Summary of Meeting with Duke Energy to Discuss Proposed License Amendment Request for Shearon Harris, Unit 1, Technical Specification Changes Associated with Departure from Nucleate Boiling Ratio Safety Limit
ML19113A065
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/14/2019
From: Martha Barillas
Plant Licensing Branch II
To:
Duke Energy Progress
Barillas M DORL/LPL2-2 301-415-2760
References
EPID L-2019-LRM-0014
Download: ML19113A065 (3)


Text

~p. IIEO<,~

l~~c..,. 0 UNITED STATES 1

\

~ NUCLEAR REGULATORY COMMISSION

- - WASHINGTON, D.C. 20555-0001

~ ,!"

~ +O

~ ****~ May 1 4 , 2019 LICENSEE: Duke Energy Progress, LLC FACILITY: Shearon Harris Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF MARCH 14, 2019, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST FOR SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, REGARDING TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH DEPARTURE FROM NUCLEATE BOILING RATIO SAFETY LIMIT (EPID L-2019-LRM-0014)

On March 14, 2019, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Duke Energy Progress, LLC (Duke Energy or the licensee), at NRC Headquarters, One White Flint, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss Duke Energy's proposed license amendment request regarding changes to technical specifications {TSs) for the departure from nucleate boiling ratio safety limit to address transition to a new fuel type for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris). The meeting notice and agenda, dated February 28, 2019, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML19059A442. A list of attendees is enclosed.

The licensee presented informational slides at the meeting (ADAMS Accession No. ML19077A367).

The licensee discussed the reason for the proposed change, which is that Harris plans to transition from the Framatome Inc. 17x17 high thermal performance fuel type to the Framatome Inc. GAIA fuel design. Duke Energy referenced the previously reviewed and approved topical report ANP-10341-P-A, "The ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations" (ADAMS Package Accession No. ML18236A371 ), stating that it will address the limitations and conditions associated with the topical report in its license amendment request. The licensee also provided a summary of actions that must be taken for the GAIA fuel implementation, including validation of the ORFEO-GAIA correlation with Duke Energy thermal-hydraulic methods, development of new departure from nucleate boiling ratio safety limit and statistical core design limit for ORFEO-GAIA using Duke Energy methods, and development of a mixed core penalty for the high thermal performance/GAIA transition core.

The licensee proposed to revise the Harris TS safety limit for departure from nucleate boiling ratio to include a limit for the GAIA fuel using the ORFEO-GAIA correlation . The licensee will also update the TS Administrative Controls section to include the ANP-10341-P-A topical report in its licensing basis. An appendix to the NRC-approved Duke Energy thermal-hydraulic methods report will also be provided to describe the critical heat flux correlation validation in VIPRE-01 and safety limit development.

The licensee plans to transition to the GAIA fuel type starting in spring 2021. The proposed license amendment request scheduled submittal is tentatively in April 2019.

The NRC staff will provide an estimate of the review schedule after completing an acceptance review of the licensee's submittal.

No regulatory decisions or commitments were made at the meeting. No members of the public were in attendance, and no comments were provided.

Please direct any inquiries to me at 301-415-2760 or Martha.Barillas@nrc.gov.

Mir Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES MARCH 14,2019, MEETING WITH DUKE ENERGY PROGRESS, LLC SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 PROPOSED LICENSE AMENDMENT REQUEST REGARDING TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH DEPARTURE FROM NUCLEATE BOILING RATIO SAFETY LIMIT U.S. Nuclear Regulatory Commission Martha Barillas Jennifer Whitman*

Ravinder Grover*

Summer Sun Joshua Wilson Reed Anzalone Joshua Kaizer Duke Energy Progress, LLC Dennis Earp*

Lee Grzeck*

Jeff Abbott*

James Reed*

  • Participated by telephone

.

Enclosure

SUBJECT:

SUMMARY

OF MARCH 14, 2019, MEETING WITH DUKE ENERGY PROGRESS, LLC TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST FOR SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1, REGARDING TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH DEPARTURE FROM NUCLEATE BOILING RATIO SAFETY LIMIT (EPID L-2019-LRM-0014) DATED MAY 14, 2019 DISTRIBUTION:

Public PM File Copy RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrLABClayton Resource RidsNrrPMShearonHarris Resource RidsNrrDorlLpl2-2 Resource RidsRgn2MailCenter Resource RidsACRS_ MailCTR Resource RidsNrrDssSnpb Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource JKaizer, NRR RAnzalone, NRR JWilson, NRR SSun, NRR RGrover, NRR JQuichocho, OEDO JJohnston, NRR MMcCoppin, OEDO ADAMS Access1on No.: ML19113A065 *b,y e-ma1*1 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DSS/SNPB/BC NRR/DSS/SRXB/BC NAME MBarillas BClayton {LRonewicz for) Rlukes* (SKrepel for) JWhitman*

DATE 04/25/2019 04/24/2019 04/25/2019 05/07/2019 OFFICE NRR/DSS/STSB/BC NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME VCusumano* (PSnyder for) UShoop (RSchaaf for) MBarillas DATE 04/26/2019 05/10/2019 05/14/2019 OFFICIAL RECORD COPY