Meeting Summary - Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant
ML12107A001
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/16/2012
From: Randy Musser
Division Reactor Projects III
To: Burton C
Carolina Power & Light Co
Catherine Morrison
References
Download: ML12107A001 (28)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 16, 2012 Mr. Christopher L. Burton, Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

MEETING

SUMMARY

- CATEGORY 1 PUBLIC MEETING - ANNUAL ASSESSMENT OF SHEARON HARRIS NUCLEAR PLANT, DOCKET NO.

50-400

Dear Mr. Burton:

This refers to the meeting conducted at our request at Holly Springs Cultural Center on April 9, 2012, at 5:45 p.m. The meeting's purpose was to discuss the NRC Reactor Oversight Process Annual Assessment of Shearon Harris Nuclear Plant.

The topics discussed included the reactor oversight process, the NRCs action matrix and the performance of the Harris Nuclear Plant.

Enclosed are a list of attendees and the presentation handouts.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4603.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63

Enclosure:

1. List of Attendees
2. Handout- Shearon Harris - Annual Assessment Meeting cc w/encl.: (See page 2)

CP&L 2 cc w/encl: John H. O'Neill, Jr.

Brian Bernard Shaw, Pittman, Potts & Trowbridge Manager, Nuclear Services and EP 2300 N. Street, NW Nuclear Protective Services Washington, DC 20037-1128 Shearon Harris Nuclear Power Plant Electronic Mail Distribution Joseph W. Donahue Vice President Brian C. McCabe Nuclear Oversight Manager, Nuclear Oversight Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution W. Lee Cox, III Section Chief Robert J. Duncan II Radiation Protection Section Vice President N.C. Department of Environmental Nuclear Operations Commerce & Natural Resources Progress Energy Electronic Mail Distribution Electronic Mail Distribution Kelvin Henderson Donald L. Griffith General Manager Training Manager Nuclear Fleet Operations Shearon Harris Nuclear Power Plant Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Public Service Commission R. Keith Holbrook State of South Carolina Manager, Support Services P.O. Box 11649 Shearon Harris Nuclear Power Plant Columbia, SC 29211 Electronic Mail Distribution Chairman David H. Corlett North Carolina Utilities Commission Supervisor Electronic Mail Distribution Licensing/Regulatory Programs Progress Energy Terrence E. Slake Electronic Mail Distribution Manager Nuclear Plant Security David T. Conley Shearon Harris Nuclear Power Plant Senior Counsel Electronic Mail Distribution Legal Department Progress Energy Robert P. Gruber Electronic Mail Distribution Executive Director Public Staff - NCUC Donna B. Alexander 4326 Mail Service Center Manager, Nuclear Regulatory Affairs Raleigh, NC 27699-4326 (interim)

Progress Energy cc w/encl. (continued next page)

Electronic Mail Distribution

CP&L 3 cc w/encl. (continued)

Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Chair Board of County Commissioners of Chatham County P.O. Box 1809 Pittsboro, NC 27312 Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998 Shearon Harris Nuclear Plant Annual Assessment Meeting 2011 Reactor Oversight Process Nuclear Regulatory Commission - Region II Enclosure 2

Agenda g

Introduction Reactor Oversight Process Industry Performance Harris Nuclear Plant Performance Results Progress g Energy gy Response p and Remarks NRC Closing Remarks Public Questions to NRC Enclosure 2

Meetings g Purposep Public forum for discussion of Shearon H i performance Harris f iin 2011 NRC will address the performance in th annuall assessmentt the Progress Energy will be given the opportunity t it to t respond d to t the th NRC Annual Assessment Enclosure 2

Region g II Organization g Victor McCree Regional Administrator Len Wert Deputy Regional Administrator Rick Croteau Joel Munday Director, Division of Reactor Director, Division of Reactor Projects Safety Bill Jones Chris Christensen Deputy Director Deputy Director Randall Musser Branch Chief Regional Inspectors Harris Project Engineers Resident Inspectors James Dodson, Senior PE Joseph Austin, Senior RI Jannette Worosilo, PE Patrick Lessard, RI Thomas Stephen, PE Enclosure 2

