Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010
ML23345A017
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/11/2023
From: Glenn Dentel
NRC/RGN-I/DORS
To: Berryman B
Susquehanna
References
IR 2023010
Download: ML23345A017 (1)


Text

December 11, 2023

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - FIRE PROTECTION TEAM INSPECTION REPORT 05000387/2023010 AND 05000388/2023010

Dear Brad Berryman:

On November 16, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2 and discussed the results of this inspection with Mark Jones, Acting Site Vice President, and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Digitally signed by Glenn Glenn T. T. Dentel Date: 2023.12.11 Dentel 07:36:47 -05'00'

Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000387 and 05000388 License Numbers: NPF-14 and NPF-22 Report Numbers: 05000387/2023010 and 05000388/2023010 Enterprise Identifier: I-2023-010-0036 Licensee: Susquehanna Nuclear, LLC Facility: Susquehanna Steam Electric Station, Units 1 and 2 Location: Berwick, PA Inspection Dates: October 30, 2023 to November 16, 2023 Inspectors: L. Cline, Senior Reactor Inspector D. Kern, Senior Reactor Inspector J. Tifft, Reactor Inspector Approved By: Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Susquehanna Steam Electric Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Fire Barrier System (NDAP-QA-0446)
(2) Fire Detection/Alarm System
(3) Emergency Service Water and Residual Heat Removal Service Water System
(4) Core Spray System

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Control of Ignition Sources, and Hot Work permits (NDAP-QA-0442)
(2) Aging Management Program (10CFR54) as it Relates to Fire Protection Components

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved fire protection program (FPP) do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire safe shutdown operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) EC-2352782, Replace Heat Detectors
(2) 86-10 Fire Hazards Analysis for Diesel Driven Fire Pump Room Fire Barrier Gap (CR 2020-13254).

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 16, 2023, the inspectors presented the fire protection team inspection results to Mark Jones, Acting Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.05 Calculations EC-013-0162 Scope Review of Fire Protection Features TRM Revision 4

Requirements

EC-013-0852 Evaluation for Identification and Disposition of Appendix R Revision 1

Section III.G Non-compliant Cables

EC-013-0920 Assessment of Fire Detectors and Suppression Systems Revision 12

EC-013-1076 SSES Raceway Fire Barrier Upgrade Qualification Revision 1

Records for NRC Generic Letter 92-08

EC-SIMU-1004 Time Critical Operator Action (TCOA) and Time Sensitive Revision 1

Operator Action (TSOA) Margin Evaluation

Corrective Action 2018-09760

Documents 2021-13801

22-00350

Corrective Action 2023-17118

Documents 2023-17130

Resulting from 2023-17132

Inspection 2023-17143

23-17274

23-17283

23-17329

23-17331

23-17347

23-17348

23-17366

23-17375

23-17376

23-17393

23-17440

23-17774

23-17809

23-17825

23-17840

Inspection Type Designation Description or Title Revision or

Procedure Date

23-17854

23-17864

23-17867

23-17896

23-17928

23-17943

23-17944

23-17960

Drawings C-1723, Sht 10 SSES U1 RB Fire zone Plan of Protected Tray Raceway Revision 4

Elevation 719-1

M-111, Sht 1 SSES Common Emergency Service Water System Revision 52

M-112, Sht 1 SSES U1 RHR Service Water System Revision 56

M-112, Sht 2 SSES U1 RHR Service Water System Revision 24

Engineering DCP 214698 Unit 2 - Reactor Building Fire Detection System Upgrade 03/15/2000

Changes EC 2352782 Replace Heat Detectors Revision 0

Engineering 86-10 Fire Hazards Analysis Evaluation for Diesel Driven Revision 0

Evaluations Fire Pump Fire Barrier Gap

Miscellaneous SSES Fire Protection Review Report Revision 13

SNE-DTG-007 License Renewal Commitments for Fire Protection Revision 1

Engineering

Procedures NDAP-QA-0343 SSES Time Critical and Time Sensitive Operator Actions Revision 6

NDAP-QA-0409 Door, Floor Plug, and Hatch Control Revision 23

NDAP-QA-0442 Control of Ignition Sources, Cutting, Welding, and Hot Revision 20

Work Permits

NSEP-QA-0002 License Renewal System Walkdown Program Revision 1

NSEP-QA-0433 Buried Piping Surveillance Program (AMP-16) License Revision 0

Renewal Program Basis Document

NSEP-QA-0440 Fire Protection Program (AMP-15) License Renewal Revision 0

Program Basis Document

NSEP-QA-0449 System Walkdown Program (AMP-28) License Renewal Revision 2

Program Basis Document

ON-CREVAC- Control Room Evacuation Revision 7

101

Inspection Type Designation Description or Title Revision or

Procedure Date

OP-054-001 Emergency Service Water System Revision 45

OP-100-001 Remote Shutdown Panel Revision 14

OP-116-001 RHR Service Water Revision 60

SE-013-007 24 Month Inspection of Unit Common Fire Barriers Revision 13

SE-013-009 24 Month Inspection of Fire Windows/Fire Dampers and Revision 8

Associated Hardware

SE-113-006 24 Month Inspection of Unit 1 Fire Rated Penetration Revision 12

Seals

SI-013-225 Annual Functional Test of Fire Protection Smoke Revision 9

Detectors For Fire Zones 0-25A and 0-25E

SI-213-241 Annual Functional Test of Fire Protection Ionization and Revision 13

Photoelectric Detectors for Fire Zones 2-5A-N, 2-5A-S, 2-

5A-W, 2-5B, 2-5C and 2-5H (Preaction System PA-251)

SI-213-254 Annual Functional Test of Preaction System Fire Revision 7

Protection Heat Detectors for Fire Zone 0-25A

7