Revision 23
NDAP-QA-0442
Control of Ignition Sources, Cutting, Welding, and Hot
Work Permits
Revision 20
NSEP-QA-0002
License Renewal System Walkdown Program
Revision 1
NSEP-QA-0433
Buried Piping Surveillance Program (AMP-16) License
Renewal Program Basis Document
Revision 0
NSEP-QA-0440
Fire Protection Program (AMP-15) License Renewal
Program Basis Document
Revision 0
NSEP-QA-0449
System Walkdown Program (AMP-28) License Renewal
Program Basis Document
Revision 2
ON-CREVAC-
101
Control Room Evacuation
Revision 7
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OP-054-001
Emergency Service Water System
Revision 45
OP-100-001
Remote Shutdown Panel
Revision 14
OP-116-001
Revision 60
Month Inspection of Unit Common Fire Barriers
Revision 13
Month Inspection of Fire Windows/Fire Dampers and
Associated Hardware
Revision 8
Month Inspection of Unit 1 Fire Rated Penetration
Seals
Revision 12
SI-013-225
Annual Functional Test of Fire Protection Smoke
Detectors For Fire Zones 0-25A and 0-25E
Revision 9
SI-213-241
Annual Functional Test of Fire Protection Ionization and
Photoelectric Detectors for Fire Zones 2-5A-N, 2-5A-S, 2-
5A-W, 2-5B, 2-5C and 2-5H (Preaction System PA-251)
Revision 13
SI-213-254
Annual Functional Test of Preaction System Fire
Protection Heat Detectors for Fire Zone 0-25A
Revision 7