PLA-0056, October 2003 Monthly Operating Report for Susquehanna, Units 1 & 2

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Susquehanna, Units 1 & 2
ML033290374
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/13/2003
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005698
Download: ML033290374 (7)


Text

i

' S

% Ii I

".*onit *4 Richard L Anderson PPL Susquehanna, LLC I .-

Vice President - Nuclear Operations 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@ pplweb.com I' P 1 k0 November 13,2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA- 005698 The October 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Richard L. Ande on JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman e1

OPERATING DATA REPORT DOCKET NO. 50-387 UNIT One DATE 11/13/2003 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

1. Unit Name: Susguehanna Steam Electric Station (Ul)
2. Reporting Period: October 2003
3. Design Electrical Rating (Net MWe): 1115
4. Maximum Dependable Capacity (Net MWe): 1105 This Month Yr.-to-Date Cumulative
5. Hours in Reporting Period 745 7,296 178,825
6. Number of Hours Reactor Was Critical 745 7,156.3 149,020.8
7. Hours Generator On-Line 745 7,121.7 146,775.5
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 810,691 7,735,848 - 150,989,377 NOTES:

Page 1 of 1

UNIT SHUTDOWNS DOCKET NO. 50-387 UNIT One DATE 11/13/2003 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH October. 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 No shutdowns this month.

Summary: On 10/1912003, a planned power reduction to 90% was performed for a Control Rod Pattern Adjustment. The only significant power reduction this month was on 10/25/03 for a planned power reduction to 77% power for a Control Rod Sequence Exchange and Control Rod stroking. 100% power was achieved on 10/26/03.

1. 2. 3.

F. Forced Reason: Method:

S. Scheduled A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2 - Manual Scram C- Refueling 3 - Automatic Scram D- Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-387 Date: 11/13/03 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenzes to Main Steam Safety Relief Valves None.

OPERATING DATA REPORT DOCKET NO. 50-388 UNIT Two DATE 11/13/03 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 OPERATING STATUS

1. Unit Name: Susquehanna Steam Electric Station (U2)
2. Reporting Period: October 2003
3. Design Electrical Rating (Net MWe): 1182*
4. Maximum Dependable Capacity (Net MWe): 1140*

This Month Yr.-to-Date Cumulative

5. Hours in Reporting Period 745 7,296 164,065
6. Number of Hours Reactor Was Critical 745 6,282.4 142,431.8
7. Hours Generator On-Line 745 6,237.9 140,444.6
8. Unit Reserve Shutdown Hours 0 0 0
9. Net Electrical Energy Generated (MWH) 861.241 6,947,905 147,058,899 NOTES:
  • During the U2 I h Refueling Outage, the Main Turbine was replaced with a newly designed HP and three LP turbines. The Design Rating and Maximum Dependable Capacity rating changed following the analysis of the official Performance/Acceptance Test performed in early June. Maximum Dependable Capacity rating is now 1140 MWe Net. The Design Electrical Rating of 1182 MWe Net is the nominal value identified in the FSAR (1220 MWe Gross) and corresponds closely to the Winter Production Rating.

Page 1 of I

UNIT SHUTDOWNS DOCKET NO. 50-388 UNIT Two DATE 11/13/2003 COMPLETED BY J. J. Hennings TELEPHONE (570) 542-3747 REPORT MONTH October 2003 No. Date Type Duration Reason Method of Cause & Corrective Action I (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3

No shutdowns this month.

Summary: The only significant power reduction this month was for a planned evolution to perform maintenance on a Reactor Feed Pump Controller. The power reduction on 10/5/03 was down to 60%, and the return to 100% power occurred on 10/6/03.

1. 2. 3.

F. Forced Reason: Method:

S. Scheduled A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2 - Manual Scram C- Refueling 3 - Automatic Scram D- Regulatory Restriction 4 - Continuation from previous month E - Operator Training & Licensee Exam 5 - Other F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number: 50-388 Date: 11/13/2003 Completed by: J. J. Hennings Telephone: (570) 542-3747 Challenges to Main Steam Safetv Relief Valves None.