What We Do Safety Security Environment Enclosure 2

What We Regulate Reactors Materials Waste Enclosure 2

What We Dont Regulate Military Radon X Rays X-Rays Enclosure 2

Assurance of Plant Safety Continuous Long-Term g

T i i Training Maintenance Regulation Compliance Defense In-Depth Enclosure 2

Regulatory Principles Independence p

Openness Efficiency Clarity Reliability Enclosure 2

Regulatory Framework PUBLIC HEALTH AND SAFETY NRCs Safety AS A RESULT OF CIVILIAN NUCLEAR REACTOR Mission OPERATION REACTOR RADIATION Strategic g SAFEGUARDS SAFETY SAFETY Performance Areas Cornerstones PUBLIC OCCUPATIONAL INITIATING MITIGATING BARRIER EMERGENCY RADIATION RADIATION EVENTS SYSTEMS INTEGRITY PREPAREDNESS SECURITY SAFETY SAFETY Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution Enclosure 2

Performance Indicators 17 Performance Indicators PIs for each cornerstone Licensee submits data to NRC quarterly Inspection program verifies accuracy Data available on NRC website Enclosure 2

Significance Threshold Performance Indicators Green White Yellow Red Increasing Safety Significance I

Inspection ti Findings Fi di Green White Yellow Red Increasing Safety Significance Enclosure 2

Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing

  • Safety Significance
  • Inspection
  • Management Involvement
  • Regulatory Action Enclosure 2

Industry-Wide Performance 3 11 As of 12/31/2011 11 Li Licensee R

Response

Regulatory Response Degraded Cornerstone Multiple/Repetitive Degraded Cornerstone Unacceptable IMC 0350 Process 88 Enclosure 2

Industry-Wide Inspection Findings Finding data current as of 2/24/2012 and does not include security findings 13 2 Calendar Year 2011 data Green 846 White 13 Yellow 2 Red 0 Enclosure 2

Industry-Wide Performance Indicators 9

Calendar Year 2011 data Green 6585 White 9 Yellow 0 Red 0 Enclosure 2

NRC Annual Assessment Summary Shearon Harris Nuclear Plant Progress Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

i t Shearon H Sh Harris i N Nuclear l Pl Plantt was in i th the Licensee Response Column of the NRCs ROP Action Matrix for the entire yyear of 2011.

Enclosure 2

NRC Annual Assessment Summary Shearon Harris Nuclear Plant All cornerstone objectives were met with all findings being very low safety significance (Green)

NRC plans baseline inspections at Shearon H i N Harris Nuclear l Pl Plantt for f 2012 Enclosure 2

NRC Inspectionp Activities Shearon Harris Nuclear Plant for 2011 2,920 hours0.0106 days <br />0.256 hours <br />0.00152 weeks <br />3.5006e-4 months <br /> of baseline and plant status inspection activities 2 resident inspectors on site - residents conduct routine inspections each quarter documented in a quarterly report and walk through the plant routinely 11 regional inspections 3 major team inspections Component Design Basis Problem Identification and Resolution Triennial Fire Protection Inspection Enclosure 2

Shearon Harris PIs and Findings January 1 through December 31, 2011 All Green Performance Indicators 15 Green Inspection Findings Enclosure 2

Progress Energy Response and Remarks Chris Burton Site Vice President Shearon Harris Nuclear Plant Enclosure 2

Actions in Response to the J

Japan N Nuclear l A Accident id t

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of

Contact:

OPA.resource@nrc.gov or 301-415-8200 Enclosure 2

Contacting the NRC Report an emergency

  • (301) 816-5100 816 5100 (call collect)

Report a safety concern

  • (800) 695 695-7403 7403
  • Allegation@nrc.gov G

General l information i f ti or questions ti

  • www.nrc.gov Contact Harris Nuclear Plant Resident Inspectors
  • 919-362-0601 Enclosure 2

End of Presentation Nuclear Regulatory Commission Region II Holly Springs Springs, NC April 9, 2012 Questions